Government College University Lahore

Management Studies Department


Master’s in Business Administration
(2021-2023)

Submitted by
Tehreem Babar (814-MBA-21)
Iqra Faisal (816-MBA-21)
Saleena Saqib (806-MBA-21)
Aqsa Younas (822-MBA-21)

Semester
III

Course title:
Project Management

Submitted to:
Dr. Samnan Ali

Performing Organization introduction


IZHAR Group

IZHAR GROUP was established in 1959 by Engineer lzhar Ahmad Qureshi who was highly
regarded amongst the veteran engineer’s community of Pakistan. Since its inception, the
Group has now moved in 7th decade of successful innovative Construction Operations.
IZHAR GROUP is a multifaceted organization having an authority over innovative yet
economical building solutions and cherishes successful completion of numerous large
infrastructures, industrial, commercial, educational, and other development projects to its
credit. The addition of pre-fabricated steel buildings, Electro mechanical Services and Izhar
Housing to their portfolio over the years has not only revolutionized the construction sector
but has cemented their supremacy of being the largest Multidimensional Engineering entity
of Pakistan.  Today Izhar Group of companies is in the third generation of its commercial
operations that is committed to deliver quality products, safely on time at a good value. Over
the decades, Izhar Group is known for its commitment, consistent performance, norms and
excellence thereby playing their part in the national growth.

IZHAR Construction Pvt. Ltd.

IZHAR construction is the flagship company of the group and has to its credit numerous
large scale industrial, commercial, educational, infrastructure, power plants and other projects
and today it is one of the leading construction companies of Pakistan, after having earned
numerous outstanding recognitions of consistent performance matching international
standards of quality and safety

IZHAR Concrete Pvt. Ltd.

IZHAR concrete is the parent member of Izhar Group of Companies which is the pioneer and
the largest single entity engaged in manufacturing of pre-cast and pre-stressed concrete
components including but not limited to Double Tee Slabs, Smooth face slabs, Girders,
Transoms, Pavers, Kerb Stones, Hollow Core Slabs of widest range and variety in Pakistan

IZHAR Steel Pvt. Ltd.

IZHAR steel is the largest Pakistani company furnishing pre-engineered steel building (PEB)
from conception to commissioning on turnkey basis and hence the only one to provide
prompt after sales. IZHAR Steel Pvt. Ltd. Has completed more than 1000 PEB buildings.
Izhar Steel is authorized to authorized to procure ASME certified equipment (U&S, PP, A
stamps) additional certification include R stamp issued by National Board of Boiler and
Pressure Vessel inspectors.

IZHAR Housing Pvt. Ltd.

Izhar housing is committed to bring the limits of luxurious living at an affordable price, and
their customers have responded to the brand name positively. Izhar housing continues to
build residential complexes meeting housing requirements of masses at large.

MEP Solutions

MEP solutions is a contracting firm providing end to end solutions for mechanical, electrical
and plumbing works. Incorporated in July 2009, as a Private Limited company, MEPS is a
sister firm of Izhar Construction (Pvt) Ltd.

IZHAR Green Revolutions

Green revolutions Pvt. Ltd. is a manufacturing concerns for specialized switch gears,
transformers and Cable Management Systems.

IZHAR Accurate Meters

Accurate Pvt. Ltd. is a manufacturing concern focusing on Digital Energy Meters and Smart
Metering Solutions

Project technical brief

Client Packages Limited


Performing Organization Izhar Group
Scope 3 Storey Packages Mall:
Grey Structure, piling work, RCC Structure,
Block Masonry work, Supply and
Installation of wall cladding with FOC
insulation, External pavement and drainage,
Roof water proofing System, Providing and
laying of Screed, Supply and installation of
Facia work and structure steel, Structure
roofing system/Fabrication and Erection
Works, Communication, Security and
Electrical Distribution System.
Covered Area 1056000 Square Meter
Time Dec 2014 - Jan 2017
Cost Rs. 4942 million

Portfolio of Izhar Construction Pvt. Ltd.


