This document is a routine maintenance checklist for 9 chilled water air handling units (Units 1-9) located in the RO B SWGR area of the Ras Al Khair Desalination Plant. The checklist includes inspection points for operating status, temperature and pressure of supply and return chilled water, air temperatures and humidity, filter conditions, actuator functions, and equipment conditions. The inspection was performed every 2 weeks and the units were checked by Govintharaju, with T&I Lebid and Section Engineer Marcelo also noted.
This document is a routine maintenance checklist for 9 chilled water air handling units (Units 1-9) located in the RO B SWGR area of the Ras Al Khair Desalination Plant. The checklist includes inspection points for operating status, temperature and pressure of supply and return chilled water, air temperatures and humidity, filter conditions, actuator functions, and equipment conditions. The inspection was performed every 2 weeks and the units were checked by Govintharaju, with T&I Lebid and Section Engineer Marcelo also noted.
This document is a routine maintenance checklist for 9 chilled water air handling units (Units 1-9) located in the RO B SWGR area of the Ras Al Khair Desalination Plant. The checklist includes inspection points for operating status, temperature and pressure of supply and return chilled water, air temperatures and humidity, filter conditions, actuator functions, and equipment conditions. The inspection was performed every 2 weeks and the units were checked by Govintharaju, with T&I Lebid and Section Engineer Marcelo also noted.
This document is a routine maintenance checklist for 9 chilled water air handling units (Units 1-9) located in the RO B SWGR area of the Ras Al Khair Desalination Plant. The checklist includes inspection points for operating status, temperature and pressure of supply and return chilled water, air temperatures and humidity, filter conditions, actuator functions, and equipment conditions. The inspection was performed every 2 weeks and the units were checked by Govintharaju, with T&I Lebid and Section Engineer Marcelo also noted.
HVAC Department for Ras Al Khair Desalination Plant
Chilled Water Type Air Handling Model
Equipment: Unit 39FX7100 KKS NO: 80SAB04AH001-003 No. Every 2 Weeks Routine Maintenance Location RO B SWGR Date:
Unit 1 Unit 2 Unit 3
Checkpoint (80SAB04AH001) (80SAB04AH002) (80SAB04AH003) Remarks Operating Status
Chilled Water Temp. °C °C °C
Supply Pressure
Chilled Water Temp. °C °C °C
Return Pressure Water Leakage Temp. °C °C °C Supply Air Humidity % % % Temp. °C °C °C Return Air Humidity % % % Temp. °C °C °C Fresh Air Humidity % % % Bag Filter Filter Condition Pre Filter Damper Supply Actuator Condition Return
Flexible Canvas Supply
Condition Return Flow Switch Smoke Detector TCV Condition Ducting Condition Main Body Condition Additional Comment:
Checked By: T &I: Section Engineer
HVAC-WC-003 (RO B SWGR)
Govintharaju Lebid Marcelo
HVAC-WC-003 (RO B SWGR)
HVAC Department for Ras Al Khair Desalination Plant
Chilled Water Type Air Handling Model
Equipment: Unit 39FX 680 KKS NO: 80SAB04AH004-006 No. Every 2 Weeks Routine Maintenance Location RO B SWGR Date:
Unit 4 Unit 5 Unit 6
Checkpoint (80SAB04AH004) (80SAB04AH005) (80SAB04AH006) Remarks Operating Status
Chilled Water Temp. °C °C °C
Supply Pressure
Chilled Water Temp. °C °C °C
Return Pressure Water Leakage Temp. °C °C °C Supply Air Humidity % % % Temp. °C °C °C Return Air Humidity % % % Temp. °C °C °C Fresh Air Humidity % % % Bag Filter Filter Condition Pre Filter Damper Supply Actuator Condition Return
Flexible Canvas Supply
Condition Return Flow Switch Smoke Detector TCV Condition Ducting Condition Main Body Condition Additional Comment:
Checked By: T &I: Section Engineer
HVAC-WC-003 (RO B SWGR)
Govintharaju Lebid Marcelo
HVAC-WC-003 (RO B SWGR)
HVAC Department for Ras Al Khair Desalination Plant
Chilled Water Type Air Handling Model
Equipment: Unit 39FX 780 KKS NO: 80SAB04AH007-009 No. Every 2 Weeks Routine Maintenance Location RO B SWGR Date:
Unit 7 Unit 8 Unit 9
Checkpoint (80SAB04AH007) (80SAB04AH008) (80SAB04AH009) Remarks Operating Status
Chilled Water Temp. °C °C °C
Supply Pressure
Chilled Water Temp. °C °C °C
Return Pressure Water Leakage Temp. °C °C °C Supply Air Humidity % % % Temp. °C °C °C Return Air Humidity % % % Temp. °C °C °C Fresh Air Humidity % % % Bag Filter Filter Condition Pre Filter Damper Supply Actuator Condition Return
Flexible Canvas Supply
Condition Return Flow Switch Smoke Detector TCV Condition Ducting Condition Main Body Condition Additional Comment: