Batliboi Environmental
Engineering Limited
TT
M/s. MUKAND LIMITED AP-73, ‘AF’ Block, 2nd St., 11th Main Road,
Ginegera Steel Plant Division, Anna Nagar, Chennai - 600 040, India.
Phone : +91(44) 2620 2434
Fax: 491(44) 2628 0434
E-mail : beel.mds@batliboi.com
Web. wwbatlboi.com
Our Ref. No. : BEEL / 11241/ 001. Date.: 16.12.2013
Kind Attn, : Mr. PACHAR (DGM)
Your Ref. P.O. No. :-PUR / FCS /BAGHOUSE/ 10501 Dated 11.06.2011 & AMENDMENT —
1 DATED 18.02.2012
SUB.: Completion of Hot commissioning of Secondary FES and Primary Fume Cleaning
Systems - LRF
Respected Sir,
With reference to your above Purchase Order, we had been completed the hot commissioning of
Secondary FES and Primary Fume Cleaning Systems — LRF which has supplied by our self. The
equipments were commissioned and put in operation from 06/03/2013. The performance of all
the Equipments & Instruments were conducted and working as per the requirement as well as the
Design Parameter,
We are thankful to you for your great Co-operation in the time of Hot Commissioning,
‘Thanking you.
t
Yours faithfully, foo af
ysl 8) ft 7
For, Batljboi Environmental Engineering Limited. gs S geen
9 poly LAPT got!
S.Krishnakumar H ok Cal /
(Asst. Manager ~ Sales & Service)
OW
Regd. & Corp. Office : Batiiboi House, Govandi(W), Mumbai-400 043, INDIA. Ph :2558 3031, 2558 7421, 2557 3918 Fax : 25566049Batliboi Environmental
Engineering Limited
HOT COMMISSIONING PROTOCOL ( EQUIPMENT )-
CLIENT : WS. MUKAND LIMITED (GINEGERA PLANT, DIST. KOPPAL) DATE: o6105/2013,
JPONTRACT NO.; PUR/FCS ]eAGHOUSE/10501 Dated 11.06.2011 & AMENDMENT -+ DATED 12.02,2012
PROJECT : SECONDARY FES & PRIMARY FUME CLEANING SYSTEMS - LRF
JJ0 No. : 11281
Equipment. : ID Fan ( Capacity,
60000 M?/ Hr @ 390 mm WG At 100 °C).
| | i
Note. Bag Filter Inlet & Outlet Damper 100% Open.
: T [sor Gurent Dati Tearing Tom. | St pr | Votan] Amo
wo] Eaiiment ag] Oamper Opening 6) | amis | Brawn Curent |") |¢mmus) | emmy | mee
| | " Inlet [Outlet | (amps) Amps ) DE [NDE | Actual ‘Actual i (ec)
1 | IDFan-1 100 100 420 408 | 52 | 63 420 I 169752 | 35
1D Fan vibration measurement @ 1450RPM ‘AT 4200 RPM
[ FANNDE | FANDE | moToR | FAN NDE [FAN DE| MOTOR
mm/s [mm/s | mys smm/s_| mm/s | mm/s
|HoRIZonTAL 16 26 | 43 [ “a6 [2a | 27 |
veRTICAL 17 14 | 10 17 [11] 19
[AXIAL 1s | a7 1s | (as [as] 12 |
Equipment. ; Rotary Air Lock
[x=] Eaviomene [Mote HP 7] Drawn Curent Amps)
+ | Rav~a oo | 09 | 09
| 2 | rav—2 oo | os | 09
af rav-3 [10/1405] 1.75 fos bop 09
+ | Rava os | oo | 09
“5 | Rav-5 | [oo | 09 | 09 |
S| silorav j1.0/1405| 175 | 09 | 09 | 09
Equipment. : Screw Conveyor
. Motor FLC Drawn Current ( Amps)
Sere. Faupment pliaen (anes) mmm curent Ap
srevor 00/1450 298 108 i97 10.8
conveyor
ba of 4. Vos
F/s, Makan vidkitéa M/s. Batliboi Environmental Engineering LimitedBatliboi Environmental
Engineering Limited
RT
COMMISSIONING PROTOCOL ( INSTRUMENT )
BATET OC/S5 [07% |
(CLIENT : M/S. MUKAND LIMITED (GINEGERA PLANT, DIST. KOPPAL) |
CONTRACT No. : PUR / FCS /BAGHOUSE/ 10501 Dated 11.06.2041 & AMENDMENT - 1 DATED 18.02.2012
I
PROJECT : SECONDARY FES & PRIMARY FUME CLEANING SYSTEMS - LRF
|
JOB No. : 11241
_——
instrament, : SlaveTimer (20 Channel) |
‘SetPoint.
