Document Title : Inspection and Test Plan - SAWH-Spiral Welded Pile Production
Document No : ERC-ITP-22-11-1
Project Name -
Oil or Gas
Prod.
Onshore Offshore Sour Water Pilling
Form
Pipe Type Service Service Service
- - - - X CFCHS
Quantity -
Length Quantity ID OD
Item Size (mm) Steel Grade Tolerance
(m) (PCS) Coating Coating
(m)
Scope
1800,0
1 Ø610 x 25,0 S355JR 30,0 60,0 Bare Bare
±0,6%
Standard Annexes -
Coating
BARE
Standards or Specs
Lining
BARE
Standards or Specs
ABREVIATION LIST:
Incoming
Mechanical, chemical, dimensional
Mechanical, chemical, dimensional Inspection Quality,
1.1 HRC Order properties shall be acc. to Incoming Each coil Purchase H R
properties, Procedure Purchasing
Inspection Procedure. order
TA-016
Each coil,
Heat basis Incoming
Damage, Marking, Mechanical, Incoming
HRC Receipt & Visual inspection Quality, (mechanical Ins.
1.3 Chemical properties, Ins. Report H R
Storage Supplier material certificate 2.2 or 3.1. Planning and Report
Dimensional control & Coil list
chemical & Coil list
tests)
Legend : R : Document Review; W : Witness point; I : Inspection Points; T : Test Points ; H : Mandatory Hold Point for Inspection / Test, M : Monitoring
Erciyas QA / QC TPI Representative Client
Name :
Date / Signature
ITP-001-R0
Date 24.02.2022
INSPECTION AND TEST PLAN - PILING PROJECT
Rev 0
Document No ERC-ITP-22-11-1 PILE PRODUCTION Page No 5 / 12
Method of
Sampling
Description of Inspection /Test Acceptance Criteria Controlling Performed Quality Verification
NO size/type
Activity Requirements Checking Method Document By frequency Record Erciyas Client
Production
2.5 Forming Visual and dimension control Checking of OD Production Each Pipe N.A. H -
Plan
Accepted Coil
3.1 In feed coil Heat & coil number control Identification control Production Each Coil N.A. H -
List
Accepted
Welding consumable Each heat /
3.2 Heat / batch number control Identification control Welding Production N.A. H -
use Batch
consumables
Butt welds, used to join lengths of strip/plate
together in the spiral submerged arc weld
process, shall be permitted, provided that the Spec. 1 Shift
3.3 Skelp-end-weld Welding parameters control Production Each pipe H R
butt weld is tested to the same type of item 9.4.3 Report
procedure and meets the same acceptance level
as the main weld seam.
After any
Visual check for machining quality, Production Shift
3.4 Edge Milling WPS Parameter control Production change of H R
bevel angle & root face plan Report
beveling tools
Production
3.5 Forming Visual and dimension control Checking of OD Production Each Pipe N.A. H -
Plan
Amp, voltage, speed, shall be within
the ranges of the specified parameters in WPS First pipe of
production. Shift Report,
according to EN 15609 or ASME Sec. IX
Inside and Outside Quality Continuously Mechanical
3.6 Welding parameters control PQR, Mechanical tests (tensile, bending, charpy, WPS&PQR H R
Automatic SAWH Production from dials on Test
hardness 350 HV10) conducted after welding. the welding Reports
PQR shall be according to EN 15614 or ASME equipment
Sec. IX.
Legend : R : Document Review; W : Witness point; I : Inspection Points; T : Test Points ; H : Mandatory Hold Point for Inspection / Test, M : Monitoring
Erciyas QA / QC TPI Representative Client
Name :
Date / Signature
ITP-001-R0
Date 24.02.2022
INSPECTION AND TEST PLAN - PILING PROJECT
Rev 0
Document No ERC-ITP-22-11-1 PILE PRODUCTION Page No 7 / 12
Method of
Sampling
Description of Inspection /Test Acceptance Criteria Controlling Performed Quality Verification
NO size/type
Activity Requirements Checking Method Document By frequency Record Erciyas Client
Legend : R : Document Review; W : Witness point; I : Inspection Points; T : Test Points ; H : Mandatory Hold Point for Inspection / Test, M : Monitoring
Erciyas QA / QC TPI Representative Client
Name :
Date / Signature
ITP-001-R0
Date 24.02.2022
INSPECTION AND TEST PLAN - PILING PROJECT
Rev 0
Document No ERC-ITP-22-11-1 PILE PRODUCTION Page No 8 / 12
Method of
Sampling
Description of Inspection /Test Acceptance Criteria Controlling Performed Quality Verification
NO size/type
Activity Requirements Checking Method Document By frequency Record Erciyas Client
Lot test samples shall be cut as a ring from the Laboratory Quality, Acc. to this Laboratory
8.1 Sampling Sample geometry control H R
pipe. Records Production ITP Records
Legend : R : Document Review; W : Witness point; I : Inspection Points; T : Test Points ; H : Mandatory Hold Point for Inspection / Test, M : Monitoring
Erciyas QA / QC TPI Representative Client
Name :
Date / Signature
ITP-001-R0
Date 24.02.2022
INSPECTION AND TEST PLAN - PILING PROJECT
Rev 0
Document No ERC-ITP-22-11-1 PILE PRODUCTION Page No 9 / 12
Method of
Sampling
Description of Inspection /Test Acceptance Criteria Controlling Performed Quality Verification
NO size/type
Activity Requirements Checking Method Document By frequency Record Erciyas Client
- Ur Max.; % 2
Visual and Dimensional dmax−dmin Spec.2 Shift
10.2 Out of roundness Pipe End Ur= Quality Each Pipe H R
Inspection dnom Table 2 report
Legend : R : Document Review; W : Witness point; I : Inspection Points; T : Test Points ; H : Mandatory Hold Point for Inspection / Test, M : Monitoring
Erciyas QA / QC TPI Representative Client
Name :
Date / Signature
ITP-001-R0
Date 24.02.2022
INSPECTION AND TEST PLAN - PILING PROJECT
Rev 0
Document No ERC-ITP-22-11-1 PILE PRODUCTION Page No 10 / 12
Method of
Sampling
Description of Inspection /Test Acceptance Criteria Controlling Performed Quality Verification
NO size/type
Activity Requirements Checking Method Document By frequency Record Erciyas Client
Legend : R : Document Review; W : Witness point; I : Inspection Points; T : Test Points ; H : Mandatory Hold Point for Inspection / Test, M : Monitoring
Erciyas QA / QC TPI Representative Client
Name :
Date / Signature
ITP-001-R0
Date 24.02.2022
INSPECTION AND TEST PLAN - PILING PROJECT
Rev 0
Document No ERC-ITP-22-11-1 PILE PRODUCTION Page No 11 / 12
Method of
Sampling
Description of Inspection /Test Acceptance Criteria Controlling Performed Quality Verification
NO size/type
Activity Requirements Checking Method Document By frequency Record Erciyas Client
12.2 Marking Outside marking ERCIYAS name marks at the middle of pipe. - PRD/QAC Each Pipe N.A. H -
13.0 Documents
Legend : R : Document Review; W : Witness point; I : Inspection Points; T : Test Points ; H : Mandatory Hold Point for Inspection / Test, M : Monitoring
Erciyas QA / QC TPI Representative Client
Name :
Date / Signature
ITP-001-R0
Date 24.02.2022
INSPECTION AND TEST PLAN - PILING PROJECT
Rev 0
Document No ERC-ITP-22-11-1 PILE PRODUCTION Page No 12 / 12
Method of
Sampling
Description of Inspection /Test Acceptance Criteria Controlling Performed Quality Verification
NO size/type
Activity Requirements Checking Method Document By frequency Record Erciyas Client
Legend : R : Document Review; W : Witness point; I : Inspection Points; T : Test Points ; H : Mandatory Hold Point for Inspection / Test, M : Monitoring
Erciyas QA / QC TPI Representative Client
Name :
Date / Signature