No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05
2. Determine the amount of impervious and pervious areas draining to the OSD storage
system.
Impervious area:
Pervious area:
4. Calculate the pre and post-development flows for the area draining to the OSD
storage
a = 3.7967 c = -0.4012
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05
b = 1.2904 d = 0.0247
5 I ### = 91 mm/hr
Using Rational Method, the pre and post development flows are calculated as
follows:
Note :
C = 0.77 - refer to Design Chart 14.3 for category 3
From Equation 19.1, Permissible Site Discharge (PSD) for above-ground storage:
Qa Qp 567
a = [ 4
tc ] [ 0.333 tc
Qa
+ 0.75 tc + 0.25 tcs ] 5.6
a = 477.09 5
b = 4 Qp Qa
= 26330
a - ( a 2 - 4 b ) 1
PSD =
2
127.3866
=
2
= 63.6933 l/s
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05
6. Determine the required Site Storage Requirement (SSR) (10 year ARI)
Using Equation 19.2 with Equation 19.2a and 19.2b for above-ground storage, the
site discharge for the storage design storm (10 year ARI) and the corresponding
SSR is calculated for the range of storm durations to determine the maximum SSR.
These calculations are summarised in the following two tables.
= 142.67 m3
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05
The primary outlet orifice is sized to discharge the PSD assuming free outlet
conditions when the storage is full. Using a 600mm deep DCP and a maximum storage
depth of 1000mm, adopt a maximum head to the centreline of orifice of 0.8m. The
required orifice size under freeoutlet conditions is calculated by rearranging
Equation 19.3:
PSD 63.6933 x 10 -3
PSD = =
Cd [ 2gHo ] 1 0.62 ( 2 x 9.81 x 0.8 ) 1
= 0.0259 m2
4 Ao 0.5 4 x 0.0259 1
D = [ π ] = [ 3.1416 ]
= 0.1817 m = 181.7 mm ----> say 200 mm
Maximum allowable depth for landscaped storage area is 1000mm. However, to reduce
the height of the brick retaining wall, a maximum storage depth of 1000mm has been
adopted.
Maximum storage depth = 1000 mm
The minimum recommended floor slope is 2% graded toward the DCP. Assuming the
average depth in the storage is 918mm, the adopted dimensions of the revised
storage volume are:
Try 17 m x 10.2 m x 0.918 m
The secondary outlet is broad-crested weir slotted into the retaining wall along
the front boundary. The weir should be sized for the estimated major system ARI
flow from the site for time tcs. The major drainage system in the catchment has
been designed for 50 year ARI.
a = 4.7768 c = -0.3158
b = 0.8716 d = 0.0191
a = 4.7768 c = -0.3158
b = 0.8716 d = 0.0191
50 P ### = 50
I30 x duration or t in hour
50 P ### = 63 mm
50 P ### = 78 mm
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05
t = 20 2
P24h = 0.47
t = 20 2
P24h = x
t = 30 2
P24h = 0
FD = 0.470
50
Pd = 56.0 mm
= 0.3333 hours
Id Pd
=
d
56.0
=
0.3333
50
Id = 168 mm/hr
Using the Rational Method, the major system flow is calculated as follows:
Q = CBcw B H ###
Assuming the head over the weir is limited to 100 mm and Cscw = 1.7
Therefore,
Q 202.6 x 10 -3
B = =
CBcw H ### 1.7 x 0.1 ###
= 3.768 m
Note:-
All drain from the housing scheme house to be discharged into above-ground storage
before released to main drain.
Size of drain,
From calculation,
Qd = 202.59 l/s
= 7.1553 cfs
So,
A 17000 mm
10200 mm
OSD Storage
Maximum depth = 1000 mm
DCP
(Primary Outlet) Open Drain
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05
SECTION A-A
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05
DESIGNING A COMPOSITE ABOVE AND BELOW-GROUND STORAGE SYSTEM FOR CATCHMENT AREA
NO.2A
2.
Determine the areas of the site that will be directed to the OSD storage system.
The whole area of the site will drain to the OSD storage.
3. Determine the amount of impervious and pervious areas draining to the OSD storage
system.
