Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

LANKA GPS LANKA

GPSLANKA GPS
MHT

FLOW

CLP SB
EP
MH

MHT

TP
LP
Tr AB
Tr

EP
TP AB AB
TP

TP

TH P
AB WF
SB
EP 16.5m

FLOW
P

MHW PLAN
SCALE 1 : 75 P
RW sc

-
1 -

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250

A12 A13
A06 A14 A06
ROAD LEVEL

A08 A15

COVER
1.0m
A09 BOTTOM OF EXISTING A9a A01 A9b A10 A11 A06 A07 A06 A05 A04 A03 A02 A01
TRUSS
COVER

BRIDGE DECK LEVEL


1.0m

A01 A02 A03 A04 A05 A06 A07 A06


FLOW 2500
16500
1500
GABION WALL EXISTING
SHEET PILE PROPOSED 900Ø DI
900Ø DI PROTECTION 17500
PROPOSED BORED PILE
PILE

28.3m

ELEVATION
SCALE 1 : 75

NOTES :- 9. GRID LINE MEASUREMENTS SHOULD BE CHECKED WITH


SCHEDULE OF PIPE FITTINGS & VALVES
1. ALL DIMENSIONS ARE GIVEN IN MILLIMETERS. ACTUAL SITE MEASUREMENT BEFORE STARTING ANY MARK MATRIAL DIA. LENGTH DESCRIPTION QTY.
2. ALL STRUCTURAL STEEL SHALL BE OF GRADE S275 & HOT FABRICATION WORK. A01 DI 900 - COUPLING (RESTRAINED) 03
ROLLED STEEL SECTIONS UNLESS NOTED OTHERWISE. 10. LIFTING LOCATIONS SHALL BE MAXIMUM 1 METER AWAY A02 DI 900 3000 SOCKET AND SPIGOT PIPE (RESTRAINED) 02
3. ALL NUTS AND BOLTS SHALL BE OF GRADE 8.8 UNLESS FROM END OF THE TRUSS. A03 DI 900 - 45° SOCKETED BEND (RESTRAINED) 02
A04 DI 900 6000 SOCKET AND SPIGOT PIPE (RESTRAINED) 02
NOTED OTHERWISE. 11. 50mm PRE- CAMBER TO BE DONE FOR THE TRUSS.
A05 DI 900 2000 FLANGE SPIGOT PIPE (RESTRAINED) 02
4. ALL BOLT HOLES SHALL BE MACHINE DRILLED. 12. APPLICATION OF PAINTING SHALL BE FOLLOWED AS PER
A06 DI 900 - 45° FLANGE BEND 06
5. HOLES FOR BOLTS SHALL NOT EXCEED THE DIAMETER OF SPECIFICATION.
A07 DI 900 1000 DOUBLE FLANGE PIPE 02
THE BOLT BY MORE THAN 2mm. 13. FOR HSFG BOIT, BOIT SHANK TENSION MUST GIVE AS
A08 DI 900 3000 DOUBLE FLANGE PIPE 01
6. ALL WELDS SHALL BE 10mm CONTINUOUS FILLET WELD SPECIFIED IN BS 4604:1970
A09 DI 900 4300 FLANGE SPIGOT PIPE (RESTRAINED) 01
2
WITH ELECTRODE CLASSIFICATION 35 N/mm AS SPECIFIED 14. ONLY TOP DIAGONAL BRACING ARE ALLOWED TO REMOVE SOCKET AND SPIGOT PIPE (RESTRAINED)
A9a DI 900 3100 01
IN BS 5950: 2000. TO PLACE DI PIPE IN TRUSS. DO NOT REMOVE TOP A9b 900 3100 DOUBLE SPIGOT PIPE (RESTRAINED) 01
DI
7. ALL MEMBERS TO BE WELDED ALONG THE FULL LENGTH OF HORIZONTAL BRACING FOR ANY CONDITION. A10 DI 900 6000 SOCKET AND SPIGOT PIPE (RESTRAINED) 01
PERIMETER WITH CONNECTIONS PLATES (EG, GUSSET A11 DI 900-150 - BRANCH FLANGE TEE 01
PLATE) OR CONNECTING MEMBERS. A12 - 150 - BUTTERFLY VALVE 01
8. ALL CONNECTION & FIXING DETAILS OF MEMBERS SHOULD A13 - 900 1300 DOUBLE ORIFICE AIR VALVE 01
BE VERIFIED BY THE SUPPLIER ACCORDING TO THEIR A14 DI 900 2200 FLANGE SPIGOT PIPE (RESTRAINED) 01
SPECIFICATIONS BEFORE SENT TO FABRICATION. A15 DI 900 2200 DOUBLE FLANGE PIPE 01

