DAILY FIELD

POLYBUILD CONSTRUCTION SERVICES


INSPECTION /
+63 917-547-2388 / polybuild.ph@gmail.com PROGRESS REPORT
Architect-of-Record:
PROJECT TITLE: DVP Residence - Proposed Three-Storey Split Type Residence w/ Attic
Nana & Co Architecture
L2-3 B1 Waterwood Park Village, Brgy. Sto. Cristo & Concepcion, 11-07-2022
PROJECT SITE:
Baliuag, Bulacan
MM/DD/YYYYY
PROJECT OWNER: Angelo B. Polinario and Sophie Arianne C. Dela Victoria Su M T W TH F Sa

WEATHER: SUNNY (SU) FAIR (F) LIGHT RAIN (LR) RAINY (R) HEAVY R (HR) STORMY (S)
SU
6 7 8 9 10 11 12 13 14 15 16 17 18 19

PO AoR PM CM SA/E
MANPOWER:
✔ ✔
Name Position Present Absent
1 Arnelito Igna Foreman ✔
2 Angelito Igna All Around Skilled ✔
3 Aris Gregorio Specific Skilled - Mason ✔
4 Roy Catactan Labor ✔
5 Manolito Abad Labor ✔
6 Christopher Brozo Labor ✔
7 Agapito Banguel Specific Skilled - Mason ✔
8 Rizaldo Ramos Labor ✔
9 Starvie Balajadia Labor ✔
10 Joshua Joson Labor ✔
11 Amilito Legaspi Specific Skilled - Steelman ✔
12 Jericho De Guzman Labor ✔
13 Edwin Barja Labor ✔
14 Joshua Baltazar Labor ✔
15 Resty Valencia Labor ✔
16 Wilson Joson Labor ✔
17 Gregorio Santos Specific Skilled - Mason ✔
TEAM 2
18 Mark Villa Foreman ✔
19 Jay Carlo Abino Carpenter/ Steelman ✔
20 John Roel Abino Carpenter/ Steelman ✔
21 Jervy Abino Carpenter/ Steelman ✔

22 Gerry Valderama Carpenter/ Steelman ✔

23 Gener Fuentes Carpenter/ Steelman ✔

24 Renhzon Talavera Carpenter/ Steelman ✔

25 Melchor Villa Carpenter/ Steelman ✔

26 Jerry Montajes Carpenter/ Steelman ✔

27 Darwin Gonzaga Skilled ✔

28 John Carlo Angeles Labor ✔

29 Kevin Cudia ✔
Total Manpower: 25
WORK PERFORMED:
WBS %P Work Packages Description Location Remarks
Installation of Scaffoldings & Beam runners
For Attic Level
Concrete & Fixing of beam Stirrups for Third Floor Side
Reinforcement
Fabrication and Repairing of Formworks

EQUIPMENT USED:

Grinders, Cut-Off Machine


MATERIALS DELIVERED TO SITE:
Description Qty Unit BOQ Ref Location
None

ISSUES/ PROBLEMS/ INCIDENTS ENCOUNTERED:


WBS Work Packages Description Action Taken

CONSULTANTS’ COMMENTS:
To be completed by the Architect-of-Record /
Allied Consultants

Consultant’s Authorized Person: Signature: Date:

VISITORS:
Name Position Company Purpose

Documented By: Reviewed By: Concurred By:

Arch. Reynold De Leon Arch. Joramae Balbin Arch. Alvin Paul Dela Cruz
Site Architect Project Manager Contractor
Footnotes:
PO - Project Owner
AoR - Architect-of-Record
PM - Project Manager
CM - Construction Manager
SA/SE - Site Architect/Engineer

Additional Notes:

Reynold De Leon: 1-hour undertime.


NOVEMBER 7, 2022 | MONDAY
PHOTO DOCUMENTATION:

Installation of Scaffolding and Beam Runners for Attic Level


Fixing of beam Stirrups for Third Floor Side
Fabrication and Repairing of Formworks
Laying of Concrete hollow blocks and Installation of Beam Rebars
DAILY FIELD
POLYBUILD CONSTRUCTION SERVICES
INSPECTION /
+63 917-547-2388 / polybuild.ph@gmail.com PROGRESS REPORT
Architect-of-Record:
PROJECT TITLE: DVP Residence - Proposed Three-Storey Split Type Residence w/ Attic
Nana & Co Architecture
L2-3 B1 Waterwood Park Village, Brgy. Sto. Cristo & Concepcion, 11-08-2022
PROJECT SITE:
Baliuag, Bulacan
MM/DD/YYYYY
PROJECT OWNER: Angelo B. Polinario and Sophie Arianne C. Dela Victoria Su M T W TH F Sa

