Daily HSE Observation Report

Today’s Observation (Joint Visit of IOCL and Hill Representative with SPCPL HSE Coordinators at Site) Date: 07.11 2022
Sr Expected Date of
No. Observations to SPCPL Completion

1 Block E : Materials are on the edge Instruct to Safety to rectify it. 07.11.2022
2 Block E : Wrong cable crossing and DE shutting without Instruct to scaffolding inspector to rectify this. 07.11.2022
barricading, lifeline missing at edge
3 Block B : one worker was riding a bicycle Informed to Security 07.11.2022
4 Block C : Unsafe work conditions, work suspended Work suspended and removed the worker till 07.11.2022
rectification
5 Block C : wrong unsafe access to the slab in practice Instruct to Safety to close the access till rectification 07.11.2022
Previous Observation status

1 Block B: Improper material stacking observed. Info Closed


2 Block D: Loose chilis found at the access area. Rebars protection shall be arranged and informed to Closed
SPCPL
3 Block C: Access preparation in the process from the ground A housekeeping initiative was taken by SPCPL Open
to the first floor
4 Water sprinkling is going on for dust suppression. Inform to Admin team to take action Closed
5 Block E: Worker found working on an unsafe scaffold. Info Closed