CLIENT: REV. DESCRIPTION DATE SIGN. DESIGNED: DRAWN: CHECKED: APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION DATE: SCALE:
NATIONAL WATER SUPPLY SYSTEM REHABILITATION FOR NRW REDUCTION
THAT THE DESIGN & BUILD CONTRACTOR IS
IN SOUTH PART OF THE COLOMBO CITY RESPONSIBLE FOR THE CONFORMITY OF THE DESIGN
AND DRAINAGE BOARD
WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS. 06.03.2020 AS SHOWN
CONTRACTOR. CONTRACT NO : GCWWMIIP/ADB/CIVIL/ICB/04 MAHESH SUMEERA ASHOKA
NATIONAL WATER SUPPLY AND DRAINAGE BOARD

TITLE: CERTIFIED CORRECT :


PROPOSED DISTRIBUTION NETWORK DRG.NO. REV.
SINOHYDRO CORPORATION FEEDER MAIN
BRIDGE CROSSING AT KIRULAPONA GCWWMIIP/P4/FM/BC/001 0
0 IISSUED FOR APPROVAL 06.03.2020 PROJECT MANAGER OF THE CONTRACTOR. DATE PROJECT DIRECTOR.
SHEET 01 OF 06
1 2 3 4 5 6 7 8 9 10 11 12
1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250
UB 203X133X25
Z2 ←VIEW "C"


VIEW "B"
UB 178X102X19

UB

UB

UB

UB

UB

UB
13

13

13

13
13
76X

76X

76X

76X
6X
127

127

127

127

127

127
X7
27X

27X

27X

27X
X7
X

X
127
2000

76X

76X

76X

76X

76X
6X
1

1
UB

UB

UB

UB

UB
13
13

13

13

13

13
VIEW "A"

UB 203X133X25

Z1 ←VIEW "D"

DETAIL "Z"
ELEVATION
SCALE 1 : 20

1 2 3 4 5 6 7 8 9 10 11 12
1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250
DETAIL "Y"

A
DETAIL "X" DETAIL "W" UB 203X133X25

TOP HORIZONTAL TOP HORIZONTAL TOP HORIZONTAL TOP HORIZONTAL TOP HORIZONTAL
BRACING BRACING BRACING BRACING BRACING
UB 127X76X13

EQA 50X50X6

EQA 50X50X6

EQA 50X50X6
2000

6
6

6
EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ
6

50X

50X

50X
0X

0X

0X

0X

0X

0X

0X
50X

A5

A5

A5

A5

A5

A5

A5

A5

A5

A5

A5
5

5
0X

0X

0X
50X

50X

50X

50X

50X

50X

50X
0X

0X

0X

0X

0X

0X

0X

0X
0X

0X

0X

0X
A5

A5

A5
A5

50X

50X

50X

50X

50X

50X

50X
50X

50X

50X

50X
A

A
EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ
EQ

6
6

6
TOP DIAGONAL TOP DIAGONAL TOP DIAGONAL TOP DIAGONAL TOP DIAGONAL TOP DIAGONAL TOP DIAGONAL TOP DIAGONAL TOP DIAGONAL TOP DIAGONAL TOP DIAGONAL
BRACING BRACING BRACING BRACING BRACING BRACING BRACING BRACING BRACING BRACING BRACING

UB 203X133X25

TOP VIEW
SCALE 1 : 20

1 2 3 4 5 6 7 8 9 10 11 12
1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250

UB 203X133X25
A
DETAIL "V" DETAIL "U"
1000
UB 178X102X19

UB 178X102X19

UB 178X102X19

UB 178X102X19

UB 178X102X19

UB 178X102X19
UB 127X76X13

LOCATION OF LOCATION OF LOCATION OF LOCATION OF LOCATION OF


2000

1225

PIPE SUPPORT 6 EQ PIPE SUPPORT 6 EQ 6 EQ PIPE SUPPORT 6 EQ PIPE SUPPORT 6 EQ PIPE SUPPORT
0X 0X 0X 0X 0X
EQ
6

A5 A5 A5 A5 A5
X5 X5 5 X5 5
50X

0X 0 0X X 0X 0X 0X 0X
0 0 50
A5

A5 50 A5 50 A5 50 50 A5 50
0X

X6 X6 X A X6 X6
0X

EQ EQ EQ 6 EQ EQ
A5

50X
EQ

1000

B
UB 203X133X25
BOTTOM VIEW
SCALE 1 : 20 NOTES :-
1. FOR NOTES REFER DRG. NO.GCWWMIIP/P4/FM/BC/001 (SHEET 01 OF 05)

