ANNEXURE -II

TELEPHONE NUMBERS OF IRRIGATION OFFICIALS DEALING WITH


RAILWAY AFFECTING TANKS

Sl. Name of the Railway Name of the Name of Officer


Name of the Village Designation Telephone No.
No. Affecting tank Mandal (Sarvasri)

Mulaswamy Tank Kalyandurg Chapiri Deputy Executive Engineer,I.B Sub -


1 B.D.Balaramudu Division, Kalyandurg 9440903352

Samathamikunta Kalyandurg Byadrahalii Deputy Executive Engineer,I.B Sub -


2 B.D.Balaramudu Division, Kalyandurg 9440903352
Cholarayani tank of Garudapuram Deputy Executive Engineer,I.B Sub -
Kalyandurg
3 Garudapuram B.D.Balaramudu Division, Kalyandurg 9440903352
Madanahalli Deputy Executive Engineer,I B Sub
4 Madanahalli M I Tank D Hirehal M. A. Narasimha Murthy Division Rayadurg 9440907325
Jajirikal Deputy Executive Engineer,I B Sub
5 Jajirikal Tank D Hirehal M. A. Narasimha Murthy Division Rayadurg 9440907325
Deputy Executive Engineer,I B Sub
6 Dharmavaram MI Tank Dharmavaram Dharmavaram B.D.Balaramudu Division Dharmavaram 9440903352
Deputy Executive Engineer,I B Sub
7 Pothukunta Tank Dharmavaram Pothukunta B.D.Balaramudu Division Dharmavaram 9440903352
Deputy Executive Engineer,I B Sub
8 Kattakindapalli Tank Dharmavaram Kattakindapalli B.D.Balaramudu Division Dharmavaram 9440903352
Deputy Executive Engineer,I B Sub
9 Regatipalli Tank Dharmavaram Regatipalli B.D.Balaramudu Division Dharmavaram 9440903352
Venkatathimmapuram Deputy Executive Engineer,I B Sub
10 Tank Dharmavaram Venkatathimmapuram B.D.Balaramudu Division Dharmavaram 9440903352
Deputy Executive Engineer,I B Sub
11 Nadimigadda Palli Tank Dharmavaram Nadimigadda Palli B.D.Balaramudu Division Dharmavaram 9440903352
Deputy Executive Engineer,I B Sub
12 Darsinamala Tank Dharmavaram Darsinamala B.D.Balaramudu Division Dharmavaram 9440903352
Deputy Executive Engineer,I B Sub
13 Ravula Cheruvu Tank Dharmavaram Ravula Cheruvu B.D.Balaramudu Division Dharmavaram 9440903352
Deputy Executive Engineer,I B Sub
14 Obulanayani Palli Tank Dharmavaram Obulanayani Palli B.D.Balaramudu Division Dharmavaram 9440903352
Deputy Executive Engineer,I B Sub
15 Nagireddy Kunta Tank Dharmavaram Ravula Cheruvu B.D.Balaramudu Division Dharmavaram 9440903352
Kotha Kotta Deputy Executive Engineer,I B Sub
16 (Viswanthapuram) Bathalapalli Viswanathapuram B.D.Balaramudu Division Dharmavaram 9440903352

Malakavemula tank Mudigubba Malakavemula Deputy Executive Engineer,I B Sub


17 B.D.Balaramudu Division Dharmavaram 9440903352

Marrimanu cheruvu Mudigubba Mukthapuram Deputy Executive Engineer,I B Sub


18 B.D.Balaramudu Division Dharmavaram 9440903352

Ragimanu cheruvu Mudigubba Gunjepalli Deputy Executive Engineer,I B Sub


19 B.D.Balaramudu Division Dharmavaram 9440903352

Mukthapuram tank Mudigubba Mukthapuram Deputy Executive Engineer,I B Sub


20 B.D.Balaramudu Division Dharmavaram 9440903352

Ralla Ananthapuram Ralla Ananthapuram


Mudigubba Deputy Executive Engineer,I B Sub
tank
21 B.D.Balaramudu Division Dharmavaram 9440903352

Pyadindi tank C.K.Palli Deputy Executive Engineer,I B Sub


22 Pyadindi M.Venkata Ramana Division C.K.Palli 8179312422
Chinnacheruvu of Deputy Executive Engineer,I B Sub
C.K.Palli
23 Nagasamudram Nagasamudram M.Venkata Ramana Division C.K.Palli 8179312422
Pedda cheruvu of Deputy Executive Engineer,I B Sub
C.K.Palli
24 Nagasamudram Nagasamudram M.Venkata Ramana Division C.K.Palli 8179312422

