LEAD STATEMENT
SUB DATA
DATA
10 M2 2750.00
For pointing 1 M2 275.00
DETAILED ESTIMATE
201.08 M2
28.60 M3
28.60 M3
``
201.08 M2
1623.33M2
ABSTRACT ESTIMATE
1. 201.08 Dismantling of one course of pressed tile roof finish in 20.00 M2 4022.00
cement mortar
4. 201.08 Finishing the top of roof with one course of machine 1079.00 M2 216965.00
pressed tiles of size 23x23x2mm of approved quality laid
in cement mortar 1:3, mixed with 2% of water proofing
compound by weight of cement used and pointed with
same oiled mortar including mixing of red oxide etc,
complete. complying with standard specification and as
directed by the departmental officers
5. 1623.33 Painting two coats of newly plastered wall surface with 214.00 M2 347393.00
ready mixed plastic emulsion paint of first quality and of
approved colour over a priming coat including thorough
scrapping,clean removal of dirt,and including necessary
plaster of paris putty,wherever required etc, complying
with standard specification
7. 10.80 Painting old wood works with two coats of best 147.60 M2 1594.00
approved first quality and colour of synthetic enamel
paint including ordinary scrapping using brushes and
neat finishing etc,complete. Complying with standard
specification .( The make,quality and colour of paint
``
TOTAL 850000.00
``
ESTIMATE
Report to accompany along with the estimate for the work of “ Renovation work in
IT has been proposed by the temple authorities to work of“ Renovation work in
which an estimate is prepared . the estimate amount is RS – 8.50 Lakhs for the following are the
The necessary lumpsum provisions are made for centage @ 2% and labour welfare fund @ 1%The
current year schedule of rate for the year (2021-22) is adopted in the preparation of estimate.
LEAD STATEMENT
SUB DATA
DATA
1.89 lit Synthetic enamel paint fof iron 225.40 lit 426.00
1.11 Nos Painter/varnisher 1st class 688.00 Each 763.68
10 M2 1268.68
1 M2 126.90
DETAILED ESTIMATE
800.45M2
doors,windows,ventilators,windowbars
,balustradesetc, with two coats of best
approved first quality and colour of
synthetic enamel paint including
ordinary scrapping using brushes and
neat finishing etc,complete. Complying
with standard specification .( The
make,quality and colour of paint should
be got approved by the executive
engineer before use of works.
ABSTRACT ESTIMATE
1. 151.08 Dismantling of one course of pressed tile roof finish in 20.00 M2 3022.00
cement mortar
4. 151.08 Finishing the top of roof with one course of machine 1077.86 M2 162843.00
pressed tiles of size 23x23x2mm of approved quality laid
in cement mortar 1:3, mixed with 2% of water proofing
compound by weight of cement used and pointed with
same oiled mortar including mixing of red oxide etc,
complete. complying with standard specification and as
directed by the departmental officers
5. 800.45 Painting two coats of newly plastered wall surface with 214.00 M2 171296.00
water based exterior emulsion paint of first quality and
of approved colour over a priming coat including
thorough scrapping,clean removal of dirt,and including
necessary plaster of paris putty,wherever required etc,
complying with standard specification
7. 7.20 Painting old wood works with two coats of best 147.60 M2 1063.00
approved first quality and colour of synthetic enamel
paint including ordinary scrapping using brushes and
neat finishing etc,complete. Complying with standard
``
TOTAL 485000.00
``
ESTIMATE
Report to accompany along with the estimate for the work of “ Repairs and Repainting work in
IT has been proposed by the temple authorities to work of“Repairs and Repainting work in
which an estimate is prepared . the estimate amount is RS – 4.85 Lakhs for the following are the
The necessary lumpsum provisions are made for centage @ 2% and labour welfare fund @ 1%The
current year schedule of rate for the year (2021-22) is adopted in the preparation of estimate.
