Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

NOZZLE SCHEDULE

3
A 4" N.P.T. W.F. C.S. STD. STD.
B 2" N.P.T. W.F. C.S. STD. STD.
C 3" N.P.T. W.F. C.S. STD. STD. PRIMARY EMERGENCY VENT

B
2"
B
2"
C
3"
B
2"
B
2"
3
4"
250 GAL.

PLAN

SMALL LIFTING LUG

B B C B B FULL LENGTH
2" 2" 3" 2" 2" ANGLE (TYP)
FULL LENGTH B
ANGLE (TYP) 2"
A
3
4"
2" COUPLING TO
RECEIVE 2" THREADED TANK DRAIN
PIPE (TYP.)
2" COUPLING TO
RECEIVE 2" THREADED
PIPE (TYP.)

LEFT SIDE FRONT VIEW RIGHT SIDE

NOTES: APPROVAL FOR CONSTRUCTION


SCHEDULE A - MASTER TERMS &
A. Quantity: One CONDITIONS OF SALE*
B. Material: H.R. Carbon Steel.
C. Design & Operating Pressure: Atmospheric.
D. Design & Operating Temperature: Ambient.
E. Tank to be built & labeled per U.L. spec. #142. *All pages of this Schedule A are
F. Tank to be air tested with water & soap suds solution.
250 GALLON, 32" DIA. x 72" LONG x 12 GA.,
incorporated by reference and are a part of
G. Interior: Remove weld slag, ship clean & dry. the additional terms of the Master Terms & ABOVE GROUND, SINGLE WALL TANK
H. Exterior: Brushblast & apply red oxide primer. Conditions of Sale.
I. All fittings to be protected for shipment.
-
www.newberrytanks.com/masterterms.pdf
J. Customer has the responsibility to verify all dimensions. 12/17/2020 1 NB00250SSP03212G
2" = 1'-0"

You might also like