WEATHER: SUNNY (SU) FAIR (F) LIGHT RAIN (LR) RAINY (R) HEAVY R (HR) STORMY (S)
F
6 7 8 9 10 11 12 13 14 15 16 17 18 19

PO AoR PM CM SA/E
MANPOWER:
✔ ✔ ✔
Name Position Present Absent
1 Arnelito Igna Foreman ✔

2 Angelito Igna All Around Skilled ✔

3 Aris Gregorio Specific Skilled - Mason ✔


4 Roy Catactan Labor ✔

5 Manolito Abad Labor ✔

6 Christopher Brozo Labor ✔

7 Agapito Banguel Specific Skilled - Mason ✔

8 Rizaldo Ramos Labor ✔


9 Starvie Balajadia Labor ✔
10 Joshua Joson Labor ✔

11 Amilito Legaspi Specific Skilled - Steelman ✔

12 Jericho De Guzman Labor ✔

13 Edwin Barja Labor ✔

14 Joshua Baltazar Labor ✔


15 Resty Valencia Labor ✔
16 Wilson Joson Labor ✔

17 Gregorio Santos Specific Skilled - Mason ✔

TEAM 2
18 Mark Villa Foreman ✔

19 Jay Carlo Abino Carpenter/ Steelman ✔

20 John Roel Abino Carpenter/ Steelman ✔


21 Jervy Abino Carpenter/ Steelman ✔

22 Gerry Valderama Carpenter/ Steelman ✔

23 Gener Fuentes Carpenter/ Steelman ✔

24 Renhzon Talavera Carpenter/ Steelman ✔

25 Melchor Villa Carpenter/ Steelman ✔

26 Jerry Montajes Carpenter/ Steelman ✔

27 Darwin Gonzaga Skilled ✔

28 John Carlo Angeles Labor ✔

29 Kevin Cudia ✔
Total Manpower: 26
WORK PERFORMED:
WBS %P Work Packages Description Location Remarks
Installation of Beam Runners for Attic Side
Installation of formworks for Master’s
Concrete & Bedroom Toilet & Bath
Reinforcement Preparation of Ground Floor Column for
Finishing – D2, B2, B3 respectively
Fixing of Beam Stirrups for 3F Side- 3B01,
3B21 respectively
EQUIPMENT USED:

MATERIALS DELIVERED TO SITE:


Description Qty Unit BOQ Ref Location
None

ISSUES/ PROBLEMS/ INCIDENTS ENCOUNTERED:


WBS Work Packages Description Action Taken

CONSULTANTS’ COMMENTS:
To be completed by the Architect-of-Record /
Allied Consultants

Consultant’s Authorized Person: Signature: Date:

VISITORS:
Name Position Company Purpose
BDO personnel BDO Site Survey

Documented By: Reviewed By: Concurred By:

Arch. Reynold De Leon Arch. Joramae Balbin Arch. Alvin Paul Dela Cruz
Site Architect Project Manager Contractor
Footnotes:
PO - Project Owner
AoR - Architect-of-Record
PM - Project Manager
CM - Construction Manager
SA/SE - Site Architect/Engineer

Additional Notes:
NOVEMBER 8, 2022 | TUESDAY
PHOTO DOCUMENTATION:

Installation of Beam Runners for Attic Side

Installation of Beam Runners - 4B13, 4B10, 4B15, 4B19, 4B16, 4B20, 4B03, 4B06, 4B17, 4B21 respectively
Installation of formworks for Master’s Bedroom Toilet & Bath

Preparation of Ground Floor Column for Finishing – D2, B2, B3 respectively


Fixing of Beam Stirrups for 3F Side- 3B01, 3B21 respectively

Fixing of Beam Stirrups for 3F Side- 3B17 ,3B11, 3B22 respectively


DAILY FIELD
POLYBUILD CONSTRUCTION SERVICES
INSPECTION /
+63 917-547-2388 / polybuild.ph@gmail.com PROGRESS REPORT
Architect-of-Record:
PROJECT TITLE: DVP Residence - Proposed Three-Storey Split Type Residence w/ Attic
Nana & Co Architecture
L2-3 B1 Waterwood Park Village, Brgy. Sto. Cristo & Concepcion, 11-09-2022
PROJECT SITE:
Baliuag, Bulacan
MM/DD/YYYYY
PROJECT OWNER: Angelo B. Polinario and Sophie Arianne C. Dela Victoria Su M T W TH F Sa