LEAD STATEMENT
SUB DATA
DATA
1.89 lit Synthetic enamel paint fof iron 225.40 lit 426.00
1.11 Nos Painter/varnisher 1st class 688.00 Each 763.68
10 M2 1268.68
1 M2 126.90
DETAILED ESTIMATE
800.45M2
doors,windows,ventilators,windowbars
,balustradesetc, with two coats of best
approved first quality and colour of
synthetic enamel paint including
ordinary scrapping using brushes and
neat finishing etc,complete. Complying
with standard specification .( The
make,quality and colour of paint should
be got approved by the executive
engineer before use of works.
ABSTRACT ESTIMATE
1. 151.08 Dismantling of one course of pressed tile roof finish in 20.00 M2 3022.00
cement mortar
4. 151.08 Finishing the top of roof with one course of machine 1077.86 M2 162843.00
pressed tiles of size 23x23x2mm of approved quality laid
in cement mortar 1:3, mixed with 2% of water proofing
compound by weight of cement used and pointed with
same oiled mortar including mixing of red oxide etc,
complete. complying with standard specification and as
directed by the departmental officers
5. 800.45 Painting two coats of newly plastered wall surface with 214.00 M2 171296.00
water based exterior emulsion paint of first quality and
of approved colour over a priming coat including
thorough scrapping,clean removal of dirt,and including
necessary plaster of paris putty,wherever required etc,
complying with standard specification
7. 7.20 Painting old wood works with two coats of best 147.60 M2 1063.00
approved first quality and colour of synthetic enamel
paint including ordinary scrapping using brushes and
neat finishing etc,complete. Complying with standard
``
TOTAL 485000.00
``
ESTIMATE
Report to accompany along with the estimate for the work of “ Repairs and Repainting work in
IT has been proposed by the temple authorities to work of“Repairs and Repainting work in
which an estimate is prepared . the estimate amount is RS – 4.85 Lakhs for the following are the
The necessary lumpsum provisions are made for centage @ 2% and labour welfare fund @ 1%The
current year schedule of rate for the year (2021-22) is adopted in the preparation of estimate.
LEAD STATEMENT
SUB DATA
DATA
1.89 lit Synthetic enamel paint fof iron 225.40 lit 426.00
1.11 Nos Painter/varnisher 1st class 688.00 Each 763.68
10 M2 1268.68
1 M2 126.90
DETAILED ESTIMATE
201.08 M2
28.60 M3
28.60 M3
``
201.08 M2
1623.33 M2
ABSTRACT ESTIMATE
1. 201.08 Dismantling of one course of pressed tile roof finish in 20.00 M2 4022.00
cement mortar
4. 201.08 Finishing the top of roof with one course of machine 1077.86 M2 216736.00
pressed tiles of size 23x23x2mm of approved quality laid
in cement mortar 1:3, mixed with 2% of water proofing
compound by weight of cement used and pointed with
same oiled mortar including mixing of red oxide etc,
complete. complying with standard specification and as
directed by the departmental officers
5. 1623.33 Painting two coats of newly plastered wall surface with 214.00 M2 347393.00
water based exterior emulsion paint of first quality and
of approved colour over a priming coat including
thorough scrapping,clean removal of dirt,and including
necessary plaster of paris putty,wherever required etc,
complying with standard specification
7. 10.80 Painting old wood works with two coats of best 147.60 M2 1594.00
approved first quality and colour of synthetic enamel
paint including ordinary scrapping using brushes and
neat finishing etc,complete. Complying with standard
``
TOTAL 850000.00
``
ESTIMATE
Report to accompany along with the estimate for the work of “ Repairs and Repaintingwork in
IT has been proposed by the temple authorities to work of“Repairs and Repainting work in
which an estimate is prepared . the estimate amount is RS – 8.50 Lakhs for the following are the
The necessary lumpsum provisions are made for centage @ 2% and labour welfare fund @ 1%The
current year schedule of rate for the year (2021-22) is adopted in the preparation of estimate.
LEAD STATEMENT
SUB DATA
DATA
DETAILED ESTIMATE
1325.29 M2
145.09 M2
145.09 M2
1325.29 M2
381.26 M2
ABSTRACT ESTIMATE
1. 1325.29 Dismantling of one course of pressed tile roof finish in 20.00 M2 26506.00
cement mortar
4. 1325.29 Finishing the top of roof with one course of machine 1077.86 M2 1428477.00
pressed tiles of size 23x23x2mm of approved quality laid
in cement mortar 1:3, mixed with 2% of water proofing
same oiled mortar including mixing of red oxide etc,
complete. complying with standard specification and as
directed by the departmental officers
5. 381.26 Scrapping the old cement plastering and raking out the 446.00 M2 170042.00
joints 20 mm deep and Replastering with CM 1:5,
20mm thick using river sand including curing, and
finishing neatly , complying with standard specification
and as directed by the departmental officers etc.
