Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

GENERAL NOTES:

* COPYRIGHTS RESERVED.
* DESIGN OR DRAWING NOT TO BE USED WITHOUT WRITTEN
PERMISSION
* NO DIMENSIONS ARE TO BE SCALED FROM THIS DRAWING
W02 * WHERE DISCREPANCIES OCCUR BETWEEN THE PROJECT
W0 1 DRAWINGS OR SPECIFICATIONS, THESE SHOULD BE REPORTED
W02 Tiles IMMEDIATELY TO THE ARCHITECT.
2,53 m
W01 W0 1
CONSTRUCTION NOTES:
FOUNDATIONS
1. Excavations for foundations to be approved by engineer before casting of

2
W0

W0
Bedroom 02 concrete
15,75 m2 Kitchen/Lounge 2. All foundations to be built on firm in-situ soil.

W01

W01
W01

D02
13,97 m2 3. All foundation walls to be filled with concrete with brickforce every course.

ROAD

ROAD
FLOOR CONSTRUCTION

D03
40 000

COVERED PATIO

COVERED PATIO

COVERED PATIO
1. 30mm average layer of clear river sand on 150mm layer of well selected

W02

W02
40m BOUNDARY WALL hardcore all to be satisfactory ant proofed.
Rondavel 2. Gunplas USB green continuous damp proof membrane under surface bed

D02

D02
D03 36,94 m2
D03 with orange hyperlastic vertival damp proof membrane with 115mm

9,17 m2
2.0m BUILDING LINE

8,09 m2

8,13 m2
W03 protecting wall to every change in level.
Pass
W0 2

3. 150mm thick concrete surface bed with ref. 193 mesh wire.

D07
Bath 2,98 m2 W03 W03
GYM BATH
4. 30mm thick screed to suit vinyl tiles.

W03
D03

Tiles
D03

6,17 m2

W03

D07
7,19 m2 PATIO D07 5. Meranti skirting (150x19mm)

D02

W01

W01
Tiles
W-I-C

W01
7,38 m2

D07
Tiles

STRUCTURAL NOTES

W01
D04
Bedroom 01
10,11 m2
SCULLERY/LAUNDRY

W01
Tiles

W0

W0
13,97 m2 13,99 m2
ENSUITE 1. Walls to have brickforce every third course.

2
Tiles GYM
PANTRY 16,42 m2
2. Window to have two courses of brickforce under cills.
N
Carpet
W0

D05
Tiles 36,00 m2
WIC 3. Internal doors to have concrete lintels over.
2

3,42 m2
MASTER BEDROOM

D03
Carpet

F
4,24 m2

D03
D07 20,35 m2

W0 1 W0 1 PORCH KITCHEN PSG


ROOF CONSTRUCTION

W01
D06

D07
1 BEDROOM RONDAVEL FLOOR
Tiles Tiles
Tiles

W0 1
22,71 m2 2,99 m2
6,18 m2
W01 W01
D01 D07 1. Roof pitch (see Section) to suite 0.6mm thick Craftlock,Charcoal grey (Colour) Chromadeck
PLAN RONDAVEL FLOOR PLAN BATH 03
D03
W01
D03
roof sheets or similar approved complete with all

W01
W01 Tiles

1:100

W03
3,82 m2

1:100 STUDY
D07
COVERED PATIO
Tiles
the necessary fitings as required.
Tiles
7,96 m2
45,24 m2 2. Trusses to be constructed by specialists (see Section)
TV ROOM
3. Ceiling to be 6.4mm Gypsum plasterboards with taped joints on 38x38mm branders at 400
TOILET 1 Tiles
D07 BEDROOM 03
W03

D07
2 BEDROOM RONDAVEL FLOOR
23,03 m2 Tiles
D01
DINNING/LOUNGE 16,83 m2 c/c.
Tiles

D07
Tiles

PLAN 42,60 m2 SWIMMING POOL 4. Polyurethane moulded cornice.

W01
2,53 m2 D04

1:100 5. R.C Water proof Gutters and downpipes not to be visible from exterior,well encased in

W02
W01 W01
TOILET 2
W03

D07

PORCH drainage ducts see detail and elevations.