Impervious area:
Pervious area:
5. Calculate the pre and post-development flows for the area draining to the OSD
storage
a = 3.7967 c = -0.4012
b = 1.2904 d = 0.0247
5 I ### = 91 mm/hr
Using Rational Method, the pre and post development flows are calculated as
follows:
Note :
C = 0.77 - refer to Design Chart 14.3 for category 3
From Equation 19.1, Permissible Site Discharge (PSD) for above-ground storage:
Qa Qp 350
a = [ 4
tc ] [ 0.333 tc
Qa
+ 0.75 tc + 0.25 tcs ] 6.3
a = 300.09 5
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05
b = 4 Qp Qa
= 11138
a - ( a 2 - 4 b ) 1
PSD =
2
86.7758
=
2
= 43.4 l/s
7. Determine the required Site Storage Requirement (SSR) (10 year ARI)
Using Equation 19.2 with Equation 19.2a and 19.2b for above-ground storage, the
site discharge for the storage design storm (10 year ARI) and the corresponding
SSR is calculated for the range of storm durations to determine the maximum SSR.
These calculations are summarised in the following two tables.
The primary outlet flow restricting pipe is to be sized to discharge 83.6 l/s
when the car park storage is full. The required pipe diameter is found by
rearranging Equation 19.6 and using trial and error:
PSD and 4 Ap 1
Ap =
ys + S L - ye 1
Dp = [ π ]
[ 2g x
KL ]
where KL = Kt + Ke + Kf + Ko
Using the downstream end of the outlet pipe as the hight datum,
ys = 2.4 m
ye = 0.6 m
Length L = 20.0 m
= 0.55
Ke = 1
- 1
0.6 2
= 1.7778
0.009 2 x 20.0
Ke = 125 x
D 1/3
D
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05
= 0.2025 D -4/3
(Kt + Ke + Kf + Ko)V2/2g
Pipe Package Hydraulic Grade Line Pipe HGL
Ye
Ys S.L
Municipal pipe
L = 20.0 m
Adopting an initial trial diameter of 150mm, the trial and error calculations are
summarised in the following table.
ys + S L - ye 1
Q = A [ 2g x KL ]
= 46.0
A pipe diameter of 150mm is adopted. This will give an outflow of 46.0 l/s which
is acceptable (less than 5% greater then the PSD)
a) Pipe package
Adopting 2 x 900 mm diameter pipes, the volume of the inlet and outlet
chambers is:
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05
= 6.48 m3
The total length of pipe required is found by dividing the residual volume by
the pipe cross-sectional area:
30.48 - 6.48
Length =
π x 0.9 2
2 x [ 4 ]
= 18.9 m
b) Car Park
Using a maximum allowable ponding depth in a car park area is 150mm (Table
19.2) and a minimum surface slope of 0.7%, the storage volume is calculated
to cover the area shown in Figure below.
Secondary outlet A
A
Car park and access
Office Building
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05
Office Building
Secondary outlet
Car park storage (overflow over kerb)
Pipe package
(2 x 900 mm pipes)
a = 4.7768 c = -0.3158
b = 0.8716 d = 0.0191
a = 4.7768 c = -0.3158
b = 0.8716 d = 0.0191
50 P ### = 50
I30 x duration or t in hour
50 P ### = 63 mm
50 P ### = 78 mm
t = 20 2
P24h = 0.47
t = 20 2
P24h = x
t = 30 2
P24h = 0
FD = 0.470
50
Pd = 56.0 mm
= 0.3333 hours
Id Pd
=
d
56.0
=
0.3333
50
Id = 168 mm/hr
Using the Rational Method, the major system flow is calculated as follows:
Q = CBcw B H ###
Assuming the head over the weir is limited to 50 mm and Cscw = 1.7
Therefore,
Q 122.5 x 10 -3
B = =
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05
B = =
CBcw H ### 1.7 x 0.05 ###
= 6.446 m
Note:-
All drain from the development scheme to be discharged into Composite Above and
Below-Ground Storage System before released to main drain.
Size of drain,
From calculation,
Qd = 122.51 l/s
= 4.3270 cfs
So,
2. Determine the amount of impervious and pervious areas draining to the OSD storage
system.