6. 1.NO Clearing the debris from site by jcb and lorries 1.NO LUM 200000.00
TOTAL 3100000.00
ESTIMATE
NAME OF WORK : REPAIRS FOR THE LEAKY TERRACE AT OUTER PRAHARAM FOR
Report to accompany along with the estimate for the work of “ Repairs for the leaky Terrace work at
IT has been proposed by the temple authorities to work of“Repairs for the leaky Terrace work at
which an estimate is prepared . the estimate amount is RS – 31.00 Lakhs for the following are the
The necessary lumpsum provisions are made for centage @ 2% and labour welfare fund @ 1%The
current year schedule of rate for the year (2021-22) is adopted in the preparation of estimate.
LEAD STATEMENT
SUB DATA
DATA
DETAILED ESTIMATE
601.80 M2
62.88 M3
62.88 M3
601.80 M2
177.54 M2
ABSTRACT ESTIMATE
1. 601.80 Dismantling of one course of pressed tile roof finish in 20.00 M2 12036.00
cement mortar
4. 601.80 Finishing the top of roof with one course of machine 1077.86 M2 648656.00
pressed tiles of size 23x23x2mm of approved quality laid
in cement mortar 1:3, mixed with 2% of water proofing
same oiled mortar including mixing of red oxide etc,
complete. complying with standard specification and as
directed by the departmental officers
5. 177.54 Scrapping the old cement plastering and raking out the 446.00 M2 79183.00
joints 20 mm deep and Replastering with CM 1:5,
20mm thick using river sand including curing, and
finishing neatly , complying with standard specification
and as directed by the departmental officers etc.
6. 1.NO Clearing the debris from site by jcb and lorries 1.NO LUM 100000.00
TOTAL 1400000.00
ESTIMATE
``
NAME OF WORK : REPAIRS FOR THE LEAKY TERRACE AT INNER PRAHARAM OF AMBAL SANNIDHI FOR
Report to accompany along with the estimate for the work of “ Repairs for the leaky terrace at Inner
IT has been proposed by the temple authorities to work of“Repairs for the leaky terrace at Inner
which an estimate is prepared . the estimate amount is RS – 14.00 Lakhs for the following are the
The necessary lumpsum provisions are made for centage @ 2% and labour welfare fund @ 1%The
current year schedule of rate for the year (2021-22) is adopted in the preparation of estimate.
LEAD STATEMENT
SUB DATA
DATA
10 M2 2750.00
For pointing 1 M2 275.00
DETAILED ESTIMATE
215.16 M2
32.27 M3
32.27 M3
215.16 M2
ABSTRACT ESTIMATE
1. 215.16 Dismantling of one course of pressed tile roof finish in 20.00 M2 4303.00
cement mortar
4. 215.16 Finishing the top of roof with one course of machine 1077.86 M2 242691.00
pressed tiles of size 23x23x2mm of approved quality laid
in cement mortar 1:3, mixed with 2% of water proofing
same oiled mortar including mixing of red oxide etc,
complete. complying with standard specification and as
directed by the departmental officers
5. 1.NO Clearing the debris from site by jcb and lorries 1.NO LUM 20000.00
TOTAL 495000.00
``
ESTIMATE
Report to accompany along with the estimate for the work of “ Repairs for the leaky terrace at
IT has been proposed by the temple authorities to work of“Repairs for the leaky terrace at
which an estimate is prepared . the estimate amount is RS – 4.95 Lakhs for the following are the
The necessary lumpsum provisions are made for centage @ 2% and labour welfare fund @ 1%The
current year schedule of rate for the year (2021-22) is adopted in the preparation of estimate.
