2. Site Preparation & Slip, trip & Fall Hazards- Injury The permit issuer and receiver will conduct a joint site inspection to discuss the hazards
Inspection and precautions required for conducting the job safely.
Ensure the MOT permit is available on site and valid.
Obtain work permit as outlined in GI-2.100.Work Permit System / Arkad work permit
Page 1 of 8
Ensure all workers have access sign by proponent prior to work
A tool box meeting shall be conducted informing also the location of assembly area for
emergency & contact numbers to be posted
In case of any emergency, all activities shall be stopped according to emergency
response plan.
Male nurse and Ambulance shall be on site.
Only authorized persons allowed on the working area.
Stop work authority signage shall be posted at the jobsite.
3. Mobilization of Tools Accidents by moving Sequence of work shall be discussed during pre-task briefing before the work
& Personnel equipment results in property commence.
damage & potential caught-in Work permit and confined space entry permit shall require for all excavations over 1.2
between/ struck by & crush meters in depth in according to the G.I 2.100.Work Permit System.
injury A joint site inspection shall be conducted by permit issuer and receiver
Low bed trailer should be in good condition
Depute a flagman, equipped with reflecting safety vest.
All drivers shall comply with G.I- 6.030 Traffic Control and Vehicle Safety.
All job required PPE and safety equipment shall use at the job site.
Mobilization of property damage Sequence of work shall be discuss during pre-task briefing before the work
4. Equipment to the Site commence.
potential caught-in between/
struck by & crush injury Assign a flagman, equipped with a reflecting safety vest.
Remove excavated soil manually or by using (Only) bob cat, combination
machine JCB with certified operator and spotter wearing reflecting west.
Heavy equipment dump truck not allowed working inside fence
All equipment needs to keep 2 meters away from the excavation.
All equipment shall be inspected on a daily basis prior to use
Only SA / SPSP Certified operators shall operate equipment.
All operators and drivers shall comply with G.I- 6.030 Traffic Control and
Vehicle Safety.
Page 2 of 8
5 Excavation by hand Personal Injury All employees shall wear job required proper PPE (FRC,helmet, Safety Glass, Safety
Shoes and appropriate gloves etc.) and experienced enough to do the job
Unauthorized personnel’s shall not allowed at the work area
First aid kit and first aider will available at site.
Damage to underground Location plan and work method statement which is prepared by the
facilitates (communication Project Engineer shall be submitted to the concerned department for review and
cables/electrical or approval. The surveyor should survey the area prior to start of marking the lines.
Government cables) Pre-excavation checklist shall be filled-up and approved prior to any excavation.
Pre – task meeting will conduct by site supervisor and foreman.
Check the underground utilities using location map and detector if necessary
Daily excavation checklist shall be completed prior to permit issuance.
Any excavation more than 1.2m (4ft.) consider as a confined space should be arrange
Cave in (collapse of side
confined space permit and gas test from concern dept.
walls)
Unauthorized personnel shall not enter the work location.
Shoring/sloping of excavation according to soil condition.
Excavation and Shoring guide, refer to Aramco Standard
7 Housekeeping Health Hazard -Regular disposal of waste, debris and scrap materials shall carried-out.
-Trash bin for waste, used paper cups, scrap and debris shall be provided.
-Drinking containers shall be in good sanitary, tightly capped, and clearly marked for
Page 3 of 8
use and cup dispensers shall be provided.
Page 4 of 8
Supervisor responsible for explaining contents of this JSA
Name: Signature: Date:
Page 5 of 8
Sign On: I confirm that the JSA has been explained and its contents are clearly understood and accepted. I also confirm that my
required qualifications to undertake this activity are current and approved. I clearly understand the controls in this JSA must be applied
as documented; otherwise work is to cease immediately and a review is to be completed and work can recommence.
Page 6 of 8
Page 7 of 8
Page 8 of 8