UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan

No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

DESIGNING AN ABOVE-GROUND STORAGE SYSTEM FOR CATCHMENT AREA NO.1

Step 1 : Determain Storage Volume Required

1. Select storage type to be used within the site.

An above-ground On-Site Detention (OSD) storage is to be provided in the lawn area


at the front of the site. The storage will be excavated into the lawn and a brick
retaining wall constructed along the front and site boundary of the site to
maximise the storage volume within space available. The primary outlet will be an
orifice housed in a Discharge Control Pit (DCP) which will discharge to the open
drain in the street. The secondary outlet (emergency flow) will be via a broad-
crested weir slot in the retaining wall.

Proposed development in = Kuala Pilah

The area of the site is = 6000 m2 = 1.4826 acres

2. Determine the amount of impervious and pervious areas draining to the OSD storage
system.

Impervious area:

Surface Paving = 1700 m2


Building = 3300 m2
TOTAL = 5000 m2

Pervious area:

Lawns and Gardens = 1000 m2


TOTAL = 1000 m2

The site befor development was a rubber estate

3. Determine times of concentration, tc and tcs

Assumed: tc = 30 minutes Minor Drainage System has been

tcs = 20 minutes designed for 5 year ARI capacity

4. Calculate the pre and post-development flows for the area draining to the OSD
storage

For ARI of 5 years, From Table 13.A1, for t = 30 minutes;

a = 3.7967 c = -0.4012
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

b = 1.2904 d = 0.0247

In(RIt) = a + b In(t) + c [In(t)]2 + d [In(t)]3 In(t) = 3.4012


[In(t)]2 = 11.5681
In(RIt) = 4.5163 [In(t)]3 = 39.3455

5 I ### = 91 mm/hr

Using Rational Method, the pre and post development flows are calculated as
follows:

Development I Impervious Area Pervious Area


ΣCA Q (l/s)
Status (mm/hr) C A (m ) 2
C A (m2)
Pre-development 91 - - 0.4 6000.00 2400.00 60.97 (Qp)
Post-development 91 0.77 5000.00 0.4 1000.00 4250.00 107.97 (Qa)

Note :
C = 0.77 - refer to Design Chart 14.3 for category 3

C = 0.40 - refer to Design Chart 14.3 for category 7

5. Determine the required PSD

From Equation 19.1, Permissible Site Discharge (PSD) for above-ground storage:

Qa Qp 567
a = [ 4
tc ] [ 0.333 tc
Qa
+ 0.75 tc + 0.25 tcs ] 5.6

a = 477.09 5

b = 4 Qp Qa

= 26330

a - ( a 2 - 4 b ) 1
PSD =
2

477.09 - ( 477.09 2 - 4 x 26330 ) 1


=
2

127.3866
=
2

= 63.6933 l/s
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

6. Determine the required Site Storage Requirement (SSR) (10 year ARI)

Using Equation 19.2 with Equation 19.2a and 19.2b for above-ground storage, the
site discharge for the storage design storm (10 year ARI) and the corresponding
SSR is calculated for the range of storm durations to determine the maximum SSR.
These calculations are summarised in the following two tables.

Storm Duration I Impervious Area Pervious Area


ΣCA Qd (l/s)
td (mins) (mm/hr) C A (m2) C A (m2)
5 178 0.77 5000.00 0.6 1000.00 4450.0 219.8
10 161 0.77 5000.00 0.56 1000.00 4410.0 197.7
15 140 0.77 5000.00 0.52 1000.00 4370.0 169.8
20 122 0.77 5000.00 0.48 1000.00 4330.0 147.0
25 108 0.77 5000.00 0.45 1000.00 4300.0 129.1
30 97 0.77 5000.00 0.42 1000.00 4270.0 114.7
35 87 0.77 5000.00 0.39 1000.00 4240.0 103.0
40 80 0.77 5000.00 0.37 1000.00 4220.0 93.5
45 73 0.77 5000.00 0.34 1000.00 4190.0 85.3

td (mins) Qd (l/s) PSD (l/s) c d SSR (m3)


5 219.8 63.7 48.32 3.95 50.26
10 197.7 63.7 47.49 4.39 87.46
15 169.8 63.7 46.14 5.11 106.69
20 147.0 63.7 44.64 5.91 115.69
25 129.1 63.7 43.11 6.72 118.89
30 114.7 63.7 41.53 7.57 118.16
35 103.0 63.7 39.92 8.43 114.83
40 93.5 63.7 38.31 9.28 110.21
45 85.3 63.7 36.63 10.18 103.92

From the previous table, a maximum SSR of 118.89 m3

occurs at a duration of 25 minutes.

However, for a landscape storage, an additional 20% is added to the volume to


account for inaccuracies in construction and future loss of storage due to the
build-up of the lawn surface. Therefore:
SSR = 1.2 x 118.89

= 142.67 m3
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

Step 2 : Size Primary Outlet

The primary outlet orifice is sized to discharge the PSD assuming free outlet
conditions when the storage is full. Using a 600mm deep DCP and a maximum storage
depth of 1000mm, adopt a maximum head to the centreline of orifice of 0.8m. The
required orifice size under freeoutlet conditions is calculated by rearranging
Equation 19.3:

Cd = 0.6 if orifice < 50mm Cd = 0.62 if orifice > 50mm

PSD 63.6933 x 10 -3
PSD = =
Cd [ 2gHo ] 1 0.62 ( 2 x 9.81 x 0.8 ) 1

= 0.0259 m2

4 Ao 0.5 4 x 0.0259 1
D = [ π ] = [ 3.1416 ]
= 0.1817 m = 181.7 mm ----> say 200 mm

Step 4 : Determine Storage Dimensions

Maximum allowable depth for landscaped storage area is 1000mm. However, to reduce
the height of the brick retaining wall, a maximum storage depth of 1000mm has been
adopted.
Maximum storage depth = 1000 mm

The minimum recommended floor slope is 2% graded toward the DCP. Assuming the
average depth in the storage is 918mm, the adopted dimensions of the revised
storage volume are:
Try 17 m x 10.2 m x 0.918 m

= 159.2506 m3 > 142.67 m3 ----> O.K

Therefore, provide 1 nos of On Site Detention Pond

17 m (Length) x 10.2 m (Width) x 0.918 m average depth


UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

Step 5 : Size Secondary Outlet

The secondary outlet is broad-crested weir slotted into the retaining wall along
the front boundary. The weir should be sized for the estimated major system ARI
flow from the site for time tcs. The major drainage system in the catchment has
been designed for 50 year ARI.

