DCRP WRITTEN TEST QUESTIONS

1. 11KV CT DETAILS OF PROTECTION AND METERING CORES (5 PTS)


2. 11KV PT DETAILS OF PROTECTION AND METERING CORES (5 PTS)
3. POLARITY TEST PROCEDURE & RESULT FOR CT (5 PTS)
4. COMPSITE ERROR IN CT (5 PTS)
5. PURPOSE OF TERMINAL BLOCK, DC SUPERVISION RELAY, AC SUPERVISION RELAY, SWITCH, LINKS,
RELAY OUTPUTS (6 PTS)
6. SEQUENCE OF OPERATION OF AUTO RECLOSURE SYSTEM. (5PTS)
7. WORKING PRINCIPLE OF TRIP CIRCUIT SUPERVISION CIRCUIT (4 PTS)
8. OC RELAY IDMT, DMT CHARACTERISTICS CURVE WITH TIMING FORMULA (10 PTS)
9. OC& EF RELAY (20 PTS)
I. FOR GIVEN SECONDARY CURRENT, CORRESPONDING PRIMARY CURRENT SHOULD BE
CALCULATED IN RELAY
II. TIME CALCULATION FOR NORMAL INVERSE CURVE FOR 2 TIMES FAULT FOR OC AND 5
TIMES FAULT FOR EF
10. RELAY SETTING INPUT DETAILS FOR 51/50/50N (5 PTS)

TOTAL POINTS: 70