Professional Documents
Culture Documents
Alternative Bom
Alternative Bom
Alternative Bom
how does alternative bom works in bom,how to use suppose i made 1 raw
material ,1 semi finish material and 1 finish material and made a bom.
Thanks
Dear Sadanand,
1.When you create a BOM for any material for any BOM usage the first
alternative BOM will be created
that is 01.
2.Suppose if the same product can be produced using 2 different BOM's then you
can create 2 BOM's
3.This 2 alternative BOM's can be created for a different validity dates or lot sizes
and it can be
4.Always the first alternative BOM will be picked by the system during MRP run if
they have same
5.In some case one BOM will be used for inhouse production and the other one
for sub-contracting
purpose.
then you create a bom with all component same with black color and other
alternate bom will have grey color.
then you will create a production version 1 with black color bom and production
version 2 with greay color bom.
Can you pls tell me for which material you create BOM & which material used as
BOM component.
Suppose if you created BOM for FG material with raw material as component,this
is called alternative BOM 1
Then you need to create production version to decide which alternative BOM you
required.
Raja.
If we plan to create two parts, and setup it in BOM as alternative parts.How SAP
do the backflush or run requirements for it? Will it consume each parts qty?
Pradeep
Could you tell where we could setup this alternative group and strategy ?
Do you mean for mrp running, it will consdier the usage of alternateive
matieral,then create plan order according to the requriements, for backflush, It
will ignore the usage? so which part will be consumed?
THanks
Former Member
Jun 13, 2008 at 05:37 AM
Hi Alice.
Goto Header material (C) BOM in change mode (CS02) and select the item A ->
goto item Over view -> Assign some value for Alternate group & select the
"alternateGroup" field-> set priority =1 , Strategy=1 (according to usage), Usage
probability 30% .
Repeat the Above steps for item B with priority =2 , Strategy=1, usage probability
= 70% and Save .Now run the MRP and create production order check with
requirement quantity system will work as u need.
Our situation is B part will replace A part in future. So if we setup bom like that ,A
parts still will have new requirements , Like po ...?
What we hope is when A parts have been used up , system will automatically
trigger out prodction order to use B part or when we use backflush, it also could
consume B parts?
Thanks
Thanks a lot , We will setup follow-up matieral in material master. But question
is , from the valid date, mrp will calculate the dependent requirments on matieral
B instead of A , but Could the system automatically trigger out the mateiral to B
for producction order or backflush accroding to BOM?
If we set both follow-up mateiral and alternative mateiral in BOM, like A proirity
as 1 B as 2 first. when A parts is used up , system will automatically trigger out
prodciotn order with part B or we need manually change the proirity in BOM?
Feel this two funciton has some conflict?
Thanks a lot
ALice
ormer Member
Jun 13, 2008 at 10:14 AM
Hi alice zhang..,
if you give eff.date then only from that date material will be repalce. if you dont
give material A will be used first and if stock is zero then material B will be maken
up for rest of the work.
Former Member
Jun 13, 2008 at 10:28 AM
Hi alice zhang..,
as long as stock A is there it, mrp will create requirements for it. once stock is zero
for material A then your mrp will create requirements for B.
In the BOM based also your material will be picked up still stock exists. once it is
zero then material B will be comes to picture.
regards.
After we setup follow-up parts, mrp will create dependent requirements only for
part B like new PR, plan order.
In BOM, we also need setup alternative material for A and B. even though we set
A proirity as 1 100% usage , B as proirity as 2, 100% percentage.
when part A still have stock, prodciton order or backflush will consume part a
qty , in produciton order,
when part A is used up, it will consume B qty , trigger out B material in production
order ?
Thanks
HI
I hope to explain our target. before we buy part A from oversea, Now we buy part
B from local vendor.
So After we plan to buy it from lcoal vendor, We will not place Part A PO, of
course , if it's old po or onhand stock of A, it still need continue to receipt and
consumed it.
If A has stock , then it will still get new independent becasue it also still in bom,
How we could stop to buy it to repalce it with B ? When we have a and B onhand
stock at the same time, How MRP runs ?
Thanks
Alice
Former Member
Jun 13, 2008 at 11:00 AM
Hi alice zhang..,
yes. with followup setup in material master if stock A is not available material B
will be consumed.
if both stocks are available based on the priority in the BOM material A or B will
be consumed.
Hi jagadish
Thanks a lot ,
one concern is , we first add B as A part follow -up material . if we don't set the
valid date, that means when A part is used up, it will move dependent
requirement for B ,right?
Before that, A will still have dependent requirements, we will still place po and
receipt it. So how A could be used up? How B could be trigger out PO? according
to the puchase lead time, our process is we have to start to buy B part when we
decide to obsolote A part. But since A still have qty onhand, and in BOM its
priority as 1, B could not be triiger out requiremnts?