Puletipalli tank C.K.Palli Deputy Executive Engineer,I B Sub


25 Puletipalli M.Venkata Ramana Division C.K.Palli 8179312422

Madapuram tank C.K.Palli Deputy Executive Engineer,I B Sub


26 Medapuramu M.Venkata Ramana Division C.K.Palli 8179312422

Basampalli tank C.K.Palli Deputy Executive Engineer,I B Sub


27 Basampalli M.Venkata Ramana Division C.K.Palli 8179312422
Yerracheruvu of Kanumukkala Deputy Executive Engineer,I B Sub
C.K.Palli
28 Kanumukkala M.Venkata Ramana Division C.K.Palli 8179312422

Mukthapuram tank Kanaganipalli Deputy Executive Engineer,I B Sub


29 Mukthapuramu M.Venkata Ramana Division C.K.Palli 8179312422
Janardhana
Deekshithula Tank of Ramagiri Kuntimaddi M.Venkata Ramana
Deputy Executive Engineer,I B Sub
30 Kuntimaddi Division C.K.Palli 8179312422

Executive Engineer,
I.B.Division, Dharmavaram
ANNEXURE -1
8th Annual RAT MEETING- Details of RATs
Name of the District : Ananthapuramu
DLCC Meeting Date: 12/4/2022
Tank Condition
New Left
S.No Division Sub Division Village Mandal Name of the Tank ID Rly Lat Long Status of the Repair identified in Identifed Over
Tank Num Zone 7th RAT Tank if Tanks
Urgent Maintenace any if any
Repairs Normal Repairs Repairs Good
required required required Conditon
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

The bund level is to


be increased up to
Jangle clearance and
I.B Sub - ANDHA TBL , Bund width
I.B. Division, Strengthening of bund.
1 Division, Chapiri Kalyandurg Mulaswamy Tank 055100 SWR 14-36'-14" 77-07'-24" shall be widened ,
Dharmavaram Work is Proposed under
Kalyandurg RYD the bund slopes
R.R.R.Programme
may be restored as
per M.I Standards

Seepage in the
I.B Sub - ANDHA Seepage in the tank bund noticed
I.B. Division, tank bund noticed
2 Division, Byadrahalii Kalyandurg Samathamikunta 005200 SWR 14-27'-37" 77-09'-02" hence U/S cutoff is to be
Dharmavaram hence U/S cutoff is
Kalyandurg RYD provided.
to be provided.

I.B Sub - ANDHA


I.B. Division, Cholarayani tank Good
3 Division, Garudapuram Kalyandurg 055100 SWR 14-30'-51" 77-06'-28" -
Dharmavaram of Garudapuram Conditon
Kalyandurg RYD

1)Jungle on bund is to be cleared


2)Pitching on U/s of bund is to be
rectified In damaged portions.
3)Banking should be done on
1)Jungle on
1)Banking should L/s of surplus weir.
bund is to be
be done on L/s of 4) Minor crack were observed on
cleared
surplus weir. Bodywall of surplus weir and
ANRYD 2)Pitching on
I B Division I B Sub Division 2)Minor crack were required repairs. Estimate
4 Madanahalli D Hirehal Madanahalli M I ta002900BE SWR 14º59'30" N 76º48'06" E U/s of bund
Dharmavaramu Rayadurg observed on submitted to CE/MI/Vijayawada
L is to be
Bodywall of surplus Vide SE's lr.No.165 CE, dt:-23-
rectified In
weir and required 10-2021. and Work is Proposed
damaged
repairs. under R.R.R.Programme also
portions
Estimate Submitted to the CE,MI
& Med Vijayawada vide
SE/IC/ATP Lr.No.133 CE,Dt:27-
8-2021
1)Jungle on bund is to be
cleared. 2) Surplus weir
Abutment U/S & body wall is in good condition and
ANRYD D/S wings, Returns Abutment, U/s & D/s
I B Division I B Sub Division
5 Jajirikal D Hirehal Jajirikal Tank 003000 SWR 14º58'38" N 76º50'30" E are to be provided wings,returns are to be provided
Dharmavaramu Rayadurg
BEL on both sides of on both sides of surplus weir.
surplus weir. Estimate submitted to
CE/MI/Vijayawada Vide SE's
lr.No.5 CE, dt:-5-1-2021.

