The draft survey report provides measurements and calculations for the ship Vitosha at the Port Aratu in Brazil. It finds:
- The mean draft forward and aft was 6.9655 meters initially.
- The draft amidships was 6.8940 meters initially with no correction needed.
- The displacement was calculated as 25,299.140 metric tons initially after correcting for trim, density, consumables, and ballast.
- The manifested cargo was 10,600 metric tons and the cargo found based on calculations was 10,470.324 metric tons, within 1.223% of the amount declared.
The draft survey report provides measurements and calculations for the ship Vitosha at the Port Aratu in Brazil. It finds:
- The mean draft forward and aft was 6.9655 meters initially.
- The draft amidships was 6.8940 meters initially with no correction needed.
- The displacement was calculated as 25,299.140 metric tons initially after correcting for trim, density, consumables, and ballast.
- The manifested cargo was 10,600 metric tons and the cargo found based on calculations was 10,470.324 metric tons, within 1.223% of the amount declared.
The draft survey report provides measurements and calculations for the ship Vitosha at the Port Aratu in Brazil. It finds:
- The mean draft forward and aft was 6.9655 meters initially.
- The draft amidships was 6.8940 meters initially with no correction needed.
- The displacement was calculated as 25,299.140 metric tons initially after correcting for trim, density, consumables, and ballast.
- The manifested cargo was 10,600 metric tons and the cargo found based on calculations was 10,470.324 metric tons, within 1.223% of the amount declared.
The draft survey report provides measurements and calculations for the ship Vitosha at the Port Aratu in Brazil. It finds:
- The mean draft forward and aft was 6.9655 meters initially.
- The draft amidships was 6.8940 meters initially with no correction needed.
- The displacement was calculated as 25,299.140 metric tons initially after correcting for trim, density, consumables, and ballast.
- The manifested cargo was 10,600 metric tons and the cargo found based on calculations was 10,470.324 metric tons, within 1.223% of the amount declared.
CARGO DESCRIBED AS TERMINAL TGS I NORTH Initial Final Date August 30th, 2022 Time 11:00/13:00 Location Aratu port
1. Draft Forward Corrected 6.6970 m m
Draft Aft Corrected 7.2340 m m Draft Fore & Aft Mean 6.9655 m 0.0000 m 2. Draft Amidships PORT 6.8790 m m Draft Amidships STBD 6.9090 m m Draft Amidships Keel correction 0.000 m 6.8940 m 0.0000 m
3. Draft Corrected for Deformation 6.9119 m 0.0000 m
4. Displacement 25,388.924 MT MT
5. Trim Correction -40.323 MT MT
Initial Final 25,348.601 0.000 6. Density Correction kg/m3 1.0230 Corr. -49.461 MT 0.000 MT
7. Displacement Corrected for Density 25,299.140 MT 0.000 MT
8. Consumables, Ballast, Etc. (a) Fuel Oils (b) Diesel Oil 218.300 (c) Fresh Water 77.000 (d) Ballast 5,268.616 (e) OTHERS 94.900 0.000 Total Consumables, etc. … 5,658.816 MT 0.000 MT
constant. Chief Officer Chief Officer All inspections are carried out to the best of our knowledge and ability, and our responsibility is limited to the exercise of reasonable care.