10% Line Patrolling Report of ADE/LINES/NALGONDA (NKP & NLG Sub-Divisions) for the month of January- 2022.

Total
Sl.No ADE TARGET ACTUAL LINE LENGTH Observations made Remarks
Line

Length Line Date of


SS SS IN KMs Loc.Nos. Km At Loc. No. Nature of defect Action taken
in Kms Length Patrolling
10.01.2022 400KV SRPT-Malkaram Line 459 to 468 3.97 --- Regrowth of trees Tree cutting done
12.01.2022 400KV SRPT-Kethireddipally Line 155 to 168 5.20 162 to 166 Regrowth of trees Tree cutting done
203.747 20.375 21.01.2022 400KV SRPT-Kethireddipally Line 141 to 148 --- Normal
2.72 Bushes cleared at legs
25.01.2022 400KV SRPT-Kethireddipally Line 169 to 191 162 to 166 Normal
8.50 Bushes cleared at legs
29.01.2022 400KV Khammam-Mamidipally Line 188 to 198 Normal
4.20 Bushes cleared at legs PMI
07.01.2022 220KV NKP -SRPT & HZNR line 310 to 322 4.50 314 to 318 Regrowth of trees Tree cutting done

11.01.2022 220KV NKP -Malkaram line 27 to 33,42 ---


to 47 4.30 Regrowth of trees Special line patrolling done

113.26 11.326 20.01.2022 220KV NKP -Malkaram line 42 --- --- Disc flash over R-ph flash overed Disc
Insulators replaced with new
ADE/LINES/ SRC string at loc no 42
1
NALGONDA Normal
22.01.2022 220KV NKP -Malkaram line 133 to 152 6.40 --- Special line patrolling done
24.01.2022 220KV NKP -Malkaram line 72 to 90 5.39 84,86 to 90 Regrowth of trees Tree cutting done
27.01.2022 220KV NKP -SRPT & HZNR line 353 to 331 7.50 350 to 348.344 Regrowth of trees Tree cutting done
03.01.2022 132KV NKP-USTPL 1 to 8 2.40 1 to 8
Regrowth of trees Tree cutting done PMI
04.01.2022 132KV NLG-Narketpally Line 38 to 48 3.3 39 to 42 Regrowth of trees Tree cutting done PMI
05.01.2022 132K NKP-USAI FORGE,132KV OCTL 1 to6, 0 to 1 2 1 to6, 0 to 1 Regrowth of trees Tree cutting done PMI
194.75 19.48 17.01.2022 132KV CTPL-RMPT-I Line 48 to 58 2.95 --- --- Special line patrolling done PMI

R-ph flash overed Disc


26.01.2022 132KV NLG-Madgulapally Line 77 --- --- Disc flash over Insulators replaced with new
Disc insulators string at loc no
77
31.01.2022 132KV Aitipamula tapping Line 1 to 20 4.83 32 to35 --- Special line patrolling done PMI

10% Line Patrolling Report of AE/LINES/NALGONDA (NKP & NLG Sub-Divisions) for the month of January- 2022.
Total
Sl.No ADE TARGET ACTUAL LINE LENGTH Observations made Remarks
Line

Length Line Date of


SS Length SS Patrolling IN KMs Loc.Nos. Km At Loc. No. Nature of defect Action taken
in Kms
10.01.2022 400KV SRPT-Malkaram Line 459 to 468 3.97 --- Regrowth of trees Tree cutting done
12.01.2022 400KV SRPT-Kethireddipally Line 155 to 168 5.20 162 to 166 Regrowth of trees Tree cutting done
205.635 20.564 21.01.2022 400KV SRPT-Kethireddipally Line 141 to 148 2.72 --- Normal Bushes cleared at legs
205.635 20.564
25.01.2022 400KV SRPT-Kethireddipally Line 169 to 191 8.50 --- Normal Bushes cleared at legs
29.01.2022 400KV Khammam-Mamidipally Line 188 to 198 4.20 --- Normal Bushes cleared at legs PMI
07.01.2022 220KV NKP -SRPT & HZNR line 310 to 322 4.50 314 to 318 Regrowth of trees Tree cutting done

11.01.2022 220KV NKP -Malkaram line 27 to 33,42 ---


to 47 4.30 Regrowth of trees Special line patrolling done

113.26 11.326 R-ph flash overed Disc


20.01.2022 220KV NKP -Malkaram line 42 --- --- Disc flash over Insulators replaced with new
AE/LINES/ SRC string at loc no 42
1 NALGONDA 22.01.2022 220KV NKP -Malkaram line 133 to 152 6.40 --- Normal Special line patrolling done
24.01.2022 220KV NKP -Malkaram line 72 to 90 5.39 84,86 to 90 Regrowth of trees Tree cutting done
27.01.2022 220KV NKP -SRPT & HZNR line 353 to 331 7.50 350 to 348,344 Regrowth of trees Tree cutting done
03.01.2022 132KV NKP-USTPL 1 to 8 2.40 1 to 8 Regrowth of trees Tree cutting done PMI
04.01.2022 132KV NLG-Narketpally Line 38 to 48 3.3 39 to 42 Regrowth of trees Tree cutting done PMI

05.01.2022 1 to6, 0 to 1 1 to6, 0 to 1


132K NKP-USAI FORGE,132KV OCTL 2 Regrowth of trees Tree cutting done PMI
194.75 19.48 17.01.2022 132KV CTPL-RMPT-I Line 48 to 58 2.95 --- --- Special line patrolling done PMI

R-ph flash overed Disc


26.01.2022 132KV NLG-Madgulapally Line 77 --- --- Disc flash over Insulators replaced with new
Disc insulators string at loc no
77
31.01.2022 132KV Aitipamula tapping Line 1 to 20 4.83 32 to35 --- Special line patrolling done PMI

Endt.No.ADE/LINES/NLG/SD/F.No./D.No. /21 .Dt. .02.2022.


Submitted to the Divisional Engineer/O&M/Nalgonda for favour of taking further necessary action.

Assistant divisional Engineer


LINES : TSTRANSCO
Nalgonda