Professional Documents
Culture Documents
Deliverables 2.3.1
Deliverables 2.3.1
Deliverables 2.3.1
Construction Drawings
o Site Plan
o Rendering
o Floor Plan (fully dimensioned)
o Four Elevations
o Interior Elevations of bathroom and kitchen
o Typical Wall Section including foundation (with labeled components)
o Window Schedule- after break
o Door Schedule- after break
o Room Schedule- after break
o Electrical Plan – symbols see sheet in 2.3.6- yellow line sketches
o Plumbing Plan – blue line/ sketches (sewage/dirty water is brown line)
Appendices
o Client Survey
o Client meeting notes