RANJIT BUILDCON LIMITED

GUJARAT METRO RAIL PROJECT PHASE 2, C2

RANJIT BUILDCON LIMITED

JOB SAFETY ANALYSIS


PROJECT OPERATIONAL
CAMP JOB SAFETY ANALYSIS
ACTIVITY: - Bored Piling DATE: 08. 04. 2021

Any person working above 2m


height shall be
considered as working at height.
 Ensure all personnel assigned to
work at height are
not afraid of height and medically
fit for height
works.
 Work shall not be allowed to be
carried out
standing over wooden boxes; empty
barrels and
other make shift arrangements.
 In case of any practical
difficulties to provide
proper working platform, safety
harness with fall
arrestors (self inertia reels) shall be
installed and
used.
 Temporary edge protection with
top hand rails at a
height of 1.1mand mid rail at a
height of 0.55 m
and with toe board shall be installed
in all around
the openings in floor slabs.
 For small openings floor co
Any person working above 2m
height shall be
considered as working at height.
 Ensure all personnel assigned to
work at height are
not afraid of height and medically
fit for height
works.
 Work shall not be allowed to be
carried out
standing over wooden boxes; empty
barrels and
other make shift arrangements.
 In case of any practical
difficulties to provide
proper working platform, safety
harness with fall
arrestors (self inertia reels) shall be
installed and
used.
 Temporary edge protection with
top hand rails at a
height of 1.1mand mid rail at a
height of 0.55 m
and with toe board shall be installed
in all around
the openings in floor slabs.
 For small openings floor co
STEP HAZARD CONTROL MEASURES REMARKS
*Unloading of *Rig may get skid from * Provide firm ramp for unloading the hydraulic rig.
rotary rig with truck * Ensure signal man for proper communication with
accessory *Materials may hit the operator.
from truck workmen * Proper supervision shall be taken.
*Finger may get injured * Proper rigging of materials and use of guy roper.
while handling wire * Valid work permit.
ropes. * Proper use of PPE.
* Before start * Underground utilities. * Check and ensure underground utilities are present
of piling * Overhead utilities. in the drilling area.
* Check and Keep distance from above ground
utilities.
* Proper Supervision to be done.
* Valid work permit to be taken.
* Marching * Rig may get if * Ensure soil is compacted.
and marching on loose soil * Make sure that underground utilities are de
positioning of electrocution. energized and out of danger.
rotary piling * Toppling of rig due to * Ensure levelled and consolidated surface before
rig uneven surface Marching.
* Banks man should deploy.
Name Signature Date