WEEKLY PROGESS REPORT

Seed Testing Lab-GGAS


WEEK 1
(20 Oct to 31 Oct, 2022)

Task Status
1. Compiled and reported the STL-PEQ report
2. Along each daily task regularly carried out and manage the germination experiments
in soil to fill the growth room as per Sir Nouman and Mam Farwa instructions before Complete
Mr. Tang visit.
3. Carried out germination test of 5 lots of pea and watermelon.
4. Updated the germination and vigor results of pepper and sweet pepper lots.
5. Shared a report of all previous results of around 40 watermelon lots with Sir
Nouman as per his demand.( These results are shared in the form of excel sheet,
graphical analysis and pictures of germination results in an ordered form)
6. Leave on 22 October due to Convocation
7. Updated the germination and vigor results of watermelon and pea lots
8. Shared the report of growth room with Mam Farwa about current conditions and
requirements for the improvement
9. Managed the lab, updated the growth room activities and fill the soft boards and set
the lab as per mam Farwa’s instruction before a day of Visit
10. Facilitate the Visit of Mr. Tang on 25, Oct 2022 as per my assigned duties.
11. 27 Lots of Watermelon were proceeded for germination test (including all the
Complete
protocols (from seed count, moisture test to germination test)
12. 1 lot of Bitter gourd, 3 lots of melon, and 1 lot of Tomato were proceeded for
germination test (including all the protocols (from seed count, moisture test to
germination test)
13. Updated the germination and vigor results of previous sweet pepper, pepper, and
cabbage lots.
14. Shift a lot of seedlings developed in the growth room to kitchen gardening section of
R&D farm.
15. All the seed lots results were shared in all formats (in whatsapp group, Seeds lots file
in soft form, and in warehouse result format).
16. Compile and report a portfolio file of Seed Testing Lab as per Mam Javaria and Mam
Farwa instructions.
17. Sick Leave on 31 Oct, 2022.
18. Managed and follow up the lab facilities, catalogues, result sheets (both in hard and
Regularly
soft forms) growth room and general JDS as per the instructions of Mam Farwa.
WEEKLY PROGESS REPORT
Seed Testing Lab-GGAS
WEEK 2
(1 Nov to 8 Nov, 2022)

Task Status
1. Managed the growth room and lab and reported the activities in accordance of the
Visit of S&W (from 1st to 5th Nov) along with the regular JDs and tasks.
2. Carried out experiments of multiple lots (pepper, melon, watermelon, Bittergord,
pea, tomato, gourds (Bottle, round, sponge) in sand cups and trays to fill the
growth room till 5th November on regular basis along with the regular tasks.
3. Reported the germination and vigor results of 28 watermelon, 1 Bittergord, 3
melon and 1 tomato lots in all formats (in whatsapp group, Seeds lots file in soft
form, and in warehouse result format).
4. Carried out the germination test of 29 lots (3 Squash, 1 onion, 9 sponge gourds,
3 melons, 2 bottle gourd (Latu), 5 bottle gourd, and 7 round gourds.
5. The germination and vigor results of above 29 lots and will share it on today
(9th Nov, 2022).
6. Facilitate the Visit of Mr. Rodney (S&W) on 5th Nov, 2022 as per my assigned Complete
duties.
7. Proceeded the germination test of 7 lots of pumpkins and results of these lots
will be updated on 9th Nov, 2022.
8. Leave on 7th Nov, 2022 due to domestic issue.
9. Proceeded the germination test of 23 lots (watermelon, melon, kareli, cucumber,
gourds (sponge, bottle, round, and Latu), gawarphali, squash, phut, and kakri).
10. Results of above 23 lots (watermelon, melon, kareli, cucumber, gourds (sponge,
bottle, round, and Latu), gawarphali, squash, phut, and kakri) will be shared on
14th November, 2022.
11. Conduct the germination results of 29 lots (3 Squash, 1 onion, 9 sponge gourds, 3
melons, 2 bottle gourd (Latu), 5 bottle gourd, and 7 round gourds.
12. Germination results of above lots will be shared today (9th Nov, 2022).
13. Managed and follow up the lab facilities, catalogues, result sheets (both in hard
and soft forms) growth room and general JDS as per the instructions of Mam Regularly
Farwa.

 In above 2 weeks there were 3 officials off days (*Sunday).


 On 23rd, 30th October & 6th November.