Heavy jungle is
ANDHA
I B Division I B Sub Division Dharmavaram MI 77° 44' observed on top of Jungle on bund is to be cleared
6 Dharmavaram Dharmavaram 004300 SCR 14° 24' 00"N
Dharmavaramu Dharmavaram Tank 15"E bund. Jungle is to
MPL
be cleared
ANDHA
I B Division I B Sub Division 77° 41' Good
7 Pothukunta DharmavaramPothukunta Tank 004100 SCR 14° 25' 15"N -
Dharmavaramu Dharmavaram 30"E Conditon
ATP
ANDHA
I B Division I B Sub Division 77° 39' Good
8 KattakindapalliDharmavaramKattakindapalli Ta 004100 SCR 14° 26' 15"N -
Dharmavaramu Dharmavaram 15"E Conditon
ATP
ANDHA Jungle to be
I B Division I B Sub Division 77° 40' Jungle to be cleared
9 Regatipalli DharmavaramRegatipalli Tank 004200 SCR 14° 23' 30"N cleared
Dharmavaramu Dharmavaram 45"E
ATP

Bund
strengthe
ANDHA ning
I B Division I B Sub Division Venkatathimmap 77° 49'
10 Venkatathimm Dharmavaram 004800M SCR 14° 23' 42"N work is -
Dharmavaramu Dharmavaram uram Tank 32"E
PL complete
d.Good
Conditon

ANDHA
I B Division I B Sub Division Nadimigadda 77° 47' Good
11 Nadimigadda Pa
Dharmavaram 005000M SCR 14° 22' 25"N -
Dharmavaramu Dharmavaram Palli Tank 20"E Conditon
PL
ANDHA
I B Division I B Sub Division 77° 47' Good
12 Darsinamala DharmavaramDarsinamala Tank004700M SCR 14° 24' 45"N -
Dharmavaramu Dharmavaram 00"E Conditon
PL
ANDHA
I B Division I B Sub Division 77° 47' Good
13 Ravula CheruvDharmavaramRavula Cheruvu T004600 SCR 14° 24' 45"N -
Dharmavaramu Dharmavaram 20"E Conditon
MPL
ANDHA
I B Division I B Sub Division Obulanayani Palli 77° 47' Good
14 Obulanayani Pa
Dharmavaram 004500 SCR 14° 22' 25"N -
Dharmavaramu Dharmavaram Tank 20"E Conditon
MPL
ANDHA
I B Division I B Sub Division Nagireddy Kunta 77° 46' Good
15 Ravula CheruvDharmavaram 004400 SCR 14° 24' 55"N -
Dharmavaramu Dharmavaram Tank 25"E Conditon
MPL
ANDHA
I B Division I B Sub Division Good
16 Viswanathapu Bathalapalli Kothakatta Tank 004900 SCR 14-14'-49" 77-41'-11" -
Dharmavaramu Dharmavaram Conditon
MPL
AN KDR
I B Division I B Sub Division Malakavemula Good
17 Malakavemula Mudigubba 055 SCR 14º-48'-45'' 78º-02'-45'' -
Dharmavaramu Dharmavaram tank Conditon
G/MPL
AN KDR
I B Division I B Sub Division Marrimanu Good
18 Mukthapuram Mudigubba 053 SCR 14º-23'-15'' 77º-53'-51'' -
Dharmavaramu Dharmavaram cheruvu Conditon
G/MPL
At chainage 200 M from L/s of the
At chainage 200 M bund. This work proposed under
AN KDR from L/s of the RRR Ph 3 Detailed Estimate
I B Division I B Sub Division Ragimanu
19 Gunjepalli Mudigubba 054 SCR 14º-19'-50'' 77º-57'-00'' bund.This work Submitted to the CE,MI & Med
Dharmavaramu Dharmavaram cheruvu
G/MPL proposed under Vijayawada vide SE/IC/ATP
RRR Ph III Lr.No.133 CE,Dt:27-8-2021.
Admin approval Awaited.

AN KDR
I B Division I B Sub Division Mukthapuram Good
20 Mukthapuram Mudigubba 052 SCR 14º-23'-00'' 77º-53'-00'' -
Dharmavaramu Dharmavaram tank Conditon
G/MPL
Ralla Ralla AN KDR
I B Division I B Sub Division Good
21 Ananthapura Mudigubba Ananthapuram 051 SCR 14º-25'-12'' 77º-55'-10'' -
Dharmavaramu Dharmavaram Conditon
m tank G/MPL
I.B.Sub- ANCKP
I.B.Division,Dhar Medapuram M. Sluices repairs Sluices repairs required. Work
22 Division,C.K.Pal Medapuramu C.K.Palli 003500 SWR 140 19' 43" 770 43' 05"
mavaram I.Tank required. Rectified by Ayacutdars/ villagers
li HUP