D02
Tiles ENTRY FOYER
BOMA

D06
Tiles COVERED PATIO
5,65 m2 Tiles
2,53 m2 Tiles
INTERNAL FINISH
7,18 m2
W01 18,61 m2
SWIMMING POOL

W02
1. Render and set plaster with steel float finish.
PERGOLA

W03
CLOAK

D07
W.C

VEHICLE ENTRANCE/NO OBSTRUCTION


Tiles Tiles D08 Tiles
4,73 m2
2. Interior quality PVA coats to provide final cover with all necessary

D04
2,53 m2 2,95 m2

PSG BEDROOM 01
undercoats.
Tiles Tiles

2.0m BUILDING LINE


7,96 m2 14,19 m2

EXTERNAL FINISH

D07
D07
W03 1. Render and set plaster with steel float finish.

D01
2 CAR GARAGE BATH 01

W03
Tiles Tiles
37,20 m2 5,08 m2
D03 2. Exterior quality PVA coats to provide final cover with all necessary
D04

D07
undercoats.

D07
GYM BATH
W03 W03

W03
Tiles BEDROOM 02 BOMA

D07
W01 W01
DRAINAGE

D03
DRESSING Tiles 20,14 m2

3.0m BUILDING LINE

1.5m BUILDING LINE


80m BOUNDARY WALL

80m BOUNDARY WALL


6,17 m2

D03

D03
W03
18,45 m2
Tiles

D07
BATH 02 5,03 m2
1. 100mm diameter PVC drainage pipes laid in a one pipe system to min. fall

W03
Tiles
COVERED PATIO

D01
5,19 m2
PATIO D07
ENTERTAINMENT
Carpet
36,31 m2
Tiles
72,05 m2 1:40
Tiles W03 W01
2. Manholes to be constructed in 230 \mm blockwork plastered inside a

60 000
W-I-C

W01
7,38 m2
D07

75mm concrete base. Invert level to be determined on site.


Tiles

W01
3. 100mm diameter SVP

W01
D04 10,11 m2
SCULLERY/LAUNDRY

W01

W01
4. Wate and soil to have reseal traps.

W01
Tiles 5. All drainage to connect to existing public main sewer pipes.
13,99 m2
ENSUITE

11
1
2
3
4
5
6
7
8
9
10

12
13
14
15
15 x 200 = 3 000

Tiles STORM WATER


GYM

ROAD

ROAD
GROUND FLOOR PLAN
PANTRY 16,42 m2
Carpet 1:100 1. At all times the ground to be graded away from the building and

D05

PROPOSED WATER TANKS


Tiles 36,00 m2 PAVED AREA
PROPOSED 3-CAR CARPORT
stormwater to be directed away from the building.
3,42 m2 2. Allow for necessary cuttings and building up levels retaining walls,
MASTER BEDROOM
stone pitching etc where necessary.
D03

Carpet
F

D03
D07 20,35 m2 LIGHTNING PROTECTION

80 000
PORCH KITCHEN PSG 1. The whole roof is to be satisfactory protected in accordance with

W01
D06

D07

Tiles Tiles S.A.BS.034 1976(or latest edition) and must consist of bonding down
Tiles 22,71 m2 2,99 m2
6,18 m2 conductors, earth conductors and water mains earth terminals.