CLIENT: REV. DESCRIPTION DATE SIGN. DESIGNED: DRAWN: CHECKED: APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION DATE: SCALE:
NATIONAL WATER SUPPLY SYSTEM REHABILITATION FOR NRW REDUCTION
THAT THE DESIGN & BUILD CONTRACTOR IS
IN SOUTH PART OF THE COLOMBO CITY RESPONSIBLE FOR THE CONFORMITY OF THE DESIGN
AND DRAINAGE BOARD
WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS. 06.03.2020 AS SHOWN
CONTRACTOR. CONTRACT NO : GCWWMIIP/ADB/CIVIL/ICB/04 MAHESH SUMEERA ASHOKA
NATIONAL WATER SUPPLY AND DRAINAGE BOARD

TITLE: CERTIFIED CORRECT :


PROPOSED DISTRIBUTION NETWORK DRG.NO. REV.
SINOHYDRO CORPORATION FEEDER MAIN
BRIDGE CROSSING AT KIRULAPONA DATE PROJECT DIRECTOR. GCWWMIIP/P4/FM/BC/001 0
0 IISSUED FOR APPROVAL 06.03.2020 PROJECT MANAGER OF THE CONTRACTOR.
SHEET 02 OF 06
A B A B
2000
2000
UB 203X133X25
Z2

Z2 VIEW "F"→
10mm MS PLATE EQA 50X50X6

UB 127X76X13

900Ø DI PIPE 50mm WIDTH MS.


STRAP (6mm THK.)
NEOPRENE BEARING
STRIP
50mm WIDTH MS.
STRAP (6mm THK.) UB 178X102X19 UB 178X102X19

2000

1700
UB 127X76X13 900Ø

TRUSS SUPPORT
M12 GALVANIZED
BOLT 100 M12 GALVANIZED BOLT
120°
100mm WIDTH MS.
PLATE (10mm THK.)

850
NEOPRENE BEARING 10 THK. PLATE

100
STRIP UB 127X76X13
250 DETAIL "T" 10mm THK. M.S. PLATE CUT
REFER TYPICAL 100 TO GIVEN SHAPE
WALKING PLATFORM DETAIL Z1 VIEW "F"→ (IN BOTH SIDE)
10 THK. STIFFENER
10mm MS PLSTE Z1 PLATE
UB 203X133X25
1225X100X10mm
M.S. PLATE 100mm WIDTH M.S. PLATE
2 NOS.M12 GALVANIZED BOLT UB 178X102X19 (10mm THK.) BEND AND
6mm FILLET WELD WELDED TO GIVEN SHAPE
2
- -

700
1225X100X10mm M.S. PLATE 6mm FILLET WELD
10 THK. STIFFENER
UB 178X102X19 2 NOS.M12 GALVANIZED BOLT
PLATE
100mm WIDTH M.S. PLATE
2NOS. OF M.S. PLATE (10mm (10mm THK.) BEND AND
THK.) CUT TO GIVEN SHAPE WELDED TO GIVEN SHAPE

PILE CAP ISOMETRIC VIEW FOR PIPE SUPPORT


TYPICAL CROSS SECTION WITH PIPE SUPPOR
T DETAIL AT GRID DETAIL AT GRID
400Ø BORED PILE
2 4 6 8 10 12 14
2 4 6 8 10 12 14
SCALE 1:15
SECTION 1
SCALE 1 : 15 - SCALE 1:15
A1 B1
2000

UB 203X133X25
UB 178X102X19

M.S. PLATE (10mm THK.) CUT TO GIVEN SHAPE

- -
4
1225X100X10mm M.S. PLATE
100X50 'C' CHANNEL
M12 GALVANIZED BOLT 2000 C/C 100X50 'C' CHANNEL
375
PLANE VIEW OF PIPE SUPPORT
50
DETAIL AT GRID 2000 100X50 'C' CHANNEL 20

