TP DIVISION- TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT


NAME OF SUB STATION: 132/11kV CITYWALK SUBSTATION
CONTRACT NO:

Main Contractor CENTAUR Name of Bay: KHAZAN FEEDER,E03


Consultant: ---- Equipment: 132kV VOTAGE TRANSFORMER Page 1 of 3
Manufacturer SCADA No: C1070 DATE

INSPECTION AND TESTING OF PHASE VOLTAGE TRANSFORMER

1. CHARACTERISTICS
MAKE: TRENCH
TYPE:
SERIAL NO.
NO. OF CORES 2  

Core 1 Core 2
Pry 132kV/√3 132kV/√3
Ratio
Sec 110V/√3 110V/√3
Class 0.5/3P 0.5/3P
Burden (VA) 100VA 30VA
Rated Voltage 145kV 145kV
R 1c-1cn 2c-2cn
VT Ter.
Y 1a-1an 2a-2an
No.
B 1b-1bn 2b-2bn
VT R XEW1-1 XEW2-1
Terminal Y XEW1-3 XEW2-4
Block B XEW1-5 XEW2-7
No. N XEW1-7,8,9 XEW2-10,11,12
Purpose M1FP & M2FP DFR,BCU & BVS

2. MECHANICAL AND ELECTRICAL CHECKS

   R Phase Y Phase B Phase


GENERAL VISUAL INSPECTION OK OK OK
NAME PLATE OK OK OK
TIGHTNESS OF CONNECTIONS AT VT SEC. TERMINALS OK OK OK
TIGHTNESS OF CONNECTIONS AT VT SEC. TERMINAL BLOCKS
OK OK OK
(LV COMPARTMENT)
EARTHING OF PRIMARY NEUTRAL TERMINAL OK OK OK
SECONDARY EARTHING CORE 1 & 2 OK OK OK
CONFIRMATION OF RATING OF FUSES IN VT TERMINAL BOX
NA NA NA
AS SPECIFIED IN DRAWING

DEWA/TP/TCD/132 kV/P31/VT. Rev.3.


TP DIVISION- TRANSMISSION COMMISSIONING DEPARTMENT
SITE TEST REPORT
NAME OF SUB STATION: 132/11kV CITYWALK SUBSTATION
CONTRACT NO:

Main Contractor CENTAUR Name of Bay: KHAZAN FEEDER,E03


Consultant: ---- Equipment: 132kV VOTAGE TRANSFORMER Page 2 of 3
Manufacturer SCADA No: C1070 DATE

INSPECTION AND TESTING OF PHASE VOLTAGE TRANSFORMER


3. INSULATION RESISTANCE MEASUREMENT.
a. Confirm Isolation of links of VT Terminal Blocks.
b. Confirm isolation Primary neutral earthing link
c. IR Values to be measured up to VT Terminal Blocks.

Ambient Temperature 30.7 ℃ Humidity: 40.6 %


DC
  Voltage R Phase Y Phase B Phase
Applied
Primary to Earth 2.5kV GΩ
Primary to Sec. Core 1 2.5kV
Primary to Sec. Core 2 2.5kV
Sec. Core 1 to Earth 1000V
Sec. Core 2 to Earth 1000V
Sec. Core 1 to Core 2 1000V

4. POLARITY CHECKS.
  R PHASE Y Phase B Phase
At VT Sec. At LCC At VT Sec. At LCC At VT Sec. At LCC
VT
Terminals Ter. Blocks Terminals Ter. Blocks Terminals Ter. Blocks
Pry. to Core 1
Pry. to Core 2

5. WINDING RESISTANCE MEASUREMENT.


Ambient Temperature - t 30.8 0C
CORE R Phase Y Phase B Phase

  R at t0C R at 750C R at t0C R at 750C R at t0C R at 750C

Primary in (kΩ)
Sec. CORE 1 in (mΩ)
Sec. CORE 2 in (mΩ)

Resistance at 750C = Rt (1+0.00393(75–t))

6. MAGNETIZING CURRENT MEASUREMENT.

DEWA/TP/TCD/132 kV/P31/VT. Rev.3.


TP DIVISION- TRANSMISSION COMMISSIONING DEPARTMENT
SITE TEST REPORT
NAME OF SUB STATION: 132/11kV CITYWALK SUBSTATION
CONTRACT NO:

Main Contractor CENTAUR Name of Bay: KHAZAN FEEDER,E03


Consultant: ---- Equipment: 132kV VOTAGE TRANSFORMER Page 3 of 3
Manufacturer SCADA No: C1070 DATE

INSPECTION AND TESTING OF PHASE VOLTAGE TRANSFORMER


R-N Y-N B-N

 Primary voltage applied in (V)

Primary current measured in (µA)

7. RATIO TEST.
R Phase Y Phase B Phase
CORE

Error Error Error


Pri-Volts Sec-Volts Pri-Volts Sec-Volts Pri-Volts Sec-Volts
(%) (%) (%)

Core 1

Core 2

TESTING INSTRUMENT DETAILS


PARTICULARS MAKE TYPE SR.NO. CAL. DUE DATE
IR TESTER MEGGER
MULTIMETER FLUKE
MULTIMETER FLUKE
MULTIMETER FLUKE
MICRO OHM METER MEGGER
TEMPERATYRE/HUMIDITY
FLUKE
METER
- - - - -

Tested By Witnessed / Verified By Witnessed / Verified By

Signature

Name PATRIS.J
Organization CENTAUR NA DEWA

DEWA/TP/TCD/132 kV/P31/VT. Rev.3.