WEATHER: SUNNY (SU) FAIR (F) LIGHT RAIN (LR) RAINY (R) HEAVY R (HR) STORMY (S)
F
6 7 8 9 10 11 12 13 14 15 16 17 18 19

PO AoR PM CM SA/E
MANPOWER:
✔ ✔ ✔ ✔ ✔
Name Position Present Absent
1 Arnelito Igna Foreman ✔

2 Angelito Igna All Around Skilled ✔

3 Aris Gregorio Specific Skilled - Mason ✔


4 Roy Catactan Labor ✔

5 Manolito Abad Labor ✔ ✔


6 Christopher Brozo Labor ✔

7 Agapito Banguel Specific Skilled - Mason ✔

8 Rizaldo Ramos Labor ✔


9 Starvie Balajadia Labor ✔
10 Joshua Joson Labor ✔

11 Amilito Legaspi Specific Skilled - Steelman ✔

12 Jericho De Guzman Labor ✔

13 Edwin Barja Labor ✔

14 Joshua Baltazar Labor ✔


15 Resty Valencia Labor ✔
16 Wilson Joson Labor ✔

17 Gregorio Santos Specific Skilled - Mason ✔

TEAM 2
18 Mark Villa Foreman ✔
19 Jay Carlo Abino Carpenter/ Steelman ✔

20 John Roel Abino Carpenter/ Steelman ✔

21 Jervy Abino Carpenter/ Steelman ✔

22 Gerry Valderama Carpenter/ Steelman ✔

23 Gener Fuentes Carpenter/ Steelman ✔

24 Renhzon Talavera Carpenter/ Steelman ✔

25 Melchor Villa Carpenter/ Steelman ✔

26 Jerry Montajes Carpenter/ Steelman ✔

27 Darwin Gonzaga Skilled ✔

28 John Carlo Angeles Labor ✔

29 Kevin Cudia ✔
Total Manpower: 26
WORK PERFORMED:
WBS %P Work Packages Description Location Remarks
Installation of Beam Runners for Attic Side
Concrete &
Reinforcement Splicing of column main bar for 3rd floor side-
B4, B5, D3, F3, F5, F5’,
EQUIPMENT USED:

Grinders, Cut-off machine


MATERIALS DELIVERED TO SITE:
Description Qty Unit BOQ Ref Location
Rebars

ISSUES/ PROBLEMS/ INCIDENTS ENCOUNTERED:


WBS Work Packages Description Action Taken

CONSULTANTS’ COMMENTS:
To be completed by the Architect-of-Record /
Allied Consultants

Consultant’s Authorized Person: Signature: Date:

VISITORS:
Name Position Company Purpose
Sab Briones Design Intern Nana X Co Site Visit
Architect-of-
Diana Dela Victoria Nana X Co Site Visit
Record
Joramae Balbin Project Manager Polybuild Site Visit

Documented By: Reviewed By: Concurred By:

Arch. Reynold De Leon Arch. Joramae Balbin Arch. Alvin Paul Dela Cruz
Site Architect Project Manager Contractor
Footnotes:
PO - Project Owner
AoR - Architect-of-Record
PM - Project Manager
CM - Construction Manager
SA/SE - Site Architect/Engineer

Additional Notes:
NOVEMBER 9, 2022 | WEDNESDAY
PHOTO DOCUMENTATION:

Installation of Beam Runners - 4b02, 4b04, 4b05, 4b07, 4b08, 4b09 respectively

Installation of Beam Runners – 4B11, 4B12, 4B14 respectively


Splicing of column main bar for 3rd floor side- B4, B5 respectively

Splicing of column main bar for 3rd floor side- D3, F3 respectively
Splicing of column main bar for 3rd floor side- F5, F5’ respectively
DAILY FIELD
POLYBUILD CONSTRUCTION SERVICES
INSPECTION /
+63 917-547-2388 / polybuild.ph@gmail.com PROGRESS REPORT
Architect-of-Record:
PROJECT TITLE: DVP Residence - Proposed Three-Storey Split Type Residence w/ Attic
Nana & Co Architecture
L2-3 B1 Waterwood Park Village, Brgy. Sto. Cristo & Concepcion, 11-10-2022
PROJECT SITE:
Baliuag, Bulacan
MM/DD/YYYYY
PROJECT OWNER: Angelo B. Polinario and Sophie Arianne C. Dela Victoria Su M T W TH F Sa

