Professional Documents
Culture Documents
Settle CC Batch
Settle CC Batch
1- Log in to EMC
2- Select Location
3- Click on Edit Batch to check for any batches that were created but not settled. Click Select on
the batch line
4- Click on Select (if batch was already created continue on step 14) If batch is not there (was not
created) continue with step 5
5- Click on Create Report (to look for the last batch created)
6- Create Report
7- Select SAVED BATCHES
9- Always look for the date from the previous date. For example the information for the 21st will
show on the batch with date for the 22nd
10- Click Create CC Batch if the date needed doesn’t show in the report
11- Select Yesterday