Some of the projects of Izhar are:
Project Name Description
Hameed Latif Hospital Lahore Construction of grey structure for 16 story
(including 3 level basements) Hospital
building
Nishat stitching and sewing unit Lahore Construction of main plant and extension
works

British Oxygen Plant (BOC) Karachi Civil works of British oxygen plant building
at Port Qasim

Ghandhara Nissan Ltd. Car manufacturing Plant extension civil


work Pre-cast shells and boundary walls

Atlas Honda Ltd. Sheikhupura Extension of Atlas Honda motorcycle plant,


Civil and PEB works.
PTET Telecom tower Islamabad Construction of 30 story (including 4 level
basements) state of the art commercial
building
Attock Oil, Office building Moragh Construction of 14 story head office
Rawalpindi building. Scope includes Civil, electrical,
HVAC, Plumbing and finishing works

Nishat boutique Hotel, Lahore Construction of 12 story (3 level basement)


hotel building

Coca cola Head Office Building Lahore Construction of state-of-the-art head office
of Coca cola Pakistan
Silver-Oaks Residential Complex, Construction 13 story luxury residential
Islamabad complex

Week 2:
Project Life Cycle:

Phases Design Infrastructure MEP Finishing


Initiating Initiation started with Legal Contract Between Legal Contract Between Finishing was
architectural contract Izhaar Group & Izhaar Group & done via a
with company Aedas. Packages. Packages. multinational
company and
contract was
signed between
them and
packages.
Planning Compatibility tests Purchase of Relevant Purchase of Relevant
were conducted by Materials for Materials for
engineering team and construction. construction.
Mold defined concrete
RCC Re-Enforce
Cement and Concrete
Executing For execution they kept For execution they MEP (Mechanical,
the center area as of commenced with main Engineering &
steal roofing and rest of water supply system, plumbing) was done
the 3 floors with Re- Road, Parking and grey within 6-8 Months.
enforced cement and structure of main
concrete. building.
Monitoring This included the Quality checks were Quality checks were
& benchmark they set up done along with audits done along with audits
Controlling till now and was it and any further and any further
fulfilled. This was adjustments that were adjustments that were
measured via a report. required. They monitored required.
it through timeline as the
first floor is constructed
within 2 to 2.5 months
because whole grey
structure was built in 10
to 11 months.
Closing Project Handed over to Project Handed over to Project Moved onto next
Izhaar Group of MEP Solutions. phase of Finishing.
Companies.

Design:

The First Contract was made for architectural design with Aedas Company. Aedas is an
architectural firm with eleven International offices founded by the Welsh architect Keith
Griffiths. Aedas provides services in architecture, interior design, urban design, master
planning and graphic design. After the initiation was done they contacted Izhaar Group of
Companies as per feasibility report. In the feasibility report client mentioned feasibility for:

 Retail business
 Initial expenses
 Anticipated profitability
 5000 people can visit per day and 50% will be potential customers
 Rental value

After this engineering studies were done to measure the compatability tests for the land soils
were they up to mark as per their demands and Concrete RCC Re Enfoce Cement and
concrete was done. They decided to keep the central area for steal roofing while the rest of
the structure with RCC. They made a total of three floors for commercial use and due to
ground area being so large parking area was constructed there after this contract was handed
over.

Infrastructure:

A Legal Contract between Izhaar Group & Packages was signed. Purchase of Relevant
Materials for construction. For execution they commenced with main water supply system,
Road, Parking and grey structure of main building. Quality checks were done along with
audits and any further adjustments that were required. They monitored it through timeline as
the first floor is constructed within 2 to 2.5 months because whole grey structure was built in
10 to 11 months. Project Handed over to MEP Solutions.

MEP Mechanical Electrical and Plumbing:


A Legal Contract between Izhaar Group & Packages was signed. Purchase of Relevant
Materials for construction was done. MEP (Mechanical, Engineering & plumbing) was done
within 6-8 Months. In this project MEP Solution is involved in the following:

 Supply Installation Testing and commissioning of internal electrification.


 Supply Installation Testing and commissioning of Lighting Control & Occupancy
Sensing. Supply Installation Testing and commissioning of Standby Power
Generation System.
 Supply Installation Testing and commissioning of Ups & Central Battery System.
 Supply Installation Testing and commissioning of Grounding & Lighting Protection
System. Complete Supply Installation Testing and commissioning of Fair Alarm,
FM200 Fire Suppression, and Telephone.
 Supply Installation Testing and commissioning of Parking Guidance System.

Quality checks were done along with audits and any further adjustments that were required.
Project Moved onto next phase of Finishing which was done by a multinational company.

Fire Alarm system: Izhar Construction Company also installed an innovative fire alarm
system which is “Hydrant Pressurized Water Lines” to assist in emergency. In this system the
water can be immediately thrown over fire through the hose pipe