LEAD STATEMENT
SUB DATA
DATA
Main Data
1.00 M3 Cut stone dressed to size and shape for all 14631.96 M3 14631.96
faces of 10cm thick
0.37 M3 Cement mortar 1:3 4421.30 M3 1635.88
10.00 M2 Pointing with Combination Mortar 1:1:5 2339.94 10.M2 2339.94
1.10 Nos Mason 1st class 861.00 Each 947.10
nd
1.10 Nos Mason 2 class 804.00 Each 884.40
2.20 Nos Mazdoor 1st class 562.00 Each 1236.40
1.10 Nos Mazdoor 2nd class 461.00 M2 507.10
10.00 M2 Labour charges for 3 live dressing at top 1076.43 M2 10764.30
32947.08
M2 3295.00
DETAILED ESTIMATE
Deduct
Column offsets of North & south side 2x22 0.27 0.80 - (-) 9.50
Column offsets of East & West side 2x18 0.27 0.80 - (-) 7.78
Entrance of North & south side 2x2 2.80 1.40 - (-) 15.68
Entrance of East & West side 2x2 2.40 1.50 - (-) 14.40
1123.00 M2
80.28 M3
48.13 M3
Deduct
Column offsets of North & south 2x22 0.27 0.80 - 9.50 (-)
side
Column offsets of East & West side 2x18 0.27 0.80 - 7.78 (-)
Entrance of North & south side 2x2 2.80 1.40 - 15.68 (-)
Entrance of East & West side 2x2 2.40 1.50 - 14.40 (-)
1444.00 M2
For Rain water Drain from sannadhies 1x20 12.00 - - 240.00 RMT
ABSTRACT ESTIMATE
1. 1123.00 Dismantling and removing of glazed tiles from floors 47.80 M2 53679.00
2. 80.28 Earth work open well excavation complying with relevant 65.00 M3 5218.00
clauses of T.N.D.S.S. Well sinking and with lead up to 10
metre in sand, silt or other loose soil, wet sand or silt not
under water, light black cotton soil, sandy loam and
ordinary soil- First depth up to 2 Meter.
4. 1444.00 Flooring with cut stone slab of size 600mmx600mm and 3295.00 M2 4757980.00
other sizes suitable for site requirement not less than
100mm thick with machine cut edges and top surface
dressed as directed by the departmental officers including
cost and conveyance of materials to site and labour charges
for paving and pointing with cement mortar 1:5 &
combination mortar 1:1:5 etc complete.
5. 240.00 Supplying & fixing of 110 MM Pvc pipes with all 516.70 RMT 124008.00
accessories
6. 20.00 Provision of man hole chamfer with complete package of 10000.00 NOS 200000.00
work with filling of brick jelly, pebble stones& Man hole
cover on Top of chamfer.
TOTAL 6200000.00
ESTIMATE
Report to accompany along with the estimate for the work of “Improvements to the outer
which an estimate is prepared . the estimate amount is RS – 62.00 lakhs for the following are the
The necessary lumpsum provisions are made for centage @ 2% and labour welfare fund @ 1%The
current year schedule of rate for the year (2021-22) is adopted in the preparation of estimate.
LEAD STATEMENT
SUB DATA
DATA
1 M2 214.00
DETAILED ESTIMATE
ABSTRACT ESTIMATE
1. 87.49 Dadooing the walls with glazed tiles of printed design 1285.00 M2 112425.00
size 150x150x6mm of best approved quality and colour
in all shade of the glazed tiles in all floor over a base
layer in cement mortar 1:2, 10 mm thick and laid in situ
true alignment and pointed neatly with colour cement at
the rate of 0.40kg/m2 to suit the colour of the tiles fixed
in position without any airgap in the tiles neatly etc,
complete complying with standard specification and as
directed by the departmental officers . . The colour and
quality of tiles should be approved by the executive
engineer before use of work.