WEATHER: SUNNY (SU) FAIR (F) LIGHT RAIN (LR) RAINY (R) HEAVY R (HR) STORMY (S)
SU
6 7 8 9 10 11 12 13 14 15 16 17 18 19

PO AoR PM CM SA/E
MANPOWER:
✔ ✔
Name Position Present Absent
1 Arnelito Igna Foreman ✔

2 Angelito Igna All Around Skilled ✔

3 Aris Gregorio Specific Skilled - Mason ✔


4 Roy Catactan Labor ✔

5 Manolito Abad Labor ✔

6 Christopher Brozo Labor ✔

7 Agapito Banguel Specific Skilled - Mason ✔

8 Rizaldo Ramos Labor ✔


9 Starvie Balajadia Labor ✔
10 Joshua Joson Labor ✔

11 Amilito Legaspi Specific Skilled - Steelman ✔

12 Jericho De Guzman Labor ✔

13 Edwin Barja Labor ✔


14 Joshua Baltazar Labor ✔
15 Resty Valencia Labor ✔
16 Wilson Joson Labor ✔

17 Gregorio Santos Specific Skilled - Mason ✔


TEAM 2
18 Mark Villa Foreman ✔

19 Jay Carlo Abino Carpenter/ Steelman ✔

20 John Roel Abino Carpenter/ Steelman ✔

21 Jervy Abino Carpenter/ Steelman ✔

22 Gerry Valderama Carpenter/ Steelman ✔

23 Gener Fuentes Carpenter/ Steelman ✔

24 Renhzon Talavera Carpenter/ Steelman ✔

25 Melchor Villa Carpenter/ Steelman ✔

26 Jerry Montajes Carpenter/ Steelman ✔

27 Darwin Gonzaga Skilled ✔

28 John Carlo Angeles Labor ✔

29 Kevin Cudia ✔
Total Manpower: 26
WORK PERFORMED:
WBS %P Work Packages Description Location Remarks
Splicing of Column Main Bars for 3F & 2F
side
Concrete &
Reinforcement Installation of Column Ties for 3F Side
Fabrication of Beam Stirrups

EQUIPMENT USED:

Grinders, Cut-off machine


MATERIALS DELIVERED TO SITE:
Description Qty Unit BOQ Ref Location
None

ISSUES/ PROBLEMS/ INCIDENTS ENCOUNTERED:


WBS Work Packages Description Action Taken

CONSULTANTS’ COMMENTS:
Architect-of-Record / Allied
To be completed by the

Consultants

Consultant’s Authorized Person: Signature: Date:

VISITORS:
Name Position Company Purpose
Mark Jabat Sales Consultant Multi-Line Product demo

Documented By: Reviewed By: Concurred By:

Arch. Reynold De Leon Arch. Joramae Balbin Arch. Alvin Paul Dela Cruz
Site Architect Project Manager Contractor
Footnotes:
PO - Project Owner
AoR - Architect-of-Record
PM - Project Manager
CM - Construction Manager
SA/SE - Site Architect/Engineer

Additional Notes:
NOVEMBER 10, 2022 | THURSDAY
PHOTO DOCUMENTATION:

Splicing of Column Main Bar for 2F side- A3 respectively

Splicing of Column Main Bar for 3F side- B5 respectively


Splicing of Column Main Bar for 3F side- C3 respectively

Splicing of Column Main Bar for 3F side- D5 respectively


Splicing of Column Main Bar for 3F side- D3, E3 respectively
c
Pouring of concrete for perimeter fence tie beam
DAILY FIELD
POLYBUILD CONSTRUCTION SERVICES
INSPECTION /
+63 917-547-2388 / polybuild.ph@gmail.com PROGRESS REPORT
Architect-of-Record:
PROJECT TITLE: DVP Residence - Proposed Three-Storey Split Type Residence w/ Attic
Nana & Co Architecture
L2-3 B1 Waterwood Park Village, Brgy. Sto. Cristo & Concepcion, 11-11-2022
PROJECT SITE:
Baliuag, Bulacan
MM/DD/YYYYY
PROJECT OWNER: Angelo B. Polinario and Sophie Arianne C. Dela Victoria Su M T W TH F Sa