SMALL GATE
W01 W01
D01 D07
D03 D03 MUNICIPAL STAMP:
BATH 03 W01
W01

Tiles
W03

3,82 m2 W02
W01
D07 W 02

STUDY COVERED PATIO


Tiles

BROILER FEEDER PAN


Tiles 45,24 m2 Bedroom 02
7,96 m2 15,75 m2 Kitchen/Lounge

W01

D02
TV ROOM
13,97 m2
PAVED AREA
D07 BEDROOM 03

D03

COVERED PATIO
Tiles PAVED AREA
23,03 m2 Tiles
D01 D03

DINNING/LOUNGE 16,83 m2

9,17 m2
WATER PAN
D07

Pass

W02

BROILER SHED
WALKWAY
Bath 2,98 m2
Tiles

D03
D03
SWIMMING POOL 7,19 m2 WATER PAN

D02
42,60 m2
W01

Bedroom 01
D04 13,97 m2

W0
WIC

BROILER FEEDER PAN


2
4,24 m2
W02

W01 W01 EXISTING STRUCTURE


W01
W01 CLIENT NAME:
PAVED AREA

PORCH
D02

BOMA TOILET 1

W03

D07
2 BEDROOM RONDAVEL FLOOR Tiles
ENTRY FOYER PLAN
D06

Tiles COVERED PATIO 1:100


2,53 m2
TOILET 2 Sibusiso Mabaso

W03

D07
5,65 m2 Tiles Tiles
Tiles W01
2,53 m2
1.0m BUILDING LINE
7,18 m2
18,61 m2
SWIMMING POOL PROJECT:

2
W02

W0
20m BOUNDARY WALL

W01
PAVED AREA 20 000

Proposed Main House,3-Car Carport,Broiler shed,Water tanks & Rondavels.

COVERED PATIO
PERGOLA
W03

CLOAK
D07

W02
W.C Rondavel

D02
Tiles Tiles D08 Tiles 36,94 m2

8,13 m2
4,73 m2 DRAWING TITLE:
D04

2,53 m2 2,95 m2

W01
PSG BEDROOM 01

W0
2
Tiles Tiles Ground Floor Plans & Site Plan
7,96 m2 14,19 m2 W01

1.5m BUILDING LINE


ROAD

ROAD
RONDAVEL FLOOR PLAN
DRAWING REVISIONS:
D07

1:100
REV 1
D07 REV 2

20 000
W01
D01

REV 3
2 CAR GARAGE BATH 01 REV 4
W03

2
W0
Tiles Tiles INDEMNITY

W01
37,20 m2 5,08 m2 EN-SUITE
7,55 m2
The Contractor or client indemnifies the Architect from any claim that may

COVERED PATIO
PAVED AREA
D03

W02
D04 arise from any obscurities and / or any bona fide oversights not pointed out

D02
D03
BEDROOM/KITCHEN

8,09 m2
20,14 m2
D07

WIC
to, discussed with or resolved by the parties concerned before construction
6,91 m2
commenced - refer to GENERAL NOTES above.

W01
W0
Cognizence is taken of the fact that construction may not commence prior to

2
BEDROOM 02 BOMA N
D07

W01 W01 the approval of the plans by the relevant Local Authority declining to issue
D03

DRESSING Tiles 20,14 m2 W01


2.0m BUILDING LINE
3.0m BUILDING LINE

1.5m BUILDING LINE

1 BEDROOM RONDAVEL FLOOR


D03

D03

Tiles
18,45 m2 PLAN
1:100 an occupation certificate compelling the contructor and / or client to submit
BATH 02 5,03 m2 as built plans for approval prior to the issuing of such occupancy certificate.
W03

20m BOUNDARY WALL


Tiles
COVERED PATIO 20 000
The Architect and / or draftsman will not accept any responsibility for any
D01

5,19 m2
ENTERTAINMENT Tiles
construction that commence prior to the building plans being approved or
Carpet 72,05 m2 SITE PLAN
36,31 m2 any deviations from the approved building plans during construction.
W03 W01 1:200 SIGNATURES
W01

Architectural Professional Client


W01

W01

SACAP PAD24751141

DESIGNER DRAWN BY SHEET NO. SHEET SIZE: vumar@rdmfive.com


1/1 A1 www.vhouseplans.com
Bronkhorstpruit 1020
11
1
2
3
4
5
6
7
8
9
10

12
13
14
15

15 x 200 = 3 000

DATE: SCALE:
44kruger street
April 2021 AS SHOWN
Farmbell Building Shop no 4
GROUND FLOOR PLAN SACAP Gauteng, ZA
REGISTRATION
1:100 PAD24751141 Cell: 0832311508
TANKS

GSPublisherVersion 0.0.100.100