2. 1482.42 Painting two coats of newly plastered wall surface with 214.00 M2 317238.00
water based exterior emulsion paint of first quality and
of approved colour over a priming coat including
thorough scrapping,clean removal of dirt,and including
necessary plaster of parisputty,wherever required etc,
complying with standard specification
TOTAL 497000.00
``
ESTIMATE
NAME OF WORK :IMPROVEMENTS AND PAINTING OF ANNADHAANA KOODAM AND OFFICE BUILDING
Report to accompany along with the estimate for the work of “Improvements and painting work in
IT has been proposed by the temple authorities to workof“Improvements and painting work in
which an estimate is prepared . the estimate amount is RS – 4.97 lakhs for the following are the
1. Dadooing the walls with glazed tiles of printed design size 150x150x6mm
2. Painting two coats of newly plastered wall surface withwater based exterior
emulsion
The necessary lumpsum provisions are made for centage @ 2% and labour welfare fund @ 1%The
current year schedule of rate for the year (2021-22) is adopted in the preparation of estimate.
DATA
M3 117.00
3 Supplying and filling in
foundation , basement,etc
with filling sand in layers of not
more than 15cm thick well
watered , rammed and
consolidated etc.complete
complying with standard
specification and as directed
by the departmental officers.
1.00 M3 Cost of river sand 346.50 M3 346.50
1.00 M3 Refilling charges 19.50 M3 19.50
M3 366.00
4 Plain cement concrete 1:5:10
(one cement,five sand and ten
broken stone jelly) using
40mm gauge hard broken
granite stone jelly for
foundation including
dewatering wherever
necessary and laid in layers of
not more than 15cm thick well
rammed consolidated and
curing etc.complete complying
with standard specification.
9.00 M3 40mm HBG 1249.30 M3 11243.70
4.50 M3 CM 1:5 2005.04 M3 9022.68
1.80 Nos Mason 2nd class 508.00 Each 914.40
17.70 Nos Mazdoor cat-1 355.00 Each 6283.50
14.1 Nos Mazdoor cat-2 320.00 Each 4512.00
Add sundries 0.72
10M3 31977.00
1M3 3197.70
5 Supplying fabricating and
placing in position Mild
steel /Ribbed tor steel grills for
all rcc works as per design
1.00 qtl Plain/ RTS rods 4419.00 qtl 4419.00
1.00 kg GI binding wire(18g) 43.00 kg 43.00
3.50 Nos Fitter 1st class 501.00 Each 1753.50
Add sundries 0.50
1 qtl 6216.00
6 Supplying and erecting
centering for sidesand soffits
including necessary supports
and strutting up to 3.29m
height for plane surfaces as
``
1 M2 312.33
15 Painting new iron works such
as steel
doors,windows,ventilators,win
dow bars,balustrades etc, with
two coats of best approved
first quality and colour of
synthetic enamel paint over
the existing red oxide priming
coat in all floors including cost
of priming coat etc, complete.
Complying with standard
specification .( The
make,quality and colour of
paint should be got approved
by the executive engineer
before use of works.
a) 1.33 Lit Red oxide primer 126.70 Lit 168.51
0.70 Nos Painter/varnisher 1st class 454.00 Each 317.80
sundries 1.69
10 M2 488.00
1 M2 48.80
b) 2.22 Lit Synthetic enamel paint fof iron 211.00 Lit 468.42
1.10 Nos Painter/varnisher 1st class 454.00 Each 499.40
sundries 2.18
10 M2 970.00
1 M2 97.00
a+b =( 48.80+97.00) 1 M2 145.80
16 Painting old iron works such as
steel
doors,windows,ventilators,win
dow bars,balustrades etc, with
two coats of best approved
first quality and colour of
synthetic enamel paint
including ordinary scrapping
using brushes and neat
finishing etc,complete.
Complying with standard
specification .( The
make,quality and colour of
paint should be got approved
by the executive engineer
before use of works.
10.00 M2 Through scrapping 5.30 M2 53.00
1.89 lit Synthetic enamel paint fof iron 211.00 lit 398.79
1.11 Nos Painter/varnisher 1st class 454.00 Each 503.94
``
sundries 2.27
10 M2 958.00
1 M2 95.80
17 Painting old wood works with
two coats of best approved
first quality and colour of
synthetic enamel paint
including ordinary scrapping
using brushes and neat
finishing etc,complete.
Complying with standard
specification .( The
make,quality and colour of
paint should be got approved
by the executive engineer
before use of works.
