Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Main Contractor

31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000
300000
10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 FUJITA CORPORATION

A D.C. EXISTING WALL + EP .C.D


EXISTING WALL + EP EXISTING WALL + EP D.C.

EXISTING WALL + EP EXISTING WALL + EP EXISTING WALL + EP .C.D .C.D


EXISTING WALL + EP

313-F
D.C.

SAT SAT SAT SAT SAT

TOILET ROOM (F) L L L L L L


L L
L L L L

P.VỆ SINH (NỮ)

LỐI RA LỐI RA
CH=3FL+2444

CH3000

CH3000

CH3000
9500

EXISTING WALL + EP

EXISTING WALL + EP
AHU MACHINE ROOM 3 DN ELECTRIC ROOM-2 CLEAN WATER PROCESSING ROOM 2 AHU MACHINE ROOM 4 UP
STAIRCASE S6
313-M P.MÁY AHU 3 THANG BỘ S6 PHÒNG ĐIỆN-2 P. XỬ LÝ NƯỚC SẠCH 2 P. MÁY AHU 4
TOILET ROOM (M) 332-3 333-2 334-2 332-4 STAIR CASE 4
THANG BỘ 4
S4
P.VỆ SINH (NAM)
CH=3FL+2444

T
T

C
D.C.

B
SAT SAT SAT
GYPSUM 9.0 (CORRIDOR)+65+ SILICATE 6.0 + EP ( INSIDE) GYPSUM 9.0 (CORRIDOR)+65+ SILICATE 6.0 + EP ( INSIDE) GYPSUM 9.0 (CORRIDOR)+65+ SILICATE 6.0 + EP ( INSIDE) GYPSUM 9.0 (CORRIDOR)+65+ SILICATE 6.0 + EP ( INSIDE)

D.C.

D.C.
H H
T

D.C.
D.C.

D.C.

D.C.

.C.D

D.C.

D.C.

.C.D

.C.D

D.C.

D.C.

D.C.

D.C.

.C.D

.C.D

.C.D

.C.D

.C.D

.C.D

D.C.

D.C.

.C.D

.C.D

D.C.

D.C.

D.C.

D.C.
T T T T T C T T T T T T T T T T T T T T T T T T T T
C H H

C C C C C T C C C C C C C C C C C C C C C C C C C C S
VP VP VP VP VP VP

CORRIDOR HÀNH LANG 328 CORRIDOR HÀNH LANG 328

T
C

C
T

TC

CT

C
T
CLEAN PANEL CLEAN PANEL CLEAN PANEL CH=3FL+3000 CLEAN PANEL CLEAN PANEL
CH=3FL+3000 CLEAN PANEL CLEAN PANEL

D.C.
D.C.
C D.C.
D.C. .C.D D.C. D.C. D.C. D.C.
C

T
T

PJ Name
9500
UP

NIPRO

D.C.
C

CLEAN PANEL
RECEIVING
INSPECTION RM
9500

P.KIỂM TRA PACKING ROOM


TIẾP NHẬN PHÒNG ĐÓNG GÓI
328-1 325
CH=3FL+3500 CH=3FL+3500

CLEAN PANEL
ASSEMBLY ROOM
PHÒNG LẮP RÁP
301-5/6
D CH=3FL+3500
PJ NO.

CLEAN PANEL
V6
9500

INSPECTION RM
P.KIỂM TRA
328-2
CH=3FL+3500

5
E

5
9500

PARTS RM 1
P.LƯU TRỮ 1 MOLD PARTS PREPARATION ROOM
328-3 PHÒNG CHUẨN BỊ KHUÔN
CH=3FL+3500 V5 ASSEMBLY ROOM 303
PHÒNG LẮP RÁP CH=3FL+3500
301-5/6
CH=3FL+3500
F
9500

CLEAN PANEL
PARTS RM 2

D.C.
T

P.LƯU TRỮ 2 C

328-4

Approval
CH=3FL+3500

G GYPSUM 9.0+65+9.5 + VP

V1
EV-6 V1,V2-PROCESS MANAGEMENT RM
V1,V2-P.QUẢN LÝ QUY TRÌNH
302
9500

327 ASSEMBLY ROOM


STAFF OFFICE PHÒNG LẮP RÁP
GYPSUM 9.0+65 + VP

CLEAN PANEL
VĂN PHÒNG NHÂN VIÊN 301-1/2
CH=3FL+3500 DS 3-3 CH=3FL+3500

6
393

H T

C
D.C.

GYPSUM 9.0+65 + VP

Checker
DIRTY SIDE CLEAN SIDE

CLEAN SIDE
142500

CLEAN PANEL CLEAN PANEL CLEAN PANEL

6
FUTURE AREA
9500

D.C.
DIRTY SIDE
C

H H
T

DIRTY SIDE CLEAN SIDE


KHU VỰC TƯƠNG LAI H H

DIRTY SIDE
DIRTY SIDE
DS 2-6
CLEAN PANEL CLEAN PANEL CLEAN PANEL
STAIR CASE 2

7
CLEAN SIDE
CLEAN SIDE

THANG BỘ 2
DIRTY SIDE

DIRTY SIDE
CLEAN SIDE

CLEAN SIDE

296 HANDRAIL SUS

DN
S2

EDICLEAN
EDDIRTY
IS YTRSIDE

S NAELSIDE
ID

C
GYPSUM 9.0+65 + VP
.C.D

C H H

I T H H

DS 3-4
GYPSUM 9.0+65 + VP

394 MATERIAL SUPPLY CORRIDOR

7
HÀNH LANG CUNG CẤP VẬT LIỆU
9500

CH=3FL+3500
ASSEMBLY ROOM
EV-7 PHÒNG LẮP RÁP
301-1/2
CH=3FL+3500
V2 BUNDLE PREPARATION ROOM
J PHÒNG CHUẨN BỊ GÓI
GYPSUM 9.0+65 + VP
304
CH=3FL+3500
9500

