Professional Documents
Culture Documents
03 - Gib Electrical Bicycles - Fire Protection
03 - Gib Electrical Bicycles - Fire Protection
jpg
Fire extinguisher
DP
STORE Fire
exit
AREA
FR30
Fire Co²
exit
FR60
Fire extinguisher
COFFEE SD
SD CORNER
WORKSHOP
AREA
STORE
AREA SD
The contractor shall check and verify all dimensions, notes and conditions on site before any construction work is started. all discrepancies shall be reported to the architect. The contractor shall assume full and undivided responsibility for the accuracy, fit, 464 -
and stability of all parts of the work.
Do not scale off drawings.
Scale:
1:30
Size:
A2 03