The 20 minute, 50 year ARI reinfall intensity for Kuala Pilah


is estimated using Equation 13.3:

For ARI of 50 years, From Table 13.A1, for t = 30 minutes;

a = 4.7768 c = -0.3158

b = 0.8716 d = 0.0191

In(RIt) = a + b In(t) + c [In(t)]2 + d [In(t)]3 In(t) = 3.4012


[In(t)] 2
= 11.5681
In( It)
R
= 4.8396 [In(t)]3 = 39.3455

### I ### = 126 mm/hr

For ARI of 50 years, From Table 13.A1, for t = 60 minutes;

a = 4.7768 c = -0.3158

b = 0.8716 d = 0.0191

In(RIt) = a + b In(t) + c [In(t)]2 + d [In(t)]3 In(t) = 4.0943


[In(t)]2 = 16.7637
In(RIt) = 4.3624 [In(t)]3 = 68.6362

### I ### = 78 mm/hr

Convert to reinfall depth

50 P ### = 50
I30 x duration or t in hour

50 P ### = 63 mm

50 P ### = 78 mm
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

From Figure 13.3, 2 P 24h ≤ 100 mm for Kuala Pilah

From Table 13.3, FD = Interpolation, t From Table 13.3

t = 20 2
P24h = 0.47
t = 20 2
P24h = x
t = 30 2
P24h = 0

FD = 0.470

Pd = P30 - FD (P60 - P30) Equation 13.3

50
Pd = 56.0 mm

Therefore, Id = Pd / duration ; duration = d = 20 minutes

= 0.3333 hours

Id Pd
=
d

56.0
=
0.3333
50
Id = 168 mm/hr

Using the Rational Method, the major system flow is calculated as follows:

I Impervious Area Pervious Area On site


ΣCA Qd (l/s)
### (mm/hr) C A (m2) C A (m2) Detention
168 0.77 5000 0.49 1000 4340.0 202.6 OSD - 1
5000 1000

From Equation 20.6,

Q = CBcw B H ###

Assuming the head over the weir is limited to 100 mm and Cscw = 1.7

Therefore,
Q 202.6 x 10 -3
B = =
CBcw H ### 1.7 x 0.1 ###

= 3.768 m

Allowing 50 mm freeboard, the dimensions of the secondary outlet weir are:


UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

3768.43 mm (wide) x 150 mm (high)

Note:-
All drain from the housing scheme house to be discharged into above-ground storage
before released to main drain.

Determination of drain size

From Schedule A : Discharge capacity of Drain

Size of drain,

12 in Wide PC Drain with 18 in Wide Vertical Walls (W = 18 in)

Depth of water (ft) = 4.0 ft

Channel slope = 1/200

Discharge capacity,Q = 21.0 cfs

Velocity, V = 4.0 fps

From calculation,

Qd = 202.59 l/s

= 7.1553 cfs

So,

Q ( 21 ) > Qd ( 7.16 ) -----> O.K


UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

A 17000 mm

10200 mm
OSD Storage
Maximum depth = 1000 mm

DCP Secondary outlet

A 3768 mm Brick Retaining Wall

Brick Retaining Wall


OSD Storage (Secondary Outlet)
1000 m

DCP
(Primary Outlet) Open Drain
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

SECTION A-A
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

DESIGNING A COMPOSITE ABOVE AND BELOW-GROUND STORAGE SYSTEM FOR CATCHMENT AREA
NO.2A

Step 1 : Determain Storage Volume Required

1. Select storage type to be used within the site.

A composite above and below-ground storage is to be provided in the parking area


at the rear of the site. Above-ground storage will be provided on the car park
surface and below-ground storage in a pipe pacakge underneath. The primary outlet
will be a UPVC flow restricting pipe from the pipe package outlet chamber which
will discharge to the municiple pipe system. Overflows will pass over the car park
kerbing along the rear boundary of the site (secondary outlet) and flow through
the adjoining lot to future development area. Care must be taken to ensure that
overflows will not cause any damage to the adjacent property or inconvenience to
the owners.

Proposed development in = Kuala Pilah

The area of the site is = 4110 m2 = 1.0156 acres

2.
Determine the areas of the site that will be directed to the OSD storage system.

The whole area of the site will drain to the OSD storage.

3. Determine the amount of impervious and pervious areas draining to the OSD storage
system.

Impervious area:

Surface Paving = 1800 m2


Building = 850 m2
TOTAL = 2650 m2

Pervious area:

Lawns and Gardens = 1460 m2


TOTAL = 1460 m2

The site befor development was a rubber estate


UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

4. Determine times of concentration, tc and tcs

Assumed: tc = 30 minutes Minor Drainage System has been

tcs = 20 minutes designed for 5 year ARI capacity

5. Calculate the pre and post-development flows for the area draining to the OSD
storage

For ARI of 5 years, From Table 13.A1, for t = 30 minutes;

a = 3.7967 c = -0.4012

b = 1.2904 d = 0.0247

In(RIt) = a + b In(t) + c [In(t)]2 + d [In(t)]3 In(t) = 3.4012


[In(t)]2 = 11.5681
In(RIt) = 4.5163 [In(t)]3 = 39.3455

5 I ### = 91 mm/hr

Using Rational Method, the pre and post development flows are calculated as
follows:

Development I Impervious Area Pervious Area


ΣCA Q (l/s)
Status (mm/hr) C A (m ) 2
C A (m2)
Pre-development 91 - - 0.4 4110.00 1644.00 41.76 (Qp)
Post-development 91 0.77 2650.00 0.4 1460.00 2624.50 66.67 (Qa)

Note :
C = 0.77 - refer to Design Chart 14.3 for category 3

C = 0.4 - refer to Design Chart 14.3 for category 7

6. Determine the required PSD

From Equation 19.1, Permissible Site Discharge (PSD) for above-ground storage:

Qa Qp 350
a = [ 4
tc ] [ 0.333 tc
Qa
+ 0.75 tc + 0.25 tcs ] 6.3

a = 300.09 5
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

b = 4 Qp Qa

= 11138

a - ( a 2 - 4 b ) 1
PSD =
2

300.09 - ( 300.09 2 - 4 x 11138 ) 1


=
2

86.7758
=
2

= 43.4 l/s

7. Determine the required Site Storage Requirement (SSR) (10 year ARI)

Using Equation 19.2 with Equation 19.2a and 19.2b for above-ground storage, the
site discharge for the storage design storm (10 year ARI) and the corresponding
SSR is calculated for the range of storm durations to determine the maximum SSR.
These calculations are summarised in the following two tables.

Storm Duration I Impervious Area Pervious Area


ΣCA Qd (l/s)
td (mins) (mm/hr) C A (m2) C A (m2)
5 178 0.77 2650.00 0.6 1460.00 2916.5 144.1
10 161 0.77 2650.00 0.56 1460.00 2858.1 128.1
15 140 0.77 2650.00 0.52 1460.00 2799.7 108.8
20 122 0.77 2650.00 0.48 1460.00 2741.3 93.0
25 108 0.77 2650.00 0.45 1460.00 2697.5 81.0
30 97 0.77 2650.00 0.42 1460.00 2653.7 71.3
35 87 0.77 2650.00 0.39 1460.00 2609.9 63.4
40 80 0.77 2650.00 0.37 1460.00 2580.7 57.2
45 73 0.77 2650.00 0.34 1460.00 2536.9 51.6

td (mins) Qd (l/s) PSD (l/s) c d SSR (m3)


5 144.1 43.4 32.72 2.80 32.56
10 128.1 43.4 32.06 3.14 55.73
15 108.8 43.4 31.01 3.70 66.66
20 93.0 43.4 29.84 4.33 70.64
25 81.0 43.4 28.63 4.97 71.07
30 71.3 43.4 27.36 5.65 68.94
35 63.4 43.4 26.04 6.35 65.14
40 57.2 43.4 24.74 7.04 60.96
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

45 51.6 43.4 23.32 7.80 55.40

From the previous table, a maximum SSR of 71.07 m3 occurs at a duration of


25 minutes and the required composite storege volume are:

Pipe package = 30.48 m3


Car park surface = 30.48 m3

Step 2 : Size Primary Outlet

The primary outlet flow restricting pipe is to be sized to discharge 83.6 l/s
when the car park storage is full. The required pipe diameter is found by
rearranging Equation 19.6 and using trial and error:

PSD and 4 Ap 1
Ap =
ys + S L - ye 1
Dp = [ π ]
[ 2g x
KL ]
where KL = Kt + Ke + Kf + Ko

Using the downstream end of the outlet pipe as the hight datum,

ys = 2.4 m

ye = 0.6 m

The outlet pipe slope S = 0.2857 %

Length L = 20.0 m

For the trash rack, An


= 0.75
Ag

From equation 19.8, trash loss factor,

Kt = 1.45 - 0.45 ( 0.75 ) - ( 0.75 ) ###

= 0.55

From equation 19.9, entrance loss factor,

Ke = 1
- 1
0.6 2

= 1.7778

From equation 19.10 and 19.11, friction loss factor,

0.009 2 x 20.0
Ke = 125 x
D 1/3
D
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

= 0.2025 D -4/3

Adopt outlet loss factor, Ko = 0.5

KL = 0.55 + 1.78 + 0.2025 D -4/3


+ 0.5

= 2.83 + 0.203 D ###

(Kt + Ke + Kf + Ko)V2/2g
Pipe Package Hydraulic Grade Line Pipe HGL

Ye
Ys S.L
Municipal pipe

L = 20.0 m

Adopting an initial trial diameter of 150mm, the trial and error calculations are
summarised in the following table.

Tiala D Area Ap Estimated D


KL
(m) (m ) 2
(mm)
150 5.369 0.0167 145.6
145 5.486 0.0168 146.4
146 5.462 0.0168 146.2
146.2 5.457 0.0168 146.2

Use pipe diameter,


Dp = 150 mm A = 0.018

ys + S L - ye 1
Q = A [ 2g x KL ]
= 46.0

A pipe diameter of 150mm is adopted. This will give an outflow of 46.0 l/s which
is acceptable (less than 5% greater then the PSD)

Step 3 : Determine Storage Dimensions

a) Pipe package

Adopting 2 x 900 mm diameter pipes, the volume of the inlet and outlet
chambers is:
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

2 x 1.2 (height) x 2.7 (width) x 1.0 (breadth)

= 6.48 m3

The total length of pipe required is found by dividing the residual volume by
the pipe cross-sectional area:

30.48 - 6.48
Length =
π x 0.9 2
2 x [ 4 ]
= 18.9 m

b) Car Park

Using a maximum allowable ponding depth in a car park area is 150mm (Table
19.2) and a minimum surface slope of 0.7%, the storage volume is calculated
to cover the area shown in Figure below.