PACKING ROOM
PHÒNG ĐÓNG GÓI

CLEAN PANEL
325
CH=3FL+3500
Revision
K

REV 00

CLEAN PANEL
9500

V4
ASSEMBLY ROOM
REV 01 (20211005)

8
PHÒNG LẮP RÁP
301-3/4
CH=3FL+3500
L

8
HAND STERILIZATION RM CLEAN SUIT DRESSING RM (M)
9500

PACKING INSPECTION ROOM


PHÒNG KIỂM TRA ĐÓNG GÓI P. KHỬ TRUNG TAY P. MẶC ĐỒ SẠCH (NAM)
326 C T
V3 CH=3FL+3250 CH=3FL+3250
D.C.
CLEAN PANEL

M CLEAN SUIT DRESS ROOM (F)


P. MẶC ĐỒ SẠCH (NỮ) WORKER REST ROOM
CH=3FL+3250 PHÒNG NGHỈ NGƠI
CH=3FL+3000
9500

321
UNDRESSING (F)
P. THAY ĐỒ (NỮ)
CH=3FL+3250

UNDRESSING (M)
N P. THAY ĐỒ (NAM)

DIRTY SIDE

CLEAN SIDE
1 1 2 2 3 3 4 4 CH=3FL+3250
T

D.C.
MINI PLANT ROOM
9500

CLEAN PANEL
P. DÂY CHUYỀN THỬ NGHIỆM

CLEAN SIDE
UP
305

TOILET (M) 3-1 CLEAN PANEL CLEAN PANEL


T

C
T

CLEAN PANEL

D.C.
CLEAN PANEL
NHÀ VỆ SINH (NAM) 3-1

DIRTY SIDE
CH=3FL+2444 CORRIDOR HÀNH LANG 328 CORRIDOR HÀNH LANG 328
CC

TT

CC

T
T

T
VP
CH=3FL+3000
VP
CH=3FL+3000
VP
T
VP

.C.D
C D.C. C D.C.
.C.D
C C T C C C C C C C C C C C
T
SAT T C C D.C. .C.DD.C.
C

O
C H H
T C T T T C C T T T T T T T T T T T T T
D.C.
C T
.C.D

D.C.

.C.D

.C.D

.C.D

.C.D

D.C.

D.C.

D.C.

.C.D

D.C.

.C.D

.C.D

.C.D

D.C.

.C.D

.C.D

.C.D

.C.D
D.C.

D.C.
GYPSUM 9.0 (CORRIDOR)+65+ SILICATE 6.0 + EP ( INSIDE) GYPSUM 9.0 (CORRIDOR)+65+ SILICATE 6.0 + EP ( INSIDE) GYPSUM 9.0 (CORRIDOR)+65+ SILICATE 6.0 + EP ( INSIDE) H H
D.C.

D.C.

D.C.

D.C.
SAT SAT

C
TOILET (F) 3-1 T T T

C
SAT SAT
C C

ELEVATOR ROOM STAIRCASE 3

.C.D
D.C.

.C.D

EXISTING WALL + EP
NHÀ VỆ SINH (NỮ) 3-1 329-F PHÒNG THANG MÁY
THANG BỘ 3
S3
CH=3FL+2444 329-M 331
9500

NEW BRICK WALL + EP

AHU MACHINE ROOM 1 330-M 330-F

EXISTING WALL + EP
AHU MACHINE ROOM 2 CLEAN WATER PROCESSING ROOM 1 ELECTRIC ROOM 1 AHU MACHINE ROOM 6

EXISTING WALL + EP

NEW BRICK WALL + EP


CH3000
UP

P.MÁY AHU 2 P. XỬ LÝ NƯỚC SẠCH 1 PHÒNG ĐIỆN 1 P. MÁY AHU 1 P. MÁY AHU 6
T

332-2 334-1 332-1 332-6 CH3000


333-1
C
D.C.

EXISTING WALL + EP
S
EV-8
(Future) EV-9
D.C. D.C.

STAIRCASE 5 SAT SAT

D.C.
STAIR CASE 7

L
THANG BỘ 5
C

L
THANG BỘ 7 DN L L L L L L L L

S5
L L

S7 SAT SAT
SAT
SAT

EXISTING WALL + EP EXISTING WALL + EP EXISTING WALL + EP EXISTING WALL + EP


D.C. D.C. D.C. D.C. D.C.

EXISTING WALL + EP EXISTING WALL + EP EXISTING WALL + EP


P

LỐI VÀO TOILET (M) 3-2


P. VỆ SINH (NAM) 3-2
TOILET (F) 3-2
P. VỆ SINH (NỮ) 3-2
LỐI RA
CH=3FL+2444 CH=3FL+2444

PLAN

Remark

【Shop】

date

: PIPE RACK plan name

AC DUCTING PLAN - 3FL


: FIRE PROTECTION WALL
(UP TO SLAB)
scale 1/500
: FIRE PROTECTION WALL MS-AC-13
(UP TO CEILING)

You might also like