NOTE:-Cofferdam with the Top RL of 579.

25m has been considered for the execution of works

CHAINAGE (m)

DATUM:564m
LEVEL (m)
EXISTING
as shown in the Layout Plan Drawing (Dwg. No.4)

568

572

576

580

584

588

592

596

600

604

608
45.00 584.000
ROAD

Earthen Embankment
40.00 583.725

CROSS-SECTION OF PROPOSED HEADWORKS LOCATION AT BHADRA RIVER


35.00 583.474

45m Length
30.00 583.222
25.00 582.970
20.00 582.718
15.00 582.467

RL 569.60
10.00 582.215
5.00 582.085
00.00 581.963
Jackwell
5.00 581.676
6mØ, RCC

TOP LEVEL RL 591.15


RL 585.50
RL 572.35
10.00 581.308
15.00 581.154
20.00 580.989
25.00 580.455
30.00 580.154
RL 570.525

35.00 579.570
40.00 579.794
45.00 579.338
Inspection Chamber
INTAKE PIPE 400mmØ, RCC, NP-3

RL 579.80

50.00 579.126
1.5m Ø RCC
55.00 579.612
60.00 579.500
85m Length

65.00 579.388
70.00 579.277
BHADRA RIVER

75.00 575.794
HFL 583.937

80.00 574.476
85.00 573.325
INTAKE WELL
RL 575.35
RL 570.65

90.00 574.012
2mØ,RCC
5.00 574.767
10.00 575.088
15.00 575.843
20.00 576.919
25.00 577.674
30.00 578.042
35.00 578.034
40.00 577.996
45.00 577.988
50.00 577.980
55.00 577.968
60.00 578.147
65.00 578.652
70.00 579.178
75.00 579.839
80.00 580.365
85.00 580.501
90.00 580.845
95.00 581.178
100.00 581.479
105.00 582.051
110.00 582.896