RMC Plant Calibration 18 Sept. 2021
RMC Plant Calibration 18 Sept. 2021
Authority's Engineer Marc Technocrats Pvt Ltd.- Almondz Global Infra Ltd. (JV)
2 20 20 20 20.00 0.000
3 40 40 40 40.00 0.000
4 60 60 60 60.00 0.000
Average = -0.20
Authority's Engineer Marc Technocrats Pvt Ltd.- Almondz Global Infra Ltd. (JV)
1 0 0 0 0.00 0.000
2 20 20 20 20.00 0.000
3 40 40 40 40.00 0.000
Permissible Error As per
MoRT&H Section 1700 = +/-
3%
4 60 60 59.5 59.75 -0.417
Average = -0.31
Authority's Engineer Marc Technocrats Pvt Ltd.- Almondz Global Infra Ltd. (JV)
Addmixture
Plant Name : Schwing Stetter CP-30 Date of calibration : 18/09/2021
1 0 0 0 0 0.000
Average = 0.27