Impervious area:
Pervious area:
4. Calculate the pre and post-development flows for the area draining to the OSD
storage
a = 3.7967 c = -0.4012
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05
b = 1.2904 d = 0.0247
5 I ### = 91 mm/hr
Using Rational Method, the pre and post development flows are calculated as
follows:
Note :
C = 0.77 - refer to Design Chart 14.3 for category 3
From Equation 19.1, Permissible Site Discharge (PSD) for above-ground storage:
Qa Qp 326
a = [ 4
tc ] [ 0.333 tc
Qa
+ 0.75 tc + 0.25 tcs ] 6.5
a = 281.58 5
b = 4 Qp Qa
= 10085
a - ( a 2 - 4 b ) 1
PSD =
2
84.2287
=
2
= 42.1143 l/s
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05
6. Determine the required Site Storage Requirement (SSR) (10 year ARI)
Using Equation 19.2 with Equation 19.2a and 19.2b for above-ground storage, the
site discharge for the storage design storm (10 year ARI) and the corresponding
SSR is calculated for the range of storm durations to determine the maximum SSR.
These calculations are summarised in the following two tables.
= 78.49 m3
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05
The primary outlet orifice is sized to discharge the PSD assuming free outlet
conditions when the storage is full. Using a 600mm deep DCP and a maximum storage
depth of 1200mm, adopt a maximum head to the centreline of orifice of 0.8m. The
required orifice size under freeoutlet conditions is calculated by rearranging
Equation 19.3:
PSD 42.1143 x 10 -3
PSD = =
Cd [ 2gHo ] 1 0.62 ( 2 x 9.81 x 0.8 ) 1
= 0.0171 m2
4 Ao 0.5 4 x 0.0171 1
D = [ π ] = [ 3.1416 ]
= 0.1477 m = 147.75 mm ----> say 150 mm
Maximum allowable depth for landscaped storage area is 1200mm. However, to reduce
the height of the brick retaining wall, a maximum storage depth of 1200mm has been
adopted.
Maximum storage depth = 1200 mm
The minimum recommended floor slope is 2% graded toward the DCP. Assuming the
average depth in the storage is 1200mm, the adopted dimensions of the revised
storage volume are:
Try 28 m x 2.4 m x 1.2 m
The secondary outlet is broad-crested weir slotted into the retaining wall along
the front boundary. The weir should be sized for the estimated major system ARI
flow from the site for time tcs. The major drainage system in the catchment has
been designed for 50 year ARI.
a = 4.7768 c = -0.3158
b = 0.8716 d = 0.0191
a = 4.7768 c = -0.3158
b = 0.8716 d = 0.0191
50 P ### = 50
I30 x duration or t in hour
50 P ### = 63 mm
50 P ### = 78 mm
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05
t = 20 2
P24h = 0.47
t = 20 2
P24h = x
t = 30 2
P24h = 0
FD = 0.470
50
Pd = 56.0 mm
= 0.3333 hours
Id Pd
=
d
56.0
=
0.3333
50
Id = 168 mm/hr
Using the Rational Method, the major system flow is calculated as follows:
Q = CBcw B H ###
Assuming the head over the weir is limited to 100 mm and Cscw = 1.7
Therefore,
Q 114.0 x 10 -3
B = =
CBcw H ### 1.7 x 0.1 ###
= 2.120 m
Note:-
All drain from the housing scheme house to be discharged into above-ground storage
before released to main drain.
Size of drain,
From calculation,
Qd = 113.98 l/s
= 4.0257 cfs
So,
A 28000 mm
2400
OSD Storage
Maximum depth = 1200 mm
mm
DCP
(Primary Outlet) Open Drain
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05
SECTION A-A
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05
2. Determine the amount of impervious and pervious areas draining to the OSD storage
system.
