Professional Documents
Culture Documents
Density
Density
SAMPLE NUM. 1 2 3 4 5
Weight of wet soil from hole WW Gm
Weight of sand+Jar before pouring W1 Gm
Weight of sand+Jar after pouring W2 Gm
Weight of sand in cone W3 Gm
Weight of sand in hole+in cone W1 - W2
Weight of sand in hole=(W1-W2-W3) Wsh"
Bulk density WWx(lb/cm.ft.)/Wsh"
DEPTH OF HOLE
Moisture content datermination
Container No.
A Wt.of wet soil+container
B Wt.of drysoil+container
C Wt.of container B-E=C
D Wt.of moisture A-B=D
E Wt.of dry soil B-C=E
M Moisture content(m) D/E=M
Dry Density=Bulk Densityx100
100+M
OMC %
Max.Dry Density
%Compaction
Remark _________________________________________________________________
__________________________________________________________________
Contractor________________ Consultant________________
TIBEB CONSTRUCTION PLC
AACRA INDUSTRIAL ZONE AND SETTLMENT AREA GRVEL ROADS PROJECT
CONTRCT (2) AKAKI-LEBU-WELETE SUK & YESHIDEBELE
WORK SHEET
CALIFORNIA BEARING RATIO TEST - AASHTO T 193
SAMPLING STATION: OFFSET FORMCL: SAMPLE TAKEN FROM:
REORESEBTED SECTION DEPTH: DATE SAMPLE:
VISUAL DESCRIPTION DATE AND TIME SOAKED:
PURPOSE: SOURCE STATION DATE AND TIME TESTED:
MDD (g/cc) OMC (%) : REF No.:
DENSITY DETERMINAITON
10 Blows 30 Blows 65 Blows
SOAKING CONDITION BEFORE AFTER BEFORE AFTER BEFORE AFTER
MOLD NUMBER
WEIGHT OF SOIL + MOLD g
WEIGHT OF MOLD g
WEIGHT OF SOIL g
VOLUME OF MOLD cc
WET DENSITY OF SOIL g/cc
DRY DENSITY OF SOIL g/cc
MOISTURE DETERMINATION
10 Blows 30 Blows 65 Blows
SOAKING CONDITION AFTER AFTER AFTER
BEFORE TOP IN. AVG. BEFORE TOP IN. AVG. BEFORE TOP IN. AVG.
CONTAINER NUMBER
WET SOIL + CONTAINER g
DRY SOIL + CONTAINER g
WEIGHT OF WATER g
WEIGHT OF CONTAINER g
WEIGHT OF DRY SOIL g
MOISTURE CONTENT %
AVG. MOISTURE CONTENT %
0
0.64
1.27
1.96
2.54
3.18
3.81
4.45
5.08
7.62
10.16
12.7
SWELL
No. OF BLOWS 10 30 65
RDG (BEFORE SOAKING
PERCENT SWELL
___________________________ _________________________________
Contractor Consultant