Professional Documents
Culture Documents
Pre Monsoon UST Check Process
Pre Monsoon UST Check Process
associated systems
Reliance BP Mobility Limited
Basic Tank Layout
3/8/2022 2
Tank Nozzle Details
3/8/2022 3
Minimum UST Points to confirm
S.No Nozzle/Associated Lines Monsoon Protection Provided (Yes/No) Date Any remarks
1 N1
2 N2
3 N3
4 N4
5 N5
6 N6
7 N7
8 N8
9 M1
10 DIP PIPE lock Position
11 ATG Pipe Gland Position
12 Any Puncture in Vent Line
13 Vent Line Flange in Tank Chamber
14 Gasket of all visible flanges should
not be damaged
15 ATG Cable conduit pipe in tank
chamber should be puff sealed
Note-Pont-14 need to be confirmed before application of Silicon sealant from NozzleN1-N8 and M1
RO Code-
RO Name-
Date of Execution-
3/8/2022 4
Damaged Gasket Vs Healthy Gasket Photo
3/8/2022 5
Damaged Vent Pipe Vs Healthy Vent Pipe Photo
3/8/2022 6
Tank Chamber-01
Silicon
Sealant
around all
side
3/8/2022 7
Tank Chamber-02
Silicon Sealant
with cap
arrangement
Silicon
Silicon
Sealant
Sealant
around all
around all
side
side
Silicon
Sealant
around all
side
3/8/2022 8
Vent and Fill Line
Silicon
Sealant
around all
side
3/8/2022 9
Thank You