Hall Table
Hall Table
Mr McCrorey
Rowan Faulconer
Ulladulla High School
Ulladulla, 2539, N.S.W.
WORK
1
2
LIMITATIONS
COST, SIZE, FUNCTION, TIME, MATERIAL AVAILABILITY, EXPERTISE AND SAFETY.
The cost for this project should be minimal due to being provided with materials i.e., the
pine. Size is a large factor presenting a challenge for movement and storage, the overall
design should be no heavier than what I can easily lift. I have at least ten weeks to work
on this project which according to my time schedule should be more than enough.
Regular safety rules and regulations apply to this project as do the rest.
CONSTRUCTION PLANS
MATERIALS
4 x Timbers,
Pine was the easiest and cheapest option, something like cherry, oak or maple would
have provided a much better look however this is not going to be a staple piece of
furniture in my house.
3 x adhesives, regular wood glue was the only option here although I did look at using
stronger glues such as gorilla glue, Elmer’s, jb weld and so on.
3 x Finishes
While researching lacquers Danish oil seemed promising however polyurethane and
linseed oil reoccurred due to the cost, look and ease of application.
COSTING
The cost for this project should be minimal due to being provided with materials i.e., the
pine. Size is a large factor presenting a challenge for movement and storage, the overall
design should be no heavier than what I can easily lift. I have at least ten weeks to work
on this project, which should be more than enough according to my schedule. Regular
safety rules and regulations apply to this project as do the rest.
RESEARCH
This is the main aesthetic I am trying to achieve, a
neutral finished piece integrating with the
surroundings .
Overall, an amazing build and what I am striving for in
quality and aesthetics.