100
2000 C/C
2 4 6 8 10 12 14

SCALE 1:15

450 1650 450


250 2050 250

3mm THK.
250

CHEQUERED PLATE

Ø400
100X50 'C' CHANNEL SECTION 4
6mm THK. CHEQUERED PLATE SCALE 1 : 5 -
400
900

TYPICAL SECTION OF WALKING PLATFORM


TYPICAL PLANE VIEW OF WALKING SCALE 1:5
PLATFORM DETAIL
250

SCALE 1:10
2550

SECTION 2 NOTES :-
SCALE 1 : 15 -
1. FOR NOTES REFER DRG. NO.GCWWMIIP/P4/FM/BC/001 (SHEET 01 OF 05)

CLIENT: REV. DESCRIPTION DATE SIGN. DESIGNED: DRAWN: CHECKED: APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION DATE: SCALE:
NATIONAL WATER SUPPLY SYSTEM REHABILITATION FOR NRW REDUCTION
THAT THE DESIGN & BUILD CONTRACTOR IS
IN SOUTH PART OF THE COLOMBO CITY RESPONSIBLE FOR THE CONFORMITY OF THE DESIGN
AND DRAINAGE BOARD
WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS. 06.03.2020 AS SHOWN
CONTRACTOR. CONTRACT NO : GCWWMIIP/ADB/CIVIL/ICB/04 MAHESH SUMEERA ASHOKA
NATIONAL WATER SUPPLY AND DRAINAGE BOARD

TITLE: CERTIFIED CORRECT :


PROPOSED DISTRIBUTION NETWORK DRG.NO. REV.
SINOHYDRO CORPORATION FEEDER MAIN
BRIDGE CROSSING AT KIRULAPONA DATE PROJECT DIRECTOR. GCWWMIIP/P4/FM/BC/001 0
0 IISSUED FOR APPROVAL 06.03.2020 PROJECT MANAGER OF THE CONTRACTOR.
SHEET 03 OF 06
3
UB 203X133X25 EA 50X50X6
525 UB 178X102X19
35 50 50 50 50 55 50 50 50 50 35
10mm CONTINUOUS 2
30
FILLET WELD
UB 178X102X19
130
70

4 NOS.M12 GALVANIZED 10mm CONTINUOUS 10mm MS PLATE

100
Z1\Z2

100
FILLET WELD
30

BOLT 10mm CONTINUOUS


FILLET WELD

100
M16 TORQUE GENERAL 10mm MS PLATE UB 127X76X13
GRADE HSFG BOLTS UB 203X133X25
10mm MS PLATE UB 203X133X25
PLAN
UB 127X76X13
SCALE 1:5
6mm STIFFENER PLATE 6mm STIFFENER PLATE
VIEW "F"
215 SCALE 1:5 UB 127X76X13
30 50 55 50 30 10mm MS PLATE UB 127X76X13
UB 203X133X25
VIEW "A" VIEW "B"
SCALE 1:5 SCALE 1:5
50 30

10mm MS PLATE
160

A/B
30 50

A/B
UB 178X102X19
UB 178X102X19 UB 203X133X25
A/B
UB 203X133X25 10mm CONTINUOUS
M16 TORQUE GENERAL
10mm MS PLATE 10mm CONTINUOUS FILLET WELD
GRADE HSFG BOLTS
FILLET WELD
ELEVATION
SCALE 1:5 UB 127X76X13
UB 178X102X19

TYPICAL CONNECTION DETAIL FOR TOP AND Z1


VIEW "E"
Z2 VIEW "E"
BOTTOM CHORD (AT JOINT) Z1
SCALE 1:5
4 NOS M16 G8.8 BOLTS
10mm MS PLATE
400X300X30mm
BASE PLATE UB 127X76X13
450
UB 127X76X13
50 50 50 50 50 50 50 50 50 10mm MS PLATE
400X300X30mm SOLE PLATE
20 40 20

VIEW "C"
80

SCALE 1:5 VIEW "D"


BEDDING MATERIAL SCALE 1:5
(NON-SHRINK
M12 TORQUE GENERAL 10mm MS PLATE CONSTRUCTION GROUT)

200
GRADE HSFG BOLTS
120X120X15mm PLATE UB 127X76X13
UB 203X133X25
PLAN
UB 178X102X19
SCALE 1:5
10mm CONTINUOUS
FILLET WELD

