Office of the Executive Engineer, Road Infrastructure- Rajarajeshwarinagar division, Room No.408, Annexe-3 Building, Bangalore-560002
RA Bill No. 1 & Part
Name of Work : Construction of concrete retaining wall, Bridges and other improvement works Ring road from NH Tumkur Road junction to Nayandanahalli junction and ORR from
Sumanahalli junction to Ambedkar college - Phase I.
Approved Previous Measurement Present Measurement Upto Date Measurement
Sl
Item Name Unit BOQ Qty Amount in
No Rate in Rs. Quantity Amount Quantity Amount Quantity Amount
Rupees
1 2 3 4 5 6 7 8 9 10 11 12
KSRRB M200-6.1 Cutting of trees girth from 300mm to
600mm including cutting of trunks, branches and removal of
stumps, roots stacking of serviceable materials with all lifts
and up to a lead of 1000m and earth filling in the depressions
1 / pit, complete as per specifications with all lead and lift, Each 20 100.00 2,000.00 0.00 0.00 0.00 0.00 0.00 0.00
loading and unloading etc complete as directed by the
Engineer-in-charge of work.
KSRRB 800-1. Painting two coats after filling the surface with
synthetic enamel paint in approved shades on new plastered
concrete surfaces, with materials, labour complete as per
23 Sqm 4,127.88 119.00 4,91,217.72 0.00 0.00 0.00 0.00 0.00 0.00
specifications. MORTH Chapter 8 with all lead and lift,
loading and unloading etc complete as directed by the
Engineer-in-charge of work.
11kV G.O.S 200A Single break with all lead and lift, loading
92 and unloading etc complete as directed by the Engineer-in- Set 2 5600.00 11,200.00 0.00 0.00 0.00 0.00 0.00 0.00
charge of work.
11kV G.O.S 400A Double break with all lead and lift, loading
93 and unloading etc complete as directed by the Engineer-in- Set 4 12575.00 50,300.00 0.00 0.00 0.00 0.00 0.00 0.00
charge of work.
8 SWG G.I.Wire with all lead and lift, loading and unloading
110 etc complete as directed by the Engineer-in-charge of work. MT 0.07 45363.00 3,175.41 0.00 0.00 0.00 0.00 0.00 0.00
7/10 SWG Guy Wire with all lead and lift, loading and
111 unloading etc complete as directed by the Engineer-in-charge MT 0.07 46685.00 3,267.95 0.00 0.00 0.00 0.00 0.00 0.00
of work.
Grounding Materials for RMUs & Transformers |
G.I.Grounding pipe, B-Class, 40 mm dia,2.5 mtrs long,
112 2.9mm thick with bolts nuts,GI Strips and washers complete Nos 21 448.00 9,408.00 0.00 0.00 0.00 0.00 0.00 0.00
with all lead and lift, loading and unloading etc complete as
directed by the Engineer-in-charge of work.
11KV. 3 core XLPE HTUG Cable( Round Armoured)-
113 240Sqmm with all lead and lift, loading and unloading etc Km 0.22 1054564.00 2,32,004.08 0.00 0.00 0.00 0.00 0.00 0.00
complete as directed by the Engineer-in-charge of work.
Stringing of 1.1KV Class 3 Phase Aerial Bunch Cable of size
3x95+1x16+1x70 Sqmm with all lead and lift, loading and
114 Km 0.14 312220.00 43,710.80 0.00 0.00 0.00 0.00 0.00 0.00
unloading etc complete as directed by the Engineer-in-charge
of work.
Heat Shrinkable outdoor type cable termination kit for XLPE
cable | 3x240 Sq.mm with all lead and lift, loading and
115 Set 2 3380.00 6,760.00 0.00 0.00 0.00 0.00 0.00 0.00
unloading etc complete as directed by the Engineer-in-charge
of work.
Supply of Dead end clamp/Anchor clamp assembly excluding
brackets, pole clamps with all lead and lift, loading and
116 Nos 4 96.00 384.00 0.00 0.00 0.00 0.00 0.00 0.00
unloading etc complete as directed by the Engineer-in-charge
of work.
Supply of Universal Hook bolts and nuts with all lead and lift,
117 loading and unloading etc complete as directed by the Nos 6 225.00 1,350.00 0.00 0.00 0.00 0.00 0.00 0.00
Engineer-in-charge of work.
Accessories for ABC Cables as per NF-33 as per IS 13573
for joints & terminations- Suspension clamp sutable for
118 insulated messenger wire of size 25 to 95sqm with all lead Set 6 240.00 1,440.00 0.00 0.00 0.00 0.00 0.00 0.00
and lift, loading and unloading etc complete as directed by
the Engineer-in-charge of work.
Pole clamp for HT/LT AB cables with all lead and lift, loading
119 and unloading etc complete as directed by the Engineer-in- Nos 8 73.00 584.00 0.00 0.00 0.00 0.00 0.00 0.00
charge of work.
