height shall be considered as working at height. Ensure all personnel assigned to work at height are not afraid of height and medically fit for height works. Work shall not be allowed to be carried out standing over wooden boxes; empty barrels and other make shift arrangements. In case of any practical difficulties to provide proper working platform, safety harness with fall arrestors (self inertia reels) shall be installed and used. Temporary edge protection with top hand rails at a height of 1.1mand mid rail at a height of 0.55 m and with toe board shall be installed in all around the openings in floor slabs. For small openings floor co Any person working above 2m height shall be considered as working at height. Ensure all personnel assigned to work at height are not afraid of height and medically fit for height works. Work shall not be allowed to be carried out standing over wooden boxes; empty barrels and other make shift arrangements. In case of any practical difficulties to provide proper working platform, safety harness with fall arrestors (self inertia reels) shall be installed and used. Temporary edge protection with top hand rails at a height of 1.1mand mid rail at a height of 0.55 m and with toe board shall be installed in all around the openings in floor slabs. For small openings floor co STEP HAZARD CONTROL MEASURES REMARKS *Unloading of *Rig may get skid from * Provide firm ramp for unloading the hydraulic rig. rotary rig with truck * Ensure signal man for proper communication with accessory *Materials may hit the operator. from truck workmen * Proper supervision shall be taken. *Finger may get injured * Proper rigging of materials and use of guy roper. while handling wire * Valid work permit. ropes. * Proper use of PPE. * Before start * Underground utilities. * Check and ensure underground utilities are present of piling * Overhead utilities. in the drilling area. * Check and Keep distance from above ground utilities. * Proper Supervision to be done. * Valid work permit to be taken. * Marching * Rig may get if * Ensure soil is compacted. and marching on loose soil * Make sure that underground utilities are de positioning of electrocution. energized and out of danger. rotary piling * Toppling of rig due to * Ensure levelled and consolidated surface before rig uneven surface Marching. * Banks man should deploy. Name Signature Date Prepared By