Secondary outlet A

Pipe package (2 x 900mm pipes)

Car park storage Primary outlet (flow restricting pipe)


Lot pipe drainage system

A
Car park and access

Office Building
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

Office Building
Secondary outlet
Car park storage (overflow over kerb)

Pipe package
(2 x 900 mm pipes)

SECTION A - A Primary outlet

Step 4 : Size Secondary Outlet

The kerbing at the parking area is designed to act as a broad-crested weir to


discharge . The weir should be sized for the estimated major system ARI flow from
the site for time tcs. The major drainage system in the catchment has been designed
for 50 year ARI.

The 20 minute, 50 year ARI reinfall intensity for Kuala Pilah


is estimated using Equation 13.3:

For ARI of 50 years, From Table 13.A1, for t = 30 minutes;

a = 4.7768 c = -0.3158

b = 0.8716 d = 0.0191

In(RIt) = a + b In(t) + c [In(t)]2 + d [In(t)]3 In(t) = 3.4012


[In(t)]2 = 11.5681
In(RIt) = 4.8396 [In(t)]3 = 39.3455

### I ### = 126 mm/hr

For ARI of 50 years, From Table 13.A1, for t = 60 minutes;

a = 4.7768 c = -0.3158

b = 0.8716 d = 0.0191

In(RIt) = a + b In(t) + c [In(t)]2 + d [In(t)]3 In(t) = 4.0943


[In(t)]2 = 16.7637
In(RIt) = 4.3624 [In(t)]3 = 68.6362

### I ### = 78 mm/hr


UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

Convert to reinfall depth

50 P ### = 50
I30 x duration or t in hour

50 P ### = 63 mm

50 P ### = 78 mm

From Figure 13.3, 2 P 24h = 100 mm for Kuala Pilah

From Table 13.3, FD = Interpolation, t From Table 13.3

t = 20 2
P24h = 0.47
t = 20 2
P24h = x
t = 30 2
P24h = 0

FD = 0.470

Pd = P30 - FD (P60 - P30) Equation 13.3

50
Pd = 56.0 mm

Therefore, Id = Pd / duration ; duration = d = 20 minutes

= 0.3333 hours

Id Pd
=
d

56.0
=
0.3333
50
Id = 168 mm/hr

Using the Rational Method, the major system flow is calculated as follows:

I Impervious Area Pervious Area On site


ΣCA Qd (l/s)
### (mm/hr) C A (m2) C A (m2) Detention
168 0.77 2650 0.4 1460 2624.5 122.5 OSD - 1
2650 1460

From Equation 20.6,

Q = CBcw B H ###

Assuming the head over the weir is limited to 50 mm and Cscw = 1.7

Therefore,
Q 122.5 x 10 -3
B = =
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05
B = =
CBcw H ### 1.7 x 0.05 ###

= 6.446 m

Allowing 50 mm freeboard, the dimensions of the secondary outlet weir are:

6445.58 mm (wide) x 50 mm (high)

Note:-
All drain from the development scheme to be discharged into Composite Above and
Below-Ground Storage System before released to main drain.

Determination of drain size

From Schedule A : Discharge capacity of Drain

Size of drain,

12 in Wide PC Drain with 18 in Wide Vertical Walls (W = 18 in)

Depth of water (ft) = 4.0 ft

Channel slope = 1/200

Discharge capacity,Q = 21.0 cfs

Velocity, V = 4.0 fps

From calculation,

Qd = 122.51 l/s

= 4.3270 cfs

So,

Q ( 21 ) > Qd ( 4.33 ) -----> O.K


UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

DESIGNING AN ABOVE-GROUND STORAGE SYSTEM FOR CATCHMENT AREA NO.2B

Step 1 : Determain Storage Volume Required

1. Select storage type to be used within the site.

An above-ground On-Site Detention (OSD) storage is to be provided in the lawn area


at the front of the site. The storage will be excavated into the lawn and a brick
retaining wall constructed along the front and site boundary of the site to
maximise the storage volume within space available. The primary outlet will be an
orifice housed in a Discharge Control Pit (DCP) which will discharge to the open
drain in the street. The secondary outlet (emergency flow) will be via a broad-
crested weir slot in the retaining wall.

Proposed development in = Kuala Pilah

The area of the site is = 4000 m2 = 0.9884 acres

2. Determine the amount of impervious and pervious areas draining to the OSD storage
system.

Impervious area:

Surface Paving = 1400 m2


Building = 875 m2
TOTAL = 2275 m2

Pervious area:

Lawns and Gardens = 1725 m2


TOTAL = 1725 m2

The site befor development was a rubber estate

3. Determine times of concentration, tc and tcs

Assumed: tc = 30 minutes Minor Drainage System has been

tcs = 20 minutes designed for 5 year ARI capacity

4. Calculate the pre and post-development flows for the area draining to the OSD
storage

For ARI of 5 years, From Table 13.A1, for t = 30 minutes;

a = 3.7967 c = -0.4012
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

b = 1.2904 d = 0.0247

In(RIt) = a + b In(t) + c [In(t)]2 + d [In(t)]3 In(t) = 3.4012


[In(t)]2 = 11.5681
In(RIt) = 4.5163 [In(t)]3 = 39.3455

5 I ### = 91 mm/hr

Using Rational Method, the pre and post development flows are calculated as
follows:

Development I Impervious Area Pervious Area


ΣCA Q (l/s)
Status (mm/hr) C A (m ) 2
C A (m2)
Pre-development 91 - - 0.4 4000.00 1600.00 40.65 (Qp)
Post-development 91 0.77 2275.00 0.4 1725.00 2441.75 62.03 (Qa)

Note :
C = 0.77 - refer to Design Chart 14.3 for category 3

C = 0.40 - refer to Design Chart 14.3 for category 7

5. Determine the required PSD

From Equation 19.1, Permissible Site Discharge (PSD) for above-ground storage:

Qa Qp 326
a = [ 4
tc ] [ 0.333 tc
Qa
+ 0.75 tc + 0.25 tcs ] 6.5

a = 281.58 5

b = 4 Qp Qa

= 10085

a - ( a 2 - 4 b ) 1
PSD =
2

281.58 - ( 281.58 2 - 4 x 10085 ) 1


=
2

84.2287
=
2

= 42.1143 l/s
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

6. Determine the required Site Storage Requirement (SSR) (10 year ARI)

Using Equation 19.2 with Equation 19.2a and 19.2b for above-ground storage, the
site discharge for the storage design storm (10 year ARI) and the corresponding
SSR is calculated for the range of storm durations to determine the maximum SSR.
These calculations are summarised in the following two tables.