Impervious area:
Pervious area:
4. Calculate the pre and post-development flows for the area draining to the OSD
storage
a = 3.7967 c = -0.4012
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05
b = 1.2904 d = 0.0247
5 I ### = 91 mm/hr
Using Rational Method, the pre and post development flows are calculated as
follows:
Note :
C = 0.77 - refer to Design Chart 14.3 for category 3
From Equation 19.1, Permissible Site Discharge (PSD) for above-ground storage:
Qa Qp 676
a = [ 4
tc ] [ 0.333 tc
Qa
+ 0.75 tc + 0.25 tcs ] 6.4
a = 581.68 5
b = 4 Qp Qa
= 42425
a - ( a 2 - 4 b ) 1
PSD =
2
171.0103
=
2
= 85.5052 l/s
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05
6. Determine the required Site Storage Requirement (SSR) (10 year ARI)
Using Equation 19.2 with Equation 19.2a and 19.2b for above-ground storage, the
site discharge for the storage design storm (10 year ARI) and the corresponding
SSR is calculated for the range of storm durations to determine the maximum SSR.
These calculations are summarised in the following two tables.
= 163.46 m3
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05
The primary outlet orifice is sized to discharge the PSD assuming free outlet
conditions when the storage is full. Using a 600mm deep DCP and a maximum storage
depth of 1000mm, adopt a maximum head to the centreline of orifice of 0.8m. The
required orifice size under freeoutlet conditions is calculated by rearranging
Equation 19.3:
PSD 85.5052 x 10 -3
PSD = =
Cd [ 2gHo ] 1 0.62 ( 2 x 9.81 x 0.8 ) 1
= 0.0348 m2
4 Ao 0.5 4 x 0.0348 1
D = [ π ] = [ 3.1416 ]
= 0.2105 m = 210.53 mm ----> say 250 mm
Maximum allowable depth for landscaped storage area is 1000mm. However, to reduce
the height of the brick retaining wall, a maximum storage depth of 1000mm has been
adopted.
Maximum storage depth = 1000 mm
The minimum recommended floor slope is 2% graded toward the DCP. Assuming the
average depth in the storage is 968mm, the adopted dimensions of the revised
storage volume are:
Try 44 m x 4 m x 0.968 m
The secondary outlet is broad-crested weir slotted into the retaining wall along
the front boundary. The weir should be sized for the estimated major system ARI
flow from the site for time tcs. The major drainage system in the catchment has
been designed for 50 year ARI.
a = 4.7768 c = -0.3158
b = 0.8716 d = 0.0191
a = 4.7768 c = -0.3158
b = 0.8716 d = 0.0191
50 P ### = 50
I30 x duration or t in hour
50 P ### = 63 mm
50 P ### = 78 mm
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05
t = 20 2
P24h = 0.47
t = 20 2
P24h = x
t = 30 2
P24h = 0
FD = 0.470
50
Pd = 56.0 mm
= 0.3333 hours
Id Pd
=
d
56.0
=
0.3333
50
Id = 168 mm/hr
Using the Rational Method, the major system flow is calculated as follows:
Q = CBcw B H ###
Assuming the head over the weir is limited to 100 mm and Cscw = 1.7
Therefore,
Q 249.9 x 10 -3
B = =
CBcw H ### 1.7 x 0.1 ###
= 4.648 m
Note:-
All drain from the housing scheme house to be discharged into above-ground storage
before released to main drain.
Size of drain,
From calculation,
Qd = 249.87 l/s
= 8.8253 cfs
So,
A 44000 mm
4000
OSD Storage
Maximum depth = 1000 mm
mm
DCP
(Primary Outlet) Open Drain
UCCAS POTENTIAL ENGINEERS Title : Cadangan Membina Dan Menyiapkan Bangunan Stor Dan
No 25. Tkt 1, Jalan SJ 8/1B, 12 Unit Kuarters Kakitangan Kerajaan Kelas 'E'
(Rumah Berkembar), Di Atas Lot 1433, Mukim Juasseh,
Taman Seremban Jaya Daerah Kuala Pilah, N.S.D.K.