sr.No.| TagNo. |” ontime | off time |
| (mi.sec). | (Sec). |
1 30 4
2 30 4
(cs 30 4
4 30 14 |
Instrument. : Master Cont
Timer
SetPoint.
sett | agrine | S809 | wat Tine
Sec). cc). |
(see) | (sec). | CS» |
1 5 5 5
ressure Switch
Set Point |
KG. 1 Sa. Cm
pata
|M/s. Muleand LimbedPERFORMANCE TEST OF FES SYSTEM HELD BY M/S. BATLIBOI
ENVIRONMENT ENGINEERING LIMITED CHENNAI, ON 08.02.2013 &
09.02.2013 AT LRF MUKUMD SITE.
FAN DATA:
Capacity
Fan Model
Drawing Number
Total Pressure
Gas Temperature
Fan Speed
Fan inlet duct size
A.FAN SPEED AT 1170RPM
Measured Values
Suction Pressure at inlet
AP
Motor Current
Damper Opening
Gas Temperature
Volume Flow (Q)
Cp
A
ap
Volume Flow (Q)
16000 0 m*/hr
HRVS63-1960K
BEEL-4938-01-R3
360 mmwe
100°C
1440 rpm
2200mm x 1100mm
=390 mmwe
=5 mmwe
=245 Amps
=100%
=40 Deg C
= [Cp x A xv(2xgxApxy) )/y
= 0.98 (Pitot tube Constant)
= Area of the fan inlet duct
= 2.42 m?
=5 mmuwc (measured by Pitot tube using manometer}
= Gas density (¥ = 273 erg
=1.127 Kg/m?
= (0.98X2.42XV(2x9.81x5x1,127) )/1.127
=22.126 m*/sec
=79655 m*/hr. 4 :
55 m*/hr. eeB.FAN SPEED AT 1300RPM
Measured Values
Suction Pressure at inlet
AP
Motor Current
iB
Gas Temperature
Volume Flow (Q)
Cp
A
AP
Volume Flow (Q)
C.FAN SPEED AT 1450RPM
Measured Values
Suction Pressure at inlet
ap
Motor Current
Damper Opening
Gas Temperature
wid
=350 mmwe
=12 mmwe
=316Amps
=100%
=37Deg C
= (Cp x A xv(2xgxApxy) )/y
= 0.98 (Pitot tube Constant)
= Area of the fan inlet duct
= 2.42 m*
=12 mmwc (measured by Pitot tube using manometer)
= Gas density (¥ = (27341.293)/(273 41° c)
=1.138 kg/m?
= (0.98X2.42Xv(2x9.81x12x1.138) )/1.138
=34.11 m’/sec
=122804 m?/hr.
=420 mmwe
=21.75 mmwe (20,20,21,26}
=408Amps
=100%
=35DegCVolume Flow (Q) = (Cp x Axv(2xgxApxy) Y/y
cp = 0.98 (Pitot tube Constant)
A = Area of the fan inlet duct
= 2.42 m?
AP =21.75mmwe (measured by Pitot tube using
manometer)
y = Gas density (¥ = ( 273 s7°C)
=1.146 Ke/m?
Volume Flow (Q) =
(0.98X2.42XV(2x9.81x21.75x1.146) )/1.146
=45.76 m°/sec
=164752 m3/hr.