Storm Duration I Impervious Area Pervious Area


ΣCA Qd (l/s)
td (mins) (mm/hr) C A (m2) C A (m2)
5 178 0.77 2275.00 0.6 1725.00 2786.8 137.7
10 161 0.77 2275.00 0.56 1725.00 2717.8 121.8
15 140 0.77 2275.00 0.52 1725.00 2648.8 102.9
20 122 0.77 2275.00 0.48 1725.00 2579.8 87.6
25 108 0.77 2275.00 0.45 1725.00 2528.0 75.9
30 97 0.77 2275.00 0.42 1725.00 2476.3 66.5
35 87 0.77 2275.00 0.39 1725.00 2424.5 58.9
40 80 0.77 2275.00 0.37 1725.00 2390.0 53.0
45 73 0.77 2275.00 0.34 1725.00 2338.3 47.6

td (mins) Qd (l/s) PSD (l/s) c d SSR (m3)


5 137.7 42.1 31.68 2.76 30.97
10 121.8 42.1 31.00 3.12 52.61
15 102.9 42.1 29.93 3.69 62.37
20 87.6 42.1 28.71 4.34 65.41
25 75.9 42.1 27.46 5.00 65.15
30 66.5 42.1 26.15 5.70 62.45
35 58.9 42.1 24.76 6.44 58.19
40 53.0 42.1 23.40 7.17 53.75
45 47.6 42.1 21.88 7.97 47.90

From the previous table, a maximum SSR of 65.41 m3

occurs at a duration of 20 minutes.

However, for a landscape storage, an additional 20% is added to the volume to


account for inaccuracies in construction and future loss of storage due to the
build-up of the lawn surface. Therefore:
SSR = 1.2 x 65.41

= 78.49 m3
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

Step 2 : Size Primary Outlet

The primary outlet orifice is sized to discharge the PSD assuming free outlet
conditions when the storage is full. Using a 600mm deep DCP and a maximum storage
depth of 1200mm, adopt a maximum head to the centreline of orifice of 0.8m. The
required orifice size under freeoutlet conditions is calculated by rearranging
Equation 19.3:

Cd = 0.6 if orifice < 50mm Cd = 0.62 if orifice > 50mm

PSD 42.1143 x 10 -3
PSD = =
Cd [ 2gHo ] 1 0.62 ( 2 x 9.81 x 0.8 ) 1

= 0.0171 m2

4 Ao 0.5 4 x 0.0171 1
D = [ π ] = [ 3.1416 ]
= 0.1477 m = 147.75 mm ----> say 150 mm

Step 4 : Determine Storage Dimensions

Maximum allowable depth for landscaped storage area is 1200mm. However, to reduce
the height of the brick retaining wall, a maximum storage depth of 1200mm has been
adopted.
Maximum storage depth = 1200 mm

The minimum recommended floor slope is 2% graded toward the DCP. Assuming the
average depth in the storage is 1200mm, the adopted dimensions of the revised
storage volume are:
Try 28 m x 2.4 m x 1.2 m

= 80.64 m3 > 78.49 m3 ----> O.K

Therefore, provide 1 nos of On Site Detention Pond

28 m (Length) x 2.4 m (Width) x 1.2 m average depth


UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

Step 5 : Size Secondary Outlet

The secondary outlet is broad-crested weir slotted into the retaining wall along
the front boundary. The weir should be sized for the estimated major system ARI
flow from the site for time tcs. The major drainage system in the catchment has
been designed for 50 year ARI.

The 20 minute, 50 year ARI reinfall intensity for Kuala Pilah


is estimated using Equation 13.3:

For ARI of 50 years, From Table 13.A1, for t = 30 minutes;

a = 4.7768 c = -0.3158

b = 0.8716 d = 0.0191

In(RIt) = a + b In(t) + c [In(t)]2 + d [In(t)]3 In(t) = 3.4012


[In(t)] 2
= 11.5681
In( It)
R
= 4.8396 [In(t)]3 = 39.3455

### I ### = 126 mm/hr

For ARI of 50 years, From Table 13.A1, for t = 60 minutes;

a = 4.7768 c = -0.3158

b = 0.8716 d = 0.0191

In(RIt) = a + b In(t) + c [In(t)]2 + d [In(t)]3 In(t) = 4.0943


[In(t)]2 = 16.7637
In(RIt) = 4.3624 [In(t)]3 = 68.6362

### I ### = 78 mm/hr

Convert to reinfall depth

50 P ### = 50
I30 x duration or t in hour

50 P ### = 63 mm

50 P ### = 78 mm
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

From Figure 13.3, 2 P 24h ≤ 100 mm for Kuala Pilah

From Table 13.3, FD = Interpolation, t From Table 13.3

t = 20 2
P24h = 0.47
t = 20 2
P24h = x
t = 30 2
P24h = 0

FD = 0.470

Pd = P30 - FD (P60 - P30) Equation 13.3

50
Pd = 56.0 mm

Therefore, Id = Pd / duration ; duration = d = 20 minutes

= 0.3333 hours

Id Pd
=
d

56.0
=
0.3333
50
Id = 168 mm/hr

Using the Rational Method, the major system flow is calculated as follows:

I Impervious Area Pervious Area On site


ΣCA Qd (l/s)
### (mm/hr) C A (m2) C A (m2) Detention
168 0.77 2275 0.40 1725 2441.8 114.0 OSD - 1
2275 1725

From Equation 20.6,

Q = CBcw B H ###

Assuming the head over the weir is limited to 100 mm and Cscw = 1.7

Therefore,
Q 114.0 x 10 -3
B = =
CBcw H ### 1.7 x 0.1 ###

= 2.120 m

Allowing 50 mm freeboard, the dimensions of the secondary outlet weir are:


UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

2120.18 mm (wide) x 150 mm (high)

Note:-
All drain from the housing scheme house to be discharged into above-ground storage
before released to main drain.