WEATHER: SUNNY (SU) FAIR (F) LIGHT RAIN (LR) RAINY (R) HEAVY R (HR) STORMY (S)
F
6 7 8 9 10 11 12 13 14 15 16 17 18 19

PO AoR PM CM SA/E
MANPOWER:
✔ ✔ ✔
Name Position Present Absent
1 Arnelito Igna Foreman ✔

2 Angelito Igna All Around Skilled ✔


3 Aris Gregorio Specific Skilled - Mason ✔
4 Roy Catactan Labor ✔

5 Manolito Abad Labor ✔

6 Christopher Brozo Labor ✔

7 Agapito Banguel Specific Skilled - Mason ✔

8 Rizaldo Ramos Labor ✔


9 Starvie Balajadia Labor ✔
10 Joshua Joson Labor ✔

11 Amilito Legaspi Specific Skilled - Steelman ✔

12 Jericho De Guzman Labor ✔

13 Edwin Barja Labor ✔

14 Joshua Baltazar Labor ✔


15 Resty Valencia Labor ✔
16 Wilson Joson Labor ✔

17 Gregorio Santos Specific Skilled - Mason ✔

TEAM 2
18 Mark Villa Foreman ✔
19 Jay Carlo Abino Carpenter/ Steelman ✔

20 John Roel Abino Carpenter/ Steelman ✔

21 Jervy Abino Carpenter/ Steelman ✔

22 Gerry Valderama Carpenter/ Steelman ✔

23 Gener Fuentes Carpenter/ Steelman ✔

24 Renhzon Talavera Carpenter/ Steelman ✔

25 Melchor Villa Carpenter/ Steelman ✔

26 Jerry Montajes Carpenter/ Steelman ✔

27 Darwin Gonzaga Skilled ✔

28 John Carlo Angeles Labor ✔

29 Kevin Cudia ✔
Total Manpower: 26
WORK PERFORMED:
WBS %P Work Packages Description Location Remarks
Splicing of Column Main Bars for 3F Side
Installation of Column Ties for 3F Side
Concrete &
Fabrication of Beam Stirrups
Reinforcement
Installation of Column Formworks for 3F side
Installation of Beam Rebars for Attic Side
EQUIPMENT USED:

Grinders, Cut-off machine


MATERIALS DELIVERED TO SITE:
Description Qty Unit BOQ Ref Location
NONE

ISSUES/ PROBLEMS/ INCIDENTS ENCOUNTERED:


WBS Work Packages Description Action Taken

CONSULTANTS’ COMMENTS:
Architect-of-Record / Allied
To be completed by the

Consultants

Consultant’s Authorized Person: Signature: Date:

VISITORS:
Name Position Company Purpose
BELINK/UNICRETE Submission of test result- compressive strength of
BELINK/UNICRTE
REPRESENTATIVE cylindrical concrete specimen.

Documented By: Reviewed By: Concurred By:

Arch. Reynold De Leon Arch. Joramae Balbin Arch. Alvin Paul Dela Cruz
Site Architect Project Manager Contractor
Footnotes:
PO - Project Owner
AoR - Architect-of-Record
PM - Project Manager
CM - Construction Manager
SA/SE - Site Architect/Engineer

Additional Notes:

Reynold De Leon- 30mins late


NOVEMBER 11, 2022 | FRIDAY
PHOTO DOCUMENTATION:

Installation of beam rebars for Attic Side- 4B16, 4B20 respectively

Installation of beam rebars for Attic Side- 4B19, 4B15 respectively


Installation of column (L4) formworks for GF side- F3

Installation of column (L4) formworks for GF side- F5


Installation of column L/4 formworks for GF side- D5, D5 PRIME respectively

Installation of Column formworks for 2F side - C3


Installation of Column formworks for 2F side - B3

Fabrication of beam formworks


DAILY FIELD
POLYBUILD CONSTRUCTION SERVICES
INSPECTION /
+63 917-547-2388 / polybuild.ph@gmail.com PROGRESS REPORT
Architect-of-Record:
PROJECT TITLE: DVP Residence - Proposed Three-Storey Split Type Residence w/ Attic
Nana & Co Architecture
L2-3 B1 Waterwood Park Village, Brgy. Sto. Cristo & Concepcion, 11-12-2022
PROJECT SITE:
Baliuag, Bulacan
MM/DD/YYYYY
PROJECT OWNER: Angelo B. Polinario and Sophie Arianne C. Dela Victoria Su M T W TH F Sa