10.00 M2 Through scrapping 5.70 M2 57.00
2.22 lit Synthetic enamel paint fof iron 221.00 lit 490.62
1.20 Nos Painter/varnisher 1st class 454.00 Each 544.80
sundries 1.58
10 M2 1094.00
1 M2 109.40
18 Painting new wood works with
two coats of best approved
first quality and colour of
synthetic enamel paint over
one coat primer including
ordinary scrapping using
brushes and neat finishing
etc,complete. Complying with
standard specification .( The
make,quality and colour of
paint should be got approved
by the executive engineer
before use of works.
a) 1.44 Lit Ready mixed primer 136.50 Lit 196.56
0.70 Nos Painter/varnisher 1st class 454.00 Each 317.80
Sundries including 1.64
brushes,soap,putty .
10 M2 516.00
1 M2 51.60
Two coats over one coat of
primer
b) 2.55 Lit Synthetic enamel paint fof 221.00 Lit 563.55
wood
10.00 M2 Primer 51.60 M2 516.00
1.20 Nos Painter/varnisher 1st class 454.00 Each 544.80
``
1 M2 795.95
27 Supplying & fixing of M.S Grills
for
windows,gates,ventilators&
steps in position of finishing of
welding buds with filing, and
applying of yellow oxide one
coat neatly.
Area of gate –
0.67mx2.08m=1.39 m2
1x6 nos 12 mm flat rod in vertical 2.08 rmt 12.48
phase
1X8 nos 12 mm flat rod in horizontal 0.67 rmt 5.36
phase
17.84 RMT
1X2 nos 25x7mm flat 2.08 rmt 4.16 RMT
1X1 no Equal angle 40x40x6mm in 2.08 rmt 2.08
vertical
1x2 nos Equal angle 40x40x6mm in 0.67 rmt 1.34
horizontal
3.42 RMT
12 mm flat rod 17.84 20.16 KG
RMTX1.13 Kg/rmt
25x7mm flat 4.16 RMTX1.18 4.90 KG
KG/RMT
L angle 40x40x6mm 11.97 KG
3.42RMTX3.5KG/RM
37.03 Kg
Area of gate=1.39 m2
37.03/1.39 = 26.64 kg/m2
M.S grills calculated as 26.64KG/
M2
Supplying of M.S Grills for
windows,gates,ventilators&
steps with applying of yellow
oxide one coat neatly.
(AS PER SR PAGE 22 , SERIAL 53.60
NO 168)
Fixing of M.S Grills for
windows,gates,ventilators &
steps in position of finishing of
welding buds with filing, and
checking with plumbob
(AS PER SR PAGE 33 , SERIAL 18.20
NO 169)
71.80/kg
``
DATA
10 M2 664.00
1 M2 66.40
b) 2.22 Lit Synthetic enamel paint fof iron 225.40 Lit 500.39
1.10 Nos Painter/varnisher 1st class 688.00 Each 756.80
sundries 2.81
10 M2 1260.00
1 M2 126.00
10 M2 51453.85
1 M2 5154.40
Flooring
Main Data
1.00 M3 Cut stone dressed to size and shape for 14631.96 M3 14631.96
``
DATA
M2 9.00
(B) 1.00 M2 For gopuram/ vimanam above 15’-0’’ up to 25’-0’’ Ht 311.00 M2 311.00
(C) 1.00 M2 For gopuram/ vimanam above 25’-0’’ up to 50’-0’’ Ht 397.00 M2 397.00
1.40 Litre Water based exterior emulsion paint 292.70 Litre 409.78
1 M2 214.00
4.00 Lit R.M Good emulsion paint 1,2 & 3 coats all shading 292.70 Lit 1170.80
1 M2 1022.58
4.00 Lit R.M Good emulsion paint 1,2 & 3 coats all shading 292.70 Lit 1170.80
1 M2 1148.84
5.00 Lit R.M Good emulsion paint 1,2 & 3 coats all shading 292.70 Lit 1463.50
1 M2 1538.18
1.89 lit Synthetic enamel paint fof iron 225.40 lit 426.00
Sundries 11.32
10 M2 1280.00
1 M2 128.00
Sundries 16.53
10 M2 1820.00
1 M2 182.00
DETAILED ESTIMATE
Moolasthaanam praharamandapam
Moolasthaanam upapeetam
Inner praharamandapam
Inner praharamandapam -