7. Determination of drain size

From Schedule A : Discharge capacity of Drain

Size of drain,

12 in Wide PC Drain with 18 in Wide Vertical Walls (W = 18 in)

Depth of water (ft) = 4.0 ft

Channel slope = 1/200

Discharge capacity,Q = 21.0 cfs

Velocity, V = 4.0 fps

From calculation,

Qd = 113.98 l/s

= 4.0257 cfs

So,

Q ( 21 ) > Qd ( 4.03 ) -----> O.K


UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

A 28000 mm

2400
OSD Storage
Maximum depth = 1200 mm
mm

DCP Secondary outlet

A 2120 mm Brick Retaining Wall

Brick Retaining Wall


OSD Storage (Secondary Outlet)
1200 m

DCP
(Primary Outlet) Open Drain
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

SECTION A-A
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

DESIGNING AN ABOVE-GROUND STORAGE SYSTEM FOR CATCHMENT AREA NO.2

Step 1 : Determain Storage Volume Required

1. Select storage type to be used within the site.

An above-ground On-Site Detention (OSD) storage is to be provided in the lawn area


at the front of the site. The storage will be excavated into the lawn and a brick
retaining wall constructed along the front and site boundary of the site to
maximise the storage volume within space available. The primary outlet will be an
orifice housed in a Discharge Control Pit (DCP) which will discharge to the open
drain in the street. The secondary outlet (emergency flow) will be via a broad-
crested weir slot in the retaining wall.

Proposed development in = Kuala Pilah

The area of the site is = 8110 m2 = 2.004 acres

2. Determine the amount of impervious and pervious areas draining to the OSD storage
system.

Impervious area:

Surface Paving = 3200 m2


Building = 1725 m2
TOTAL = 4925 m2

Pervious area:

Lawns and Gardens = 3185 m2


TOTAL = 3185 m2

The site befor development was a rubber estate

3. Determine times of concentration, tc and tcs

Assumed: tc = 30 minutes Minor Drainage System has been

tcs = 20 minutes designed for 5 year ARI capacity

4. Calculate the pre and post-development flows for the area draining to the OSD
storage

For ARI of 5 years, From Table 13.A1, for t = 30 minutes;

a = 3.7967 c = -0.4012
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

b = 1.2904 d = 0.0247

In(RIt) = a + b In(t) + c [In(t)]2 + d [In(t)]3 In(t) = 3.4012


[In(t)]2 = 11.5681
In(RIt) = 4.5163 [In(t)]3 = 39.3455

5 I ### = 91 mm/hr

Using Rational Method, the pre and post development flows are calculated as
follows:

Development I Impervious Area Pervious Area


ΣCA Q (l/s)
Status (mm/hr) C A (m ) 2
C A (m2)
Pre-development 91 - - 0.4 8110.00 3244.00 82.41 (Qp)
Post-development 91 0.77 4925.00 0.4 3185.00 5066.25 128.70 (Qa)

Note :
C = 0.77 - refer to Design Chart 14.3 for category 3

C = 0.40 - refer to Design Chart 14.3 for category 7

5. Determine the required PSD

From Equation 19.1, Permissible Site Discharge (PSD) for above-ground storage:

Qa Qp 676
a = [ 4
tc ] [ 0.333 tc
Qa
+ 0.75 tc + 0.25 tcs ] 6.4

a = 581.68 5

b = 4 Qp Qa

= 42425

a - ( a 2 - 4 b ) 1
PSD =
2

581.68 - ( 581.68 2 - 4 x 42425 ) 1


=
2

171.0103
=
2

= 85.5052 l/s
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

6. Determine the required Site Storage Requirement (SSR) (10 year ARI)

Using Equation 19.2 with Equation 19.2a and 19.2b for above-ground storage, the
site discharge for the storage design storm (10 year ARI) and the corresponding
SSR is calculated for the range of storm durations to determine the maximum SSR.
These calculations are summarised in the following two tables.

Storm Duration I Impervious Area Pervious Area


ΣCA Qd (l/s)
td (mins) (mm/hr) C A (m2) C A (m2)
5 178 0.77 4925.00 0.6 3185.00 5703.3 281.7
10 161 0.77 4925.00 0.56 3185.00 5575.9 249.9
15 140 0.77 4925.00 0.52 3185.00 5448.5 211.7
20 122 0.77 4925.00 0.48 3185.00 5321.1 180.6
25 108 0.77 4925.00 0.45 3185.00 5225.5 156.9
30 97 0.77 4925.00 0.42 3185.00 5130.0 137.9
35 87 0.77 4925.00 0.39 3185.00 5034.4 122.3
40 80 0.77 4925.00 0.37 3185.00 4970.7 110.1
45 73 0.77 4925.00 0.34 3185.00 4875.2 99.2

td (mins) Qd (l/s) PSD (l/s) c d SSR (m3)


5 281.7 85.5 64.39 5.55 63.53
10 249.9 85.5 63.07 6.26 108.35
15 211.7 85.5 60.95 7.39 129.03
20 180.6 85.5 58.56 8.66 136.05
25 156.9 85.5 56.10 9.97 136.21
30 137.9 85.5 53.52 11.35 131.38
35 122.3 85.5 50.81 12.79 123.32
40 110.1 85.5 48.16 14.20 114.68
45 99.2 85.5 45.23 15.77 103.27

From the previous table, a maximum SSR of 136.21 m3

occurs at a duration of 25 minutes.

