Professional Documents
Culture Documents
Orn107 BSL Adjustable Guardrail Gate Instructions
Orn107 BSL Adjustable Guardrail Gate Instructions
Installation Instructions
! WARNING Installation
PLEASE READ AND FOLLOW THESE 1. Determine the type of scaffold on which the gate will
INSTRUCTIONS BEFORE INSTALLING, USING be installed.
OR DISMANTLING THIS ADJUSTABLE GATE.
2. Determine bay size (leg spacing or frame width).
SERIOUS INJURY OR DEATH CAN RESULT
FROM FAILURE TO FAMILIARIZE YOURSELF 3. Adjust the gate accordingly based on frame and/or
AND COMPLY WITH ALL APPLICABLE SAFETY type of scaffolding used.
REQUIREMENTS OF FEDERAL, STATE, LOCAL 4. Position the gate on the inside of the platform so the
AND PROVINCIAL REGULATIONS. top rail of the gate is between 38" – 45" above the
platform. Refer to federal, state, local and provincial
INSTALLATION AND DISMANTLING MUST BE
DONE UNDER SUPERVISION OF A COMPETENT regulations for actual top rail height requirement.
PERSON EXPERIENCED IN SCAFFOLD Note: Gate must swing inward.
ERECTION AND DISMANTLING. DO NOT 5. Tighten clamps to approximately 45 ft-lb.
USE IN ANY OTHER FASHION OR WITH ANY 6. Check operation of the gate to ensure it closes
OTHER COMPONENTS WITHOUT CONSULTING properly and does not swing beyond the leg, post
BRANDSAFWAY. or frame.
Locking Pin
Clamps
Torsion Spring
Platform
Figure 2 – Left Hand View of Gate Figure 3 – Right Hand View of Gate Figure 4 – Top Rail Height
(from inside scaffold) (from inside scaffold) Requirement
F E D C B A A B
18¾"
47¹⁵⁄₃₂" 44¹⁵⁄₃₂"
C D
38¹⁵⁄₃₂" 34²⁵⁄₃₂"
E F
Frame Width
SAU or LTUB
Ladder
System
76"
Frame Width
Frame Width
SAU or LTUB
Ladder
Integral System
Ladder
76" 76"
LOF_ style frame (Intermediate Level) FM_ style frame (Intermediate Level)
SAU or LTUB
SAU or LTUB SAU or LTUB Ladder
Ladder Ladder SAGP System
System System
SAGSU
Systems™ Bays (up to 48") Systems™ Gate Unit Systems™ Gate Post