So if we set valid date for follow up mateiral , that means when A has stock, from
that day, MRP will only consider B requirements ,right, even though we set
priority 1 for A in BOM? In bom we set A part as priority 1 and usaging 100%,
when we do backflush , it will consume A part , when A is used up , System will
trigger production order with B matieral automatically ,right? No need to change
the priority for the alternative bom? even though part A proirity as 1
Thanks
ALice
Former Member
Jun 13, 2008 at 11:43 AM
Hi alice zhang..,
1. yes
3. yes.
Hi jagadish
Thanks
Alice
Former Member
Jun 13, 2008 at 01:26 PM
Hi
Maintain MRP type for "A" as ND - No planning. So system will not plan or create
procurement element for A once stock of A finishes.
After stock of A finishes, production order will consider only B automatically and
no need for any manually editions.
Regards
Hi Trinanjan
May I just check ,if we set the mrp type , In BOM , we still use alternative
matieral ,right?
So when there is no stock of part A, it will create prodciton order with B , or when
we do backflush , it will reduce B qty ?
Thanks
ALICE
I am not a PP person but MM, therefore with regards to this alternative BOM,
kindly please let me know my question.
An example:
Questions:
1 - During MRP run, how does SAP know to pick up which of the above BOM? Is
there a config setup on this on the SPRO or material master, or BOM master? if
so what is it?
2 - Sometimes I heard people say this BOM is a production BOM, this BOM is a
material BOM, and bla bla bla, what exactly are those means?
All these BOM thing is really bombing me now, appreciate if an example can be
given on the above three questions. Thanks very much
tuffy.
Dear Tuffy,
1.When you create a material BOM for the first time in the system for a product
using CS01 for BOM usage 1,then this is the
First alternative BOM for that product.When you first create a BOM for a
material, the system automatically creates the first
alternative. The technical type of the BOM is not yet defined, so the technical
type is " " (blank).which is called as simple BOM.
2.After creation of this BOM,in CS03 if you check under BOM header the technical
type field remains empty.This is called as
simple BOM.
3.The system supports 2 techincal type of BOM,one is multiple BOM and the next
is variant BOM.
4.The system does not define the technical type until you create either an
additional alternative for a BOM or a different variant
5.[Technical Types of
BOM|http://help.sap.com/saphelp_erp60_sp/helpdata/en/ea/e9b0c04c7211d18
9520000e829fbbd/content.htm]
6.Multiple BOM means the material has more than one alternative BOM say ther
may be alternative BOM 1 and alternative BOM2.
8.During MRP run the system always picks the first alternative BOM 01 and plans
for the components present in this BOM.
Check with this and revert back with your further queries.
Regards
S Mangalraj
Hi,
Regards,
Sankaran
Thanks, Erik
Dear Erik,
If you have manual selection of production version in the order type dependent
parameters in OPL8 for the order type and plant
combination and if you have set the BOM selection method as 2 in MRP 4 view of
the material master then,
1.If you create a production order manually then the system displays the pop up
to select a production
version.
2.If you are converting the planned order into a production order then it picks up
the one which is
validity dates,then the system picksup the first one only during MRP run.
Even if it picks up the first prod.version in planned order,but while converting click
on master data and
3.Otherwise what you can do is set the production version in MD61 itself ,so that
its going to be considered during MRP run.
4.If in OPL8 the production version selection is set as automatic then the system
picks up the production version automatically.
Regards
Mangalraj.S
Former Member
Nov 03, 2010 at 08:15 AM
One more question,if these configuration was setup,when we process superflush
for finish good ,do we need to choose PV to consume the right material?
>
System will check the valid production version based on validity date, based on
the validity system will pick the Production version, If 2 or more Production
version have same validity then system will pick the first production version.
If u want to user to decide the production version while converting plan order to
production irder them set in OPL8 manual selction of production version is screen
production version.
Hi,
MRP run even if all the prod versions contains the same validity dates and lot
sizes.
Regards,
Dear Erik,
Lot size defined in Version same ( as already MRP has picked first PV )
6) If required you need to manually change the PV in Plan order change mode
7) If before Running MRP if you want system to pick 2nd Version then Lock the
first PV
Regards
Hi,
1) Validity of PV
B/n these if you have multiple versions it always picks the 1st valid version.
Also if you want the MRP to pick a particular version, in MD61 while entering the
demand you can specify
As you are using selction method 2, even if the PV is not there system tries to find
a BOM & a routing again
Regards
Using customer to determine what BOM to use
in Production order (tx:CO41)
Dear Expert,
I have a case which user want to have alternative BOM for decidated customer.
Is there any solution for this case? such as production version or BOM explosion
number?
Marco
Dear Marco,
2) if ur using then , GO to OPL8, just double click on on ur order type & pant
combination, then for production version make it as
3) after doing this setting, Create a Production order Via CO01, then system will
ask u which version u want
4) if u are not using PV, then after MRP Run , go to plan order change mode & give
as ALt2 & save
5) so while convertng system will take Alt 2 BOM as per the Requirment
Regards
kumar