However, for a landscape storage, an additional 20% is added to the volume to


account for inaccuracies in construction and future loss of storage due to the
build-up of the lawn surface. Therefore:
SSR = 1.2 x 136.21

= 163.46 m3
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

Step 2 : Size Primary Outlet

The primary outlet orifice is sized to discharge the PSD assuming free outlet
conditions when the storage is full. Using a 600mm deep DCP and a maximum storage
depth of 1000mm, adopt a maximum head to the centreline of orifice of 0.8m. The
required orifice size under freeoutlet conditions is calculated by rearranging
Equation 19.3:

Cd = 0.6 if orifice < 50mm Cd = 0.62 if orifice > 50mm

PSD 85.5052 x 10 -3
PSD = =
Cd [ 2gHo ] 1 0.62 ( 2 x 9.81 x 0.8 ) 1

= 0.0348 m2

4 Ao 0.5 4 x 0.0348 1
D = [ π ] = [ 3.1416 ]
= 0.2105 m = 210.53 mm ----> say 250 mm

Step 4 : Determine Storage Dimensions

Maximum allowable depth for landscaped storage area is 1000mm. However, to reduce
the height of the brick retaining wall, a maximum storage depth of 1000mm has been
adopted.
Maximum storage depth = 1000 mm

The minimum recommended floor slope is 2% graded toward the DCP. Assuming the
average depth in the storage is 968mm, the adopted dimensions of the revised
storage volume are:
Try 44 m x 4 m x 0.968 m

= 170.368 m3 > 163.46 m3 ----> O.K

Therefore, provide 1 nos of On Site Detention Pond

44 m (Length) x 4 m (Width) x 0.968 m average depth


UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

Step 5 : Size Secondary Outlet

The secondary outlet is broad-crested weir slotted into the retaining wall along
the front boundary. The weir should be sized for the estimated major system ARI
flow from the site for time tcs. The major drainage system in the catchment has
been designed for 50 year ARI.

The 20 minute, 50 year ARI reinfall intensity for Kuala Pilah


is estimated using Equation 13.3:

For ARI of 50 years, From Table 13.A1, for t = 30 minutes;

a = 4.7768 c = -0.3158

b = 0.8716 d = 0.0191

In(RIt) = a + b In(t) + c [In(t)]2 + d [In(t)]3 In(t) = 3.4012


[In(t)] 2
= 11.5681
In( It)
R
= 4.8396 [In(t)]3 = 39.3455

### I ### = 126 mm/hr

For ARI of 50 years, From Table 13.A1, for t = 60 minutes;

a = 4.7768 c = -0.3158

b = 0.8716 d = 0.0191

In(RIt) = a + b In(t) + c [In(t)]2 + d [In(t)]3 In(t) = 4.0943


[In(t)]2 = 16.7637
In(RIt) = 4.3624 [In(t)]3 = 68.6362

### I ### = 78 mm/hr

Convert to reinfall depth

50 P ### = 50
I30 x duration or t in hour

50 P ### = 63 mm

50 P ### = 78 mm
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

From Figure 13.3, 2 P 24h ≤ 100 mm for Kuala Pilah

From Table 13.3, FD = Interpolation, t From Table 13.3

t = 20 2
P24h = 0.47
t = 20 2
P24h = x
t = 30 2
P24h = 0

FD = 0.470

Pd = P30 - FD (P60 - P30) Equation 13.3

50
Pd = 56.0 mm

Therefore, Id = Pd / duration ; duration = d = 20 minutes

= 0.3333 hours

Id Pd
=
d

56.0
=
0.3333
50
Id = 168 mm/hr

Using the Rational Method, the major system flow is calculated as follows:

I Impervious Area Pervious Area On site


ΣCA Qd (l/s)
### (mm/hr) C A (m2) C A (m2) Detention
168 0.77 4925 0.49 3185 5352.9 249.9 OSD - 1
4925 3185

From Equation 20.6,

Q = CBcw B H ###

Assuming the head over the weir is limited to 100 mm and Cscw = 1.7

Therefore,
Q 249.9 x 10 -3
B = =
CBcw H ### 1.7 x 0.1 ###

= 4.648 m

Allowing 50 mm freeboard, the dimensions of the secondary outlet weir are:


UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

4647.93 mm (wide) x 150 mm (high)

Note:-
All drain from the housing scheme house to be discharged into above-ground storage
before released to main drain.

Determination of drain size

From Schedule A : Discharge capacity of Drain

Size of drain,

12 in Wide PC Drain with 18 in Wide Vertical Walls (W = 18 in)

Depth of water (ft) = 4.0 ft

Channel slope = 1/200

Discharge capacity,Q = 21.0 cfs

Velocity, V = 4.0 fps

From calculation,

Qd = 249.87 l/s

= 8.8253 cfs

So,

Q ( 21 ) > Qd ( 8.83 ) -----> O.K


UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

A 44000 mm

4000
OSD Storage
Maximum depth = 1000 mm
mm

DCP Secondary outlet

A 4648 mm Brick Retaining Wall

Brick Retaining Wall


OSD Storage (Secondary Outlet)
1000 m

DCP
(Primary Outlet) Open Drain
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05

SECTION A-A
PROBLEMS: IF 5 MINUTES DURATION RAINFALLS
10 YEAR ARI IN KL
20 minutes < 15 min to 72 hrs for Eq. 13.2 Minutes = 20