Strengthening of
bund and Weirs
Strengthening of bund and Weirs
I.B.Sub- ANCKP work sanctioned
I.B.Division,Dhar Yerra Cheruvu of work sanctioned under APIIATP.
23 Division,C.K.Pal Kanumukkala C.K.Palli 003700 SWR 140 17' 46" 770 40' 08" under APIIATP.
mavaram Kanumukkala Work not started due to water in
li HUP Work not started
the tank
due to water in the
tank

I.B.Sub- Chikkavadayar ANCKP


I.B.Division,Dhar Nagasamudra Good Sluices repairs required. Work
24 Division,C.K.Pal C.K.Palli Tank of 003300 SWR 400 18' 28" 770 39' 07"
mavaram m Conditon Rectified by Ayacutdars/ villagers
li Nagasamudram HUP

Strengthening of bund is required


as per M.I.Standards.
Work is Proposed under
I.B.Sub- ANCKP
I.B.Division,Dhar Nagasamudra Small Tank of Strengthening of R.R.R.Programme Estimate
25 Division,C.K.Pal C.K.Palli 003200 SWR 140 17' 45" 770 40' 25"
mavaram m Nagasamudram bund required Submitted to the CE,MI & Med
li HUP
Vijayawada vide SE/IC/ATP
Lr.No.133 CE,Dt:27-8-2021
Admin approval Awaited.

Piping was occured at sluice 1 &


2 and temporary piping was
closed and estimate is submitted
Piping was occured for permnent restoration,and
I.B.Sub- ANCKP
I.B.Division,Dhar at sluice 1 & 2 and Work is Proposed under
26 Division,C.K.Pal Basampalli C.K.Palli Basampalli Tank 003600 SWR 140 18' 44" 770 44' 21"
mavaram temporary piping R.R.R.Programme Estimate
li HUP
was closed Submitted to the CE,MI & Med
Vijayawada vide SE/IC/ATP
Lr.No.133 CE,Dt:27-8-2021
Admin approval Awaited.
Restoration of bund.Work is
Restoration of
Proposed under
bund, Estimate
I.B.Sub- ANCKP R.R.R.Programme and Estimate
I.B.Division,Dhar (DPR) Submitted
27 Division,C.K.Pal Puletipalli C.K.Palli Puletipalli Tank 003400 SWR 140 16' 48" 770 40' 32" Submitted to the CE,MI & Med
mavaram for permanent
li HUP Vijayawada vide SE/IC/ATP
restoration under
Lr.No.133 CE,Dt:27-8-2021
R.R.R.Programme
Admin approval Awaited.

Strengthening of Strengthening of bund.Work is


bund,Gullies are Proposed under
I.B.Sub- ANCKP formed Estimate R.R.R.Programme and Estimate
I.B.Division,Dhar
28 Division,C.K.Pal Pyadindi C.K.Palli Pyadindi Tank 003100 SWR 14021' 18" 770 41' 13" (DPR) Submitted Submitted to the CE,MI & Med
mavaram
li HUP for permanent Vijayawada vide SE/IC/ATP
restoration under Lr.No.133 CE,Dt:27-8-2021
R.R.R.Programme Admin approval Awaited.

Strengthening of bund.
Work is Proposed under
Janardhana
I.B.Sub- ANCKP R.R.R.Programme and Estimate
I.B.Division,Dhar Deekshithula Strengthening of
29 Division,C.K.Pal Kuntimaddi Ramagiri 003900 SCR 140 19' 44" 770 36' 07" Submitted to the CE,MI & Med
mavaram Tank of bund.
li HUP Vijayawada vide SE/IC/ATP
Kuntimaddi
Lr.No.133 CE,Dt:27-8-2021
Admin approval Awaited.

Strengthening of bund and


sluices.
Strengthening of Work is Proposed under
I.B.Sub- KattameedaRaya ANCKP
I.B.Division,Dhar Mukthapuram Kanaganapall bund and 3 Nos R.R.R.Programme and Estimate
30 Division,C.K.Pal ni Cheruvu of 003800 SCR 140 27' 40" 770 37' 13"
mavaram u i Sluices requires, Submitted to the CE,MI & Med
li Mukthapuramu HUP
shutter to be fixed. Vijayawada vide SE/IC/ATP
Lr.No.133 CE,Dt:27-8-2021
Admin approval Awaited.

Executive Engineer,
I.B.Division, Dharmavaram