IZHAR GROUP was established in 1959 by Engineer lzhar Ahmad Qureshi who was highly
regarded amongst the veteran engineer’s community of Pakistan. Since its inception, the
Group has now moved in 7th decade of successful innovative Construction Operations.
IZHAR GROUP is a multifaceted organization having an authority over innovative yet
economical building solutions and cherishes successful completion of numerous large
infrastructures, industrial, commercial, educational, and other development projects to its
credit. The addition of pre-fabricated steel buildings, Electro mechanical Services and Izhar
Housing to their portfolio over the years has not only revolutionized the construction sector
but has cemented their supremacy of being the largest Multidimensional Engineering entity
of Pakistan. Today Izhar Group of companies is in the third generation of its commercial
operations that is committed to deliver quality products, safely on time at a good value. Over
the decades, Izhar Group is known for its commitment, consistent performance, norms and
excellence thereby playing their part in the national growth.
IZHAR construction is the flagship company of the group and has to its credit numerous
large scale industrial, commercial, educational, infrastructure, power plants and other projects
and today it is one of the leading construction companies of Pakistan, after having earned
numerous outstanding recognitions of consistent performance matching international
standards of quality and safety
IZHAR concrete is the parent member of Izhar Group of Companies which is the pioneer and
the largest single entity engaged in manufacturing of pre-cast and pre-stressed concrete
components including but not limited to Double Tee Slabs, Smooth face slabs, Girders,
Transoms, Pavers, Kerb Stones, Hollow Core Slabs of widest range and variety in Pakistan
IZHAR steel is the largest Pakistani company furnishing pre-engineered steel building (PEB)
from conception to commissioning on turnkey basis and hence the only one to provide
prompt after sales. IZHAR Steel Pvt. Ltd. Has completed more than 1000 PEB buildings.
Izhar Steel is authorized to authorized to procure ASME certified equipment (U&S, PP, A
stamps) additional certification include R stamp issued by National Board of Boiler and
Pressure Vessel inspectors.
Izhar housing is committed to bring the limits of luxurious living at an affordable price, and
their customers have responded to the brand name positively. Izhar housing continues to
build residential complexes meeting housing requirements of masses at large.
MEP Solutions
MEP solutions is a contracting firm providing end to end solutions for mechanical, electrical
and plumbing works. Incorporated in July 2009, as a Private Limited company, MEPS is a
sister firm of Izhar Construction (Pvt) Ltd.
Green revolutions Pvt. Ltd. is a manufacturing concerns for specialized switch gears,
transformers and Cable Management Systems.
Accurate Pvt. Ltd. is a manufacturing concern focusing on Digital Energy Meters and Smart
Metering Solutions
British Oxygen Plant (BOC) Karachi Civil works of British oxygen plant building
at Port Qasim
Coca cola Head Office Building Lahore Construction of state-of-the-art head office
of Coca cola Pakistan
Silver-Oaks Residential Complex, Construction 13 story luxury residential
Islamabad complex
Week 2:
Project Life Cycle:
Design:
The First Contract was made for architectural design with Aedas Company. Aedas is an
architectural firm with eleven International offices founded by the Welsh architect Keith
Griffiths. Aedas provides services in architecture, interior design, urban design, master
planning and graphic design. After the initiation was done they contacted Izhaar Group of
Companies as per feasibility report. In the feasibility report client mentioned feasibility for:
Retail business
Initial expenses
Anticipated profitability
5000 people can visit per day and 50% will be potential customers
Rental value
After this engineering studies were done to measure the compatability tests for the land soils
were they up to mark as per their demands and Concrete RCC Re Enfoce Cement and
concrete was done. They decided to keep the central area for steal roofing while the rest of
the structure with RCC. They made a total of three floors for commercial use and due to
ground area being so large parking area was constructed there after this contract was handed
over.
Infrastructure:
A Legal Contract between Izhaar Group & Packages was signed. Purchase of Relevant
Materials for construction. For execution they commenced with main water supply system,
Road, Parking and grey structure of main building. Quality checks were done along with
audits and any further adjustments that were required. They monitored it through timeline as
the first floor is constructed within 2 to 2.5 months because whole grey structure was built in
10 to 11 months. Project Handed over to MEP Solutions.
Quality checks were done along with audits and any further adjustments that were required.
Project Moved onto next phase of Finishing which was done by a multinational company.
Fire Alarm system: Izhar Construction Company also installed an innovative fire alarm
system which is “Hydrant Pressurized Water Lines” to assist in emergency. In this system the
water can be immediately thrown over fire through the hose pipe