This document is a transformer inspection report upon receipt at a site. It summarizes checks performed on a transformer to verify its condition following delivery. The inspection checked for physical damage to the transformer or components during transport, verified oil levels and for any leakage, and ensured bushings and instruments were intact. Any issues identified would be reported to the supplier. Upon acceptance, the transformer drums would be stored properly and spare parts confirmed.
This document is a transformer inspection report upon receipt at a site. It summarizes checks performed on a transformer to verify its condition following delivery. The inspection checked for physical damage to the transformer or components during transport, verified oil levels and for any leakage, and ensured bushings and instruments were intact. Any issues identified would be reported to the supplier. Upon acceptance, the transformer drums would be stored properly and spare parts confirmed.
This document is a transformer inspection report upon receipt at a site. It summarizes checks performed on a transformer to verify its condition following delivery. The inspection checked for physical damage to the transformer or components during transport, verified oil levels and for any leakage, and ensured bushings and instruments were intact. Any issues identified would be reported to the supplier. Upon acceptance, the transformer drums would be stored properly and spare parts confirmed.
S. No. Check Parameter Criteria Observations Remarks
Condition of Trafo during There should not be any physical
1 unloading damage to the transformer tank.
Check all valves for any type of
2 Physical condition of Valves damage during transportation
Check and note the oil level, if it is
2 Oil Level not up to the mark, then communicate to the supplier
Check the drums for any leakage
3 Oil Drums and for Quantity filled in them.
Check the porcelain section of the
4 Bushings bushing for any cracks or chipping. Check for any typer of oil leakage Oil Leakage from tank, valves or from bushing 6 If any, then give feedback to supplier Frangile Instruments (like Oil 5 Level Guage, Temperature Check for any damage indicators)
Storage of drum at site after Drums should be kept in 3-9
6 unloading O'clock position.
should be checked carefully for
any damage during transit or Radiator fin physical 7 handling be as per the packaging condition list, any missing should be communicated to supplier Should be as per the packaging 8 Spare parts list, any missing should be communicated to supplier