1) The work order report details repairs to security lighting at the POS SWRO marketing post.
2) The repairs included troubleshooting a short circuit in the switch, replacing faulty light fittings, and replacing 4 LED lamps.
3) The work was completed on November 28, 2018 by a site manager, site supervisor, electrical technician, and helper using a toolset, ladder, and replacing 4 7-watt LED lamps and fittings.
1) The work order report details repairs to security lighting at the POS SWRO marketing post.
2) The repairs included troubleshooting a short circuit in the switch, replacing faulty light fittings, and replacing 4 LED lamps.
3) The work was completed on November 28, 2018 by a site manager, site supervisor, electrical technician, and helper using a toolset, ladder, and replacing 4 7-watt LED lamps and fittings.
1) The work order report details repairs to security lighting at the POS SWRO marketing post.
2) The repairs included troubleshooting a short circuit in the switch, replacing faulty light fittings, and replacing 4 LED lamps.
3) The work was completed on November 28, 2018 by a site manager, site supervisor, electrical technician, and helper using a toolset, ladder, and replacing 4 7-watt LED lamps and fittings.
JAVA INTEGRATED INDUSTRIAL & PORTS ESTATE WORK ORDER REPORT PROJECT NAME : Perbaikan lampu pos securty marketing PREPARED BY : Pradityo JWU WORK DATE : 28 November 2018 CHECKED BY : M. Haris REVIEWED BY : Deny Setyawan APPROVED BY : Mahendra Singh NUMBER OF PERSONAL MAJOR EQUIPMENT / TOOLS Position Quantity No Materials Quantity No Tools Quantity Site Manager 1 Lampu 7 watt LED 4 1 Toolset 1 Site Supervisor 1 2 fiiting lampu 1 2 Tangga 1 Teknisi Mechanical Teknisi Electrical 1 Helper Target Date Actoal Location Work Order Activities Status Remaks Date Date