Add sides of L Beam over oyyaali mandapam 1x2 321.00 - 1.00 642.00
East Rajagopuram
Deduct for opening both sides 2x1 9.00 14.50 261.00 (-)
Above gopuram
South Rajagopuram
Deduct for opening both sides 2x1 6.00 - 10.00 120.00 (-)
``
Above gopuram
West Rajagopuram
Deduct for opening both sides 2x1 6.00 - 10.25 123.00 (-)
Above gopuram
North Rajagopuram
Deduct for opening both sides 2x1 6.00 - 10.00 120.00 (-)
Above gopuram
Outer praharamandapam
Deductions
Compound wall
127189.39 Sft
11816.18 M2
2821.94 sft
262.16 M2
South Rajagopuram
Rajagopuram Above front & Rear sides 1x2 26.00 - 20.00 1040.00
West Rajagopuram
Rajagopuram Above front & Rear sides 1x2 26.00 - 20.00 1040.00
North Rajagopuram
Rajagopuram Above front & Rear sides 1x2 26.00 - 20.00 1040.00
11035.35 sft
1025.21 M2
Rajagopuram Above front & Rear sides 1x2 27.38 - 33.50 1834.46
17781.71 sft
1651.96 M2
Moolasthaanam praharamandapam
Moolasthaanam upapeetam
Inner praharamandapam
Inner praharamandapam -
Add sides of L Beam over oyyaali mandapam 1x2 321.00 - 1.00 642.00
East Rajagopuram
Deduct for opening both sides 2x1 9.00 14.50 261.00 (-)
South Rajagopuram
Deduct for opening both sides 2x1 6.00 - 10.00 120.00 (-)
West Rajagopuram
Deduct for opening both sides 2x1 6.00 - 10.25 123.00 (-)
North Rajagopuram
Deduct for opening both sides 2x1 6.00 - 10.00 120.00 (-)
Deductions
Compound wall
60342.69 sft
5605.97 M2
``
Sakthi Mandapam
10752.40 sft
998.92 M2
South Rajagopuram
West Rajagopuram
NorthRajagopuram
23548.52 sft
2187.71 M2
3848.50 Sft
357.53 M2
1593.57 sft
148.05 M2
4
10301.63 sft
957.04 M2
1951.88 sft
181.33 M2
``
ABSTRACT ESTIMATE
1. 11816.18 Scrapping the old enamel paint by manual labour and 9.00 M2 106346.00
cleaning the surface including of all charges
(B) 1025.21 For gopuram/ vimanam above 15’-0’’ up to 25’-0’’ Ht 311.00 M2 318840.00
``
(C) 1651.96 For gopuram/ vimanam above 25’-0’’ up to 50’-0’’ Ht 397.00 M2 655828.00
3. 5605.97 Cleaning the wall surface with brush and water and 214.00 M2 1199678.00
Repainting two coats of newly plastered wall surface
with Water based exterior emulsion paint of first
quality and of approved colour over a priming coat
including thorough scrapping,clean removal of
dirt,and including necessary plaster of paris
putty,wherever required etc, complying with
standard specification
(B) 2187.71 For gopuram/ vimanam above 15’-0’’ up to 25’-0’’ Ht 1148.84 M2 2513329.00
(C) 357.53 For gopuram/ vimanam above 25’-0’’ up to 50’-0’’ Ht 1538.18 M2 549945.00
6. 957.04 Cleaning the wall surface with brush and water and 681.72 M2 652433.00
Repainting two coats of newly plastered wall surface
with Multi colour Water based exterior emulsion
paint of first quality and of approved colour, 3 coats
over a priming coat including thorough
scrapping,clean removal of dirt,and including
necessary plaster of paris putty,wherever required
etc, complying with standard specification for
(ceiling)
7. 181.33 Removing the old varnish for doors by manual labour 182.00 M2 33002.00
and revarnishing wood work with best shellac amd
with fine best varnish of approved quality varnish of
``
TOTAL 8500000.00
``