Professional Documents
Culture Documents
8th Annual Meeting - RAT LIST
8th Annual Meeting - RAT LIST
Executive Engineer,
I.B.Division, Dharmavaram
ANNEXURE -1
8th Annual RAT MEETING- Details of RATs
Name of the District : Ananthapuramu
DLCC Meeting Date: 12/4/2022
Tank Condition
New Left
S.No Division Sub Division Village Mandal Name of the Tank ID Rly Lat Long Status of the Repair identified in Identifed Over
Tank Num Zone 7th RAT Tank if Tanks
Urgent Maintenace any if any
Repairs Normal Repairs Repairs Good
required required required Conditon
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Seepage in the
I.B Sub - ANDHA Seepage in the tank bund noticed
I.B. Division, tank bund noticed
2 Division, Byadrahalii Kalyandurg Samathamikunta 005200 SWR 14-27'-37" 77-09'-02" hence U/S cutoff is to be
Dharmavaram hence U/S cutoff is
Kalyandurg RYD provided.
to be provided.
Heavy jungle is
ANDHA
I B Division I B Sub Division Dharmavaram MI 77° 44' observed on top of Jungle on bund is to be cleared
6 Dharmavaram Dharmavaram 004300 SCR 14° 24' 00"N
Dharmavaramu Dharmavaram Tank 15"E bund. Jungle is to
MPL
be cleared
ANDHA
I B Division I B Sub Division 77° 41' Good
7 Pothukunta DharmavaramPothukunta Tank 004100 SCR 14° 25' 15"N -
Dharmavaramu Dharmavaram 30"E Conditon
ATP
ANDHA
I B Division I B Sub Division 77° 39' Good
8 KattakindapalliDharmavaramKattakindapalli Ta 004100 SCR 14° 26' 15"N -
Dharmavaramu Dharmavaram 15"E Conditon
ATP
ANDHA Jungle to be
I B Division I B Sub Division 77° 40' Jungle to be cleared
9 Regatipalli DharmavaramRegatipalli Tank 004200 SCR 14° 23' 30"N cleared
Dharmavaramu Dharmavaram 45"E
ATP
Bund
strengthe
ANDHA ning
I B Division I B Sub Division Venkatathimmap 77° 49'
10 Venkatathimm Dharmavaram 004800M SCR 14° 23' 42"N work is -
Dharmavaramu Dharmavaram uram Tank 32"E
PL complete
d.Good
Conditon
ANDHA
I B Division I B Sub Division Nadimigadda 77° 47' Good
11 Nadimigadda Pa
Dharmavaram 005000M SCR 14° 22' 25"N -
Dharmavaramu Dharmavaram Palli Tank 20"E Conditon
PL
ANDHA
I B Division I B Sub Division 77° 47' Good
12 Darsinamala DharmavaramDarsinamala Tank004700M SCR 14° 24' 45"N -
Dharmavaramu Dharmavaram 00"E Conditon
PL
ANDHA
I B Division I B Sub Division 77° 47' Good
13 Ravula CheruvDharmavaramRavula Cheruvu T004600 SCR 14° 24' 45"N -
Dharmavaramu Dharmavaram 20"E Conditon
MPL
ANDHA
I B Division I B Sub Division Obulanayani Palli 77° 47' Good
14 Obulanayani Pa
Dharmavaram 004500 SCR 14° 22' 25"N -
Dharmavaramu Dharmavaram Tank 20"E Conditon
MPL
ANDHA
I B Division I B Sub Division Nagireddy Kunta 77° 46' Good
15 Ravula CheruvDharmavaram 004400 SCR 14° 24' 55"N -
Dharmavaramu Dharmavaram Tank 25"E Conditon
MPL
ANDHA
I B Division I B Sub Division Good
16 Viswanathapu Bathalapalli Kothakatta Tank 004900 SCR 14-14'-49" 77-41'-11" -
Dharmavaramu Dharmavaram Conditon
MPL
AN KDR
I B Division I B Sub Division Malakavemula Good
17 Malakavemula Mudigubba 055 SCR 14º-48'-45'' 78º-02'-45'' -
Dharmavaramu Dharmavaram tank Conditon
G/MPL
AN KDR
I B Division I B Sub Division Marrimanu Good
18 Mukthapuram Mudigubba 053 SCR 14º-23'-15'' 77º-53'-51'' -
Dharmavaramu Dharmavaram cheruvu Conditon
G/MPL
At chainage 200 M from L/s of the
At chainage 200 M bund. This work proposed under
AN KDR from L/s of the RRR Ph 3 Detailed Estimate
I B Division I B Sub Division Ragimanu
19 Gunjepalli Mudigubba 054 SCR 14º-19'-50'' 77º-57'-00'' bund.This work Submitted to the CE,MI & Med
Dharmavaramu Dharmavaram cheruvu
G/MPL proposed under Vijayawada vide SE/IC/ATP
RRR Ph III Lr.No.133 CE,Dt:27-8-2021.
Admin approval Awaited.
AN KDR
I B Division I B Sub Division Mukthapuram Good
20 Mukthapuram Mudigubba 052 SCR 14º-23'-00'' 77º-53'-00'' -
Dharmavaramu Dharmavaram tank Conditon
G/MPL
Ralla Ralla AN KDR
I B Division I B Sub Division Good
21 Ananthapura Mudigubba Ananthapuram 051 SCR 14º-25'-12'' 77º-55'-10'' -
Dharmavaramu Dharmavaram Conditon
m tank G/MPL
I.B.Sub- ANCKP
I.B.Division,Dhar Medapuram M. Sluices repairs Sluices repairs required. Work
22 Division,C.K.Pal Medapuramu C.K.Palli 003500 SWR 140 19' 43" 770 43' 05"
mavaram I.Tank required. Rectified by Ayacutdars/ villagers
li HUP
Strengthening of
bund and Weirs
Strengthening of bund and Weirs
I.B.Sub- ANCKP work sanctioned
I.B.Division,Dhar Yerra Cheruvu of work sanctioned under APIIATP.
23 Division,C.K.Pal Kanumukkala C.K.Palli 003700 SWR 140 17' 46" 770 40' 08" under APIIATP.
mavaram Kanumukkala Work not started due to water in
li HUP Work not started
the tank
due to water in the
tank
Strengthening of bund.
Work is Proposed under
Janardhana
I.B.Sub- ANCKP R.R.R.Programme and Estimate
I.B.Division,Dhar Deekshithula Strengthening of
29 Division,C.K.Pal Kuntimaddi Ramagiri 003900 SCR 140 19' 44" 770 36' 07" Submitted to the CE,MI & Med
mavaram Tank of bund.
li HUP Vijayawada vide SE/IC/ATP
Kuntimaddi
Lr.No.133 CE,Dt:27-8-2021
Admin approval Awaited.
Executive Engineer,
I.B.Division, Dharmavaram