04
450 4 NOS.M12 GALVANIZED
10mm MS PLATE DETAIL "T" 6mm STIFFENER PLATE
BOLT
50 50 50 50 50 50 50 50 50 SCALE 1:5
UB 127X76X13

UB 127X76X13
25 40 25

10mm MS PLATE 4 NOS.M12 GALVANIZED


90

Z1
BOLT

VIEW "E" UB 203X133X25


SCALE 1:5
M12 TORQUE GENERAL 10mm MS PLATE
GRADE HSFG BOLTS 10mm MS PLATE
DETAIL "Z"
ELEVATION SCALE 1:5
SCALE 1:5

TYPICAL CONNECTION DETAIL FOR WEB


(WHERE NECESSARY)
SCALE 1:5

NOTES :-
1. FOR NOTES REFER DRG. NO.GCWWMIIP/P4/FM/BC/001 (SHEET 01 OF 05)

CLIENT: REV. DESCRIPTION DATE SIGN. DESIGNED: DRAWN: CHECKED: APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION DATE: SCALE:
NATIONAL WATER SUPPLY SYSTEM REHABILITATION FOR NRW REDUCTION
THAT THE DESIGN & BUILD CONTRACTOR IS
IN SOUTH PART OF THE COLOMBO CITY RESPONSIBLE FOR THE CONFORMITY OF THE DESIGN
AND DRAINAGE BOARD
WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS. 06.03.2020 AS SHOWN
CONTRACTOR. CONTRACT NO : GCWWMIIP/ADB/CIVIL/ICB/04 MAHESH SUMEERA ASHOKA
NATIONAL WATER SUPPLY AND DRAINAGE BOARD

TITLE: CERTIFIED CORRECT :


PROPOSED DISTRIBUTION NETWORK DRG.NO. REV.
SINOHYDRO CORPORATION FEEDER MAIN
BRIDGE CROSSING AT KIRULAPONA DATE PROJECT DIRECTOR. GCWWMIIP/P4/FM/BC/001 0
0 IISSUED FOR APPROVAL 06.03.2020 PROJECT MANAGER OF THE CONTRACTOR.
SHEET 04 OF 06
NOTES :- 2 3
1. FOR NOTES REFER DRG. NO.GCWWMIIP/P4/FM/BC/001 (SHEET 01 OF 05)
1 UB 203X133X25 UB 203X133X25
UB 178X102X19
UB 203X133X25 6mm STIFFENER PLATE 6mm STIFFENER PLATE
A A
10mm MS PLATE
2 NOS.M12 GALVANIZED
Z1\Z2
2 NOS.M12 GALVANIZED BOLT
2 NOS.M12 GALVANIZED
BOLT
BOLT

100
6mm STIFFENER PLATE

10

100
0
10

0
10mm MS PLATE 10mm MS PLATE
EQA 50X50X6

10
0
VIEW "H"
EA 50X50X6
EA 50X50X6
6mm STIFFENER PLATE
UB 127X76X13 VIEW "I"

DETAIL"Y" DETAIL "X" DETAIL "W"


18
SCALE 1:5 SCALE 1:5 SCALE 1:5
9
28
9

10mm CONTINUOUS 10mm CONTINUOUS


FILLET WELD FILLET WELD

UB 203X133X25 UB 203X133X25
DETAIL "A"
(SLOT & FREE END)
SCALE 1:2
10mm MS PLATE 10mm MS PLATE

6mm STIFFENER PLATE 6mm STIFFENER PLATE

VIEW "H" VIEW "I"


SCALE 1:5 SCALE 1:5
4 NOS M16 G8.8 BOLTS

UB178X102X19 10mm CONTINUOUS


400X300X30mm FILLET WELD
2 4
SLOE PLATE 18mmØ HOLE UB 203X133X25 UB 203X133X25

6mm STIFFENER PLATE 6mm STIFFENER PLATE


50

B B

10mm MS PLATE
300

2 NOS.M12 GALVANIZED EA 50X50X6 EA 50X50X6


BOLT
50

50 400 50 1500 50 400 50

2000 10mm MS PLATE 2 NOS.M12 GALVANIZED 10mm MS PLATE


BOLT
UB 178X102X19 UB 178X102X19
A B 10mm MS PLATE
10mm MS PLATE
FIXED END
SCALE 1:10

VIEW "J" VIEW "K"

DETAIL "V" DETAIL "U"


SCALE 1:10 SCALE 1:10

A B
2000

50 400 50 1500 50 400 50


50

DETAIL "A" 10mm MS PLATE 10mm MS PLATE


UB 178X102X19 UB 178X102X19
300

15 10mm CONTINUOUS 10mm CONTINUOUS


FILLET WELD FILLET WELD

8 NOS.M12 GALVANIZED 8 NOS.M12 GALVANIZED


50

BOLT BOLT

400X300X30mm
SLOE PLATE 10mm CONTINUOUS
UB178X102X19 FILLET WELD UB 203X133X25 6mm STIFFENER PLATE UB 203X133X25 6mm STIFFENER PLATE
4 NOS M16 G8.8 BOLTS

FREE END VIEW "J" VIEW "K"


SCALE 1:10
SCALE 1:5 SCALE 1:5

CLIENT: REV. DESCRIPTION DATE SIGN. DESIGNED: DRAWN: CHECKED: APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION DATE: SCALE:
NATIONAL WATER SUPPLY SYSTEM REHABILITATION FOR NRW REDUCTION
THAT THE DESIGN & BUILD CONTRACTOR IS
IN SOUTH PART OF THE COLOMBO CITY RESPONSIBLE FOR THE CONFORMITY OF THE DESIGN
AND DRAINAGE BOARD
WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS. 06.03.2020 AS SHOWN
CONTRACTOR. CONTRACT NO : GCWWMIIP/ADB/CIVIL/ICB/04 MAHESH SUMEERA ASHOKA
NATIONAL WATER SUPPLY AND DRAINAGE BOARD

TITLE: CERTIFIED CORRECT :


PROPOSED DISTRIBUTION NETWORK DRG.NO. REV.
SINOHYDRO CORPORATION FEEDER MAIN
BRIDGE CROSSING AT KIRULAPONA DATE PROJECT DIRECTOR. GCWWMIIP/P4/FM/BC/001 0
0 IISSUED FOR APPROVAL 06.03.2020 PROJECT MANAGER OF THE CONTRACTOR.
SHEET 05 OF 06
PILE CAP TOP LEVEL

75
PILE CUT OFF LEVEL 900

- -
3

PILE CAP

75

700
6T16
T16 @ 200

75
PILE CUT OFF LEVEL

T10 @ 200

75
T10 @ 200
BINDING CONCRETE LAYER
(FOR UNDERGROUND CONSTRUCTION) 6T16

400Ø BORED PILE T16 @ 200 TYP. PILE REINFORCEMENT DETAIL


SCALE 1:15
4T16 6T16

BED ROCK TYPICAL DETAIL OF PILE CAP


SCALE 1:15

5
12

12
T10 @ 200

5
SPECIAL END DETAIL OF STIRRUPS
1000 MIN

SCALE 1:15
PILE CAP REINFORCEMENT DETAIL
SCALE 1:15

6T16
T16 @ 200
TYPICAL PILE DETAIL
SCALE 1:15

T16 @ 200
4T16 6T16

SECTION 3
SCALE 1 : 15 -

NOTES :-
1. FOR NOTES REFER DRG. NO.GCWWMIIP/P4/FM/BC/001 (SHEET 01 OF 05)

CLIENT: REV. DESCRIPTION DATE SIGN. DESIGNED: DRAWN: CHECKED: APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION DATE: SCALE:
NATIONAL WATER SUPPLY SYSTEM REHABILITATION FOR NRW REDUCTION
THAT THE DESIGN & BUILD CONTRACTOR IS
IN SOUTH PART OF THE COLOMBO CITY RESPONSIBLE FOR THE CONFORMITY OF THE DESIGN
AND DRAINAGE BOARD
WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS. 06.03.2020 AS SHOWN
CONTRACTOR. CONTRACT NO : GCWWMIIP/ADB/CIVIL/ICB/04 MAHESH SUMEERA ASHOKA
NATIONAL WATER SUPPLY AND DRAINAGE BOARD

TITLE: CERTIFIED CORRECT :


PROPOSED DISTRIBUTION NETWORK DRG.NO. REV.
SINOHYDRO CORPORATION FEEDER MAIN
BRIDGE CROSSING AT KIRULAPONA DATE PROJECT DIRECTOR. GCWWMIIP/P4/FM/BC/001 0
0 IISSUED FOR APPROVAL 06.03.2020 PROJECT MANAGER OF THE CONTRACTOR.
SHEET 06 OF 06