For ARI of 10 years, From Table 13.A1, for t = 30 minutes; Equation 13.1

a= 4.9696 c= -0.2584
b= 0.6796 d= 0.0147

In(RIt) = a + b In(t) + c [In(t)]2 + d [In(t)]3 In(t) = 3.401197


[In(t)]2 = 11.56814
In(RIt) = 4.870 [In(t)]3 = 39.34554

10
I = 130.3 mm/hr
30

10 = 65.1 mm/hr
P
30
SIMILARLY,
For ARI of 10 years, From Table 13.A1, for t = 60 minutes; Equation 13.1

a= 4.9696 c= -0.2584
b= 0.6796 d= 0.0147

In(RIt) = a + b In(t) + c [In(t)]2 + d [In(t)]3 In(t) = 4.094345


[In(t)]2 = 16.76366
In(RIt) = 4.429 [In(t)]3 = 68.63619

10
I = 83.8 mm/hr
60

10 = 83.8 mm/hr
P
60

FIGURE 5 in HP1-1982, P
24h is read approximately 100mm
Corresponding FD factor from Table 13.3 is 0.47

Equation 13.3

10
P = 65.1 - 0.47 ( 83.8 - 65.1 )
20
= 56.4 mm
10
I = 169.1 mm/hr
20
2.3115
-2.9892
0.5784

2.7825
-4.3317
1.0090
PROBLEMS: IF 5 MINUTES DURATION RAINFALLS
10 YEAR ARI IN KL
30 minutes < 15 min to 72 hrs for Eq. 13.2 Minutes = 30

For ARI of 10 years, From Table 13.A1, for t = 30 minutes; Equation 13.1

a= 4.9696 c= -0.2584
b= 0.6796 d= 0.0147

In(RIt) = a + b In(t) + c [In(t)]2 + d [In(t)]3 In(t) = 3.401197


[In(t)]2 = 11.56814
In(RIt) = 4.870 [In(t)]3 = 39.34554

10
I = 130.3 mm/hr
30

10 = 65.1 mm/hr
P
30
SIMILARLY,
For ARI of 10 years, From Table 13.A1, for t = 60 minutes; Equation 13.1

a= 4.9696 c= -0.2584
b= 0.6796 d= 0.0147

In(RIt) = a + b In(t) + c [In(t)]2 + d [In(t)]3 In(t) = 4.094345


[In(t)]2 = 16.76366
In(RIt) = 4.429 [In(t)]3 = 68.63619

10
I = 83.8 mm/hr
60

10 = 83.8 mm/hr
P
60

FIGURE 5 in HP1-1982, P
24h is read approximately 100mm
Corresponding FD factor from Table 13.3 is 0

Equation 13.3

10
P = 65.1 - 0 ( 83.8 - 65.1 )
30
= 65.1 mm
10
I = 130.3 mm/hr
30
2.3115
-2.9892
0.5784

2.7825
-4.3317
1.0090
PROBLEMS: IF 5 MINUTES DURATION RAINFALLS
10 YEAR ARI IN KL
35 minutes < 15 min to 72 hrs for Eq. 13.2 Minutes = 35

For ARI of 10 years, From Table 13.A1, for t = 30 minutes; Equation 13.1

a= 4.9696 c= -0.2584
b= 0.6796 d= 0.0147

In(RIt) = a + b In(t) + c [In(t)]2 + d [In(t)]3 In(t) = 3.401197


[In(t)]2 = 11.56814
In(RIt) = 4.870 [In(t)]3 = 39.34554

10
I = 130.3 mm/hr
30

10 = 65.1 mm/hr
P
30
SIMILARLY,
For ARI of 10 years, From Table 13.A1, for t = 60 minutes; Equation 13.1

a= 4.9696 c= -0.2584
b= 0.6796 d= 0.0147

In(RIt) = a + b In(t) + c [In(t)]2 + d [In(t)]3 In(t) = 4.094345


[In(t)]2 = 16.76366
In(RIt) = 4.429 [In(t)]3 = 68.63619

10
I = 83.8 mm/hr
60

10 = 83.8 mm/hr
P
60

FIGURE 5 in HP1-1982, P
24h is read approximately 100mm
Corresponding FD factor from Table 13.3 is 0

Equation 13.3

10
P = 65.1 - 0 ( 83.8 - 65.1 )
35
= 65.1 mm
10
I = 111.7 mm/hr
35
2.3115
-2.9892
0.5784

2.7825
-4.3317
1.0090
PROBLEMS: IF 5 MINUTES DURATION RAINFALLS
20 YEAR ARI IN KL
5 minutes < 15 min to 72 hrs for Eq. 13.2 Minutes = 5

For ARI of 20 years, From Table 13.A1, for t = 30 minutes; Equation 13.1

a= 4.9781 c= -0.2796
b= 0.7533 d= 0.0166

In(RIt) = a + b In(t) + c [In(t)]2 + d [In(t)]3 In(t) = 3.401197


[In(t)]2 = 11.56814
In(RIt) = 4.959 [In(t)]3 = 39.34554

20
I = 142.4 mm/hr
30

20 = 71.2 mm/hr
P
30
SIMILARLY,
For ARI of 20 years, From Table 13.A1, for t = 60 minutes; Equation 13.1

a= 4.9781 c= -0.2796
b= 0.7533 d= 0.0166

In(RIt) = a + b In(t) + c [In(t)]2 + d [In(t)]3 In(t) = 4.094345


[In(t)]2 = 16.76366
In(RIt) = 4.515 [In(t)]3 = 68.63619

20
I = 91.3 mm/hr
60

20 = 91.3 mm/hr
P
60

FIGURE 5 in HP1-1982, P
24h is read approximately 100mm
Corresponding FD factor from Table 13.3 is 2.08

Equation 13.3

20
P = 71.2 - 2.08 ( 91.3 - 71.2 )
5
= 29.3 mm
20
I = 352.1 mm/hr
5
2.5621
-3.2345
0.6531

3.0843
-4.6871
1.1394