11Kv Special 3pin arm with all lead and lift, loading and
121 unloading etc complete as directed by the Engineer-in-charge Nos 2 423.00 846.00 0.00 0.00 0.00 0.00 0.00 0.00
of work.
GI bolts and nuts of size 16x150mm with all lead and lift,
122 loading and unloading etc complete as directed by the MT 0.02 81200.00 1,624.00 0.00 0.00 0.00 0.00 0.00 0.00
Engineer-in-charge of work.
11Kv. 5KN Composite/Polymeric pin Insulator(24mm dia FP
123 Road) with all lead and lift, loading and unloading etc Nos 21 129.00 2,709.00 0.00 0.00 0.00 0.00 0.00 0.00
complete as directed by the Engineer-in-charge of work.
Cable Covering tiles 125x125x40mm with all lead and lift,
124 loading and unloading etc complete as directed by the Pack 1 3583.00 3,583.00 0.00 0.00 0.00 0.00 0.00 0.00
Engineer-in-charge of work.
Fixing of 11KV 200A SB GOS including wiring with all lead
125 and lift, loading and unloading etc complete as directed by Set 3.9 455.00 1,774.50 0.00 0.00 0.00 0.00 0.00 0.00
the Engineer-in-charge of work.
Fixing of 11KV 400A DB GOS including wiring with all lead
126 and lift, loading and unloading etc complete as directed by Set 7.8 556.00 4,336.80 0.00 0.00 0.00 0.00 0.00 0.00
the Engineer-in-charge of work.
Making and Fixing of Heat shrinkable type pot head for 3x185
to 3x240 sq.mm HT UG Cable only with all lead and lift,
127 Nos 13 1225.00 15,925.00 0.00 0.00 0.00 0.00 0.00 0.00
loading and unloading etc complete as directed by the
Engineer-in-charge of work.
Erection of 11mtr long Concrete spun pole in a pit of 2.5 mtr
depth, aligning refilling with soil and ramming. with all lead
128 Nos 2 872.00 1,744.00 0.00 0.00 0.00 0.00 0.00 0.00
and lift, loading and unloading etc complete as directed by
the Engineer-in-charge of work.
Digging of Pit 2.5 mtr depth for errection of 11mtr long tubular
spun pole as per approved drawing in Ordinary Soil with all
129 Pit 4 896.00 3,584.00 0.00 0.00 0.00 0.00 0.00 0.00
lead and lift, loading and unloading etc complete as directed
by the Engineer-in-charge of work.
Fixing of Route Joint indicating Slabs for UG cable works.
130 with all lead and lift, loading and unloading etc complete as Nos 145 54.00 7,830.00 0.00 0.00 0.00 0.00 0.00 0.00
directed by the Engineer-in-charge of work.
UG Cable Work:Laying and Jointing the RCC pipes (100-150
mm), dia including lowering in Position: Fixing Collars etc.,
131 Joining with mud mortor complete with all lead and lift, Nos 40 31.00 1,240.00 0.00 0.00 0.00 0.00 0.00 0.00
loading and unloading etc complete as directed by the
Engineer-in-charge of work.
Spreading and forming with sand all round the cable to a
depth of 75 mm and width of 500 mm for UG cable
132 works(sand charges are separate). with all lead and lift, Km 4.15 7211.00 29,925.65 0.00 0.00 0.00 0.00 0.00 0.00
loading and unloading etc complete as directed by the
Engineer-in-charge of work.
Fixing of universal hook bolts and nuts with all lead and lift,
154 loading and unloading etc complete as directed by the Nos 6 91.00 546.00 0.00 0.00 0.00 0.00 0.00 0.00
Engineer-in-charge of work.
Fixing of pulse clamps with all lead and lift, loading and
155 unloading etc complete as directed by the Engineer-in-charge Nos 8 151.00 1,208.00 0.00 0.00 0.00 0.00 0.00 0.00
of work.
Digging of pit for providing GI pipe type earthing in Ordinary
soil with all lead and lift, loading and unloading etc complete
156 Pit 6 360.00 2,160.00 0.00 0.00 0.00 0.00 0.00 0.00
as directed by the Engineer-in-charge of work.
Fixing metering box for housing the ETV meter 3-ph 4 wire
along with CT's Meter wiring for 250kVA TC with all lead and
158 Set 2 900.00 1,800.00 0.00 0.00 0.00 0.00 0.00 0.00
lift, loading and unloading etc complete as directed by the
Engineer-in-charge of work.
Erection of PSC poles 9mtr long with 200kg W1(as per cost
data sheet 6) with all lead and lift, loading and unloading etc
159 Nos 7 537.00 3,759.00 0.00 0.00 0.00 0.00 0.00 0.00
complete as directed by the Engineer-in-charge of work.
Note:
1. This is to certify that the work has been done as per the specifications and site condition.
2. The qauntity mesurements recorded is as per the eexcution of the work.
3. Quality of all the items in the work has been checked and found satisfactory.