WEATHER: SUNNY (SU) FAIR (F) LIGHT RAIN (LR) RAINY (R) HEAVY R (HR) STORMY (S)
S
6 7 8 9 10 11 12 13 14 15 16 17 18 19

PO AoR PM CM SA/E
MANPOWER:

Name Position Present Absent
1 Arnelito Igna Foreman ✔

2 Angelito Igna All Around Skilled ✔

3 Aris Gregorio Specific Skilled - Mason ✔


4 Roy Catactan Labor ✔

5 Manolito Abad Labor ✔

6 Christopher Brozo Labor ✔


7 Agapito Banguel Specific Skilled - Mason ✔

8 Rizaldo Ramos Labor ✔


9 Starvie Balajadia Labor ✔
10 Joshua Joson Labor ✔

11 Amilito Legaspi Specific Skilled - Steelman ✔

12 Jericho De Guzman Labor ✔

13 Edwin Barja Labor ✔

14 Joshua Baltazar Labor ✔


15 Resty Valencia Labor ✔
16 Wilson Joson Labor ✔

17 Gregorio Santos Specific Skilled - Mason ✔

TEAM 2
18 Mark Villa Foreman ✔

19 Jay Carlo Abino Carpenter/ Steelman ✔

20 John Roel Abino Carpenter/ Steelman ✔


21 Jervy Abino Carpenter/ Steelman ✔

22 Gerry Valderama Carpenter/ Steelman ✔

23 Gener Fuentes Carpenter/ Steelman ✔

24 Renhzon Talavera Carpenter/ Steelman ✔

25 Melchor Villa Carpenter/ Steelman ✔

26 Jerry Montajes Carpenter/ Steelman ✔


27 Darwin Gonzaga Skilled ✔

28 John Carlo Angeles Labor ✔

29 Kevin Cudia ✔
Total Manpower: 25
WORK PERFORMED:
WBS %P Work Packages Description Location Remarks
Installation of Beam Runners 4F
Concrete & Installation of Column Ties for 3F Side 3F
Reinforcement Installation of Column Formworks for 3F side 3F
Installation of Beam Rebars for Attic Side 4F
EQUIPMENT USED:

Grinders, Cut-off machine


MATERIALS DELIVERED TO SITE:
Description Qty Unit BOQ Ref Location
NONE

ISSUES/ PROBLEMS/ INCIDENTS ENCOUNTERED:


WBS Work Packages Description Action Taken

VISITORS:
Name Position Company Purpose

Documented By: Reviewed By: Concurred By:

Arch. Reynold De Leon Arch. Joramae Balbin Arch. Alvin Paul Dela Cruz
Site Architect Project Manager Contractor
Footnotes:
PO - Project Owner
AoR - Architect-of-Record
PM - Project Manager
CM - Construction Manager
SA/SE - Site Architect/Engineer

Additional Notes:

NOVEMBER 12, 2022 | SATURDAY


PHOTO DOCUMENTATION:
4B01 no runners, no steel

4B02 no runners, no steel

4B02 no runners, no steel


4B03 beam runners & beam rebar

4B04 beam runners, no steel

4B05 beam runners, no steel


4B06 beam runners & rebar

4B07 beam runners & rebar

4B08 beam runners, no steel

4B09 beam runners & rebar


4B10 beam runners & rebar

4B10 beam runners & rebar

4B12 beam runners & rebar

4B13 beam runners & rebar


4B14 beam runners & rebar

4B15 beam runners & rebar

4B16 beam runners & rebar


4B17 beam formworks & rebar

4B18 cantilever beam runners & rebar

4B19 beam runners & rebar


4B20 beam runners & rebar

4B21 beam runners & rebar

4B22 beam runners & rebar


4B23 beam runners & rebar

4B24 beam runners & rebar

4B25, 4B26, 4B27 beam runners, no rebar


Pouring of Column for 2F side- A3

Pouring of Column for 3F side- B3


Installation of column formworks for 3F side- C3

Installation of column formworks for 3F side- C3


Installation of column formworks for 3F side- D3

Installation of column formworks for 3F side- E3


Installation of column formworks for 3F side- F3

Provision for Electrical Pipe Chase