70450 Seremban
Negeri Sembilan Darul Khusus Design by : Nor Azman Osman Job No :
Tel : 06 - 6771593 Checked by : Ir. A. Kassim Ali Sheet No :
Fax : 06 - 6778270 Date : April 05
SECTION A-A
PROBLEMS: IF 5 MINUTES DURATION RAINFALLS
10 YEAR ARI IN KL
20 minutes < 15 min to 72 hrs for Eq. 13.2 Minutes = 20
For ARI of 10 years, From Table 13.A1, for t = 30 minutes; Equation 13.1
a= 4.9696 c= -0.2584
b= 0.6796 d= 0.0147
10
I = 130.3 mm/hr
30
10 = 65.1 mm/hr
P
30
SIMILARLY,
For ARI of 10 years, From Table 13.A1, for t = 60 minutes; Equation 13.1
a= 4.9696 c= -0.2584
b= 0.6796 d= 0.0147
10
I = 83.8 mm/hr
60
10 = 83.8 mm/hr
P
60
FIGURE 5 in HP1-1982, P
24h is read approximately 100mm
Corresponding FD factor from Table 13.3 is 0.47
Equation 13.3
10
P = 65.1 - 0.47 ( 83.8 - 65.1 )
20
= 56.4 mm
10
I = 169.1 mm/hr
20
2.3115
-2.9892
0.5784
2.7825
-4.3317
1.0090
PROBLEMS: IF 5 MINUTES DURATION RAINFALLS
10 YEAR ARI IN KL
30 minutes < 15 min to 72 hrs for Eq. 13.2 Minutes = 30
For ARI of 10 years, From Table 13.A1, for t = 30 minutes; Equation 13.1
a= 4.9696 c= -0.2584
b= 0.6796 d= 0.0147
10
I = 130.3 mm/hr
30
10 = 65.1 mm/hr
P
30
SIMILARLY,
For ARI of 10 years, From Table 13.A1, for t = 60 minutes; Equation 13.1
a= 4.9696 c= -0.2584
b= 0.6796 d= 0.0147
10
I = 83.8 mm/hr
60
10 = 83.8 mm/hr
P
60
FIGURE 5 in HP1-1982, P
24h is read approximately 100mm
Corresponding FD factor from Table 13.3 is 0
Equation 13.3
10
P = 65.1 - 0 ( 83.8 - 65.1 )
30
= 65.1 mm
10
I = 130.3 mm/hr
30
2.3115
-2.9892
0.5784
2.7825
-4.3317
1.0090
PROBLEMS: IF 5 MINUTES DURATION RAINFALLS
10 YEAR ARI IN KL
35 minutes < 15 min to 72 hrs for Eq. 13.2 Minutes = 35
For ARI of 10 years, From Table 13.A1, for t = 30 minutes; Equation 13.1
a= 4.9696 c= -0.2584
b= 0.6796 d= 0.0147
10
I = 130.3 mm/hr
30
10 = 65.1 mm/hr
P
30
SIMILARLY,
For ARI of 10 years, From Table 13.A1, for t = 60 minutes; Equation 13.1
a= 4.9696 c= -0.2584
b= 0.6796 d= 0.0147
10
I = 83.8 mm/hr
60
10 = 83.8 mm/hr
P
60
FIGURE 5 in HP1-1982, P
24h is read approximately 100mm
Corresponding FD factor from Table 13.3 is 0
Equation 13.3
10
P = 65.1 - 0 ( 83.8 - 65.1 )
35
= 65.1 mm
10
I = 111.7 mm/hr
35
2.3115
-2.9892
0.5784
2.7825
-4.3317
1.0090
PROBLEMS: IF 5 MINUTES DURATION RAINFALLS
20 YEAR ARI IN KL
5 minutes < 15 min to 72 hrs for Eq. 13.2 Minutes = 5
For ARI of 20 years, From Table 13.A1, for t = 30 minutes; Equation 13.1
a= 4.9781 c= -0.2796
b= 0.7533 d= 0.0166
20
I = 142.4 mm/hr
30
20 = 71.2 mm/hr
P
30
SIMILARLY,
For ARI of 20 years, From Table 13.A1, for t = 60 minutes; Equation 13.1
a= 4.9781 c= -0.2796
b= 0.7533 d= 0.0166
20
I = 91.3 mm/hr
60
20 = 91.3 mm/hr
P
60
FIGURE 5 in HP1-1982, P
24h is read approximately 100mm
Corresponding FD factor from Table 13.3 is 2.08
Equation 13.3
20
P = 71.2 - 2.08 ( 91.3 - 71.2 )
5
= 29.3 mm
20
I = 352.1 mm/hr
5
2.5621
-3.2345
0.6531
3.0843
-4.6871
1.1394