Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

RENCANA ANGGARAN BIAYA (RAB)

PEMBANGUNAN GEDUNG PONPES TAHFIDZ AL-QUR’AN


MWCNU KECAMATAN BADAS KABUPATEN KEDIRI

Harga
No Volum Satua Jumlah
Uraian Satuan
. e n
(Rp) (Rp)
58.100.000,0
I. BAHAN
0
1 Semen 30 Sak 55.000,00 1.650.000,00
225.000,0
2 Batu Koral 5 M3 1.125.000,00
0
170.000,0 13.600.000,0
3 Pasir Urug 80 M3
0 0
4 Bata Merah 4500 Biji 700 3.150.000,00
5 Besi ø 10 mm 80 Btg 95.000,00 7.600.000,00
6 Besi ø 8 mm 80 Btg 50.000,00 4.000.000,00
7 Bendrat 15 Kg 30.000,00 450.000,00
8 Papan Cor 30 Lbr 20.000,00 600.000,00
225.000,0
9 Kayu Kamper 6 x 0,12 x 4 M 10 Btg 2.250.000,00
0
Kayu Kamper 0,35 x 0,12 x 4
10 6 Btg 88.000,00 528.000,00
M
175.000,0
11 Kayu Kamper 0,25 x 0,3 x 4 M 2 Btg 350.000,00
0
235.000,0
12 Kayu Kruwing 8 x 12 x 4 M 7 Btg 1.645.000,00
0
13 Kayu Kruwing 4 x 6 x 4 M 55 Btg 39.000,00 2.145.000,00
14 Kayu Kruwing 2 x 3 x 4 M 60 Btg 18.000,00 1.080.000,00
15 Kayu Sengon 4 x 6 x 4 M 30 Btg 20.000,00 600.000,00
16 Kayu Waru 2 x 3 x 4 M 20 Btg 8.000,00 160.000,00
11.200.000,0
17 Genting Layur 4000 Biji 2.800,00
0
18 Genting Bubung 30 Biji 7.000,00 210.000,00
19 Lis Plang Cor 0,3 x 4 M 11 Lbr 47.000,00 517.000,00
20 Keramik 40 x 40 cm 66 M2 60.000,00 3.960.000,00
21 Kalsibort 1 x 1 M 80 M2 16.000,00 1.280.000,00
11.900.000,0
II. UPAH
0
100.000,0
1 Tukang 51 HOK 5.100.000,00
0
2 Pekerja 80 HOK 85.000,00 6.800.000,00
TOTAL BIAYA I, II 70.000.000,00
(Tujuh puluh juta rupiah)
H. KHOIRUL BASAR, S.Pd, M.Pd SLAMET AR.
Ketua Bendahara

You might also like