Pre Monsson-Checks for UST and

associated systems
Reliance BP Mobility Limited
Basic Tank Layout

3/8/2022 2
Tank Nozzle Details

Nozzle Nos. Nomenclature


M1 1 MANHOLE
N8 1 FILL PIPE FLANGE
N7 1 DIP PIPE FLANGE
N6 1 SPARE
N5 1 VENT
N4 1 ATG FLANGE
N3 1 STP CONNECTION FLANGE
N2 1 SUCTION FLANGE-2
N1 1 SUCTION FLANGE-1

3/8/2022 3
Minimum UST Points to confirm
S.No Nozzle/Associated Lines Monsoon Protection Provided (Yes/No) Date Any remarks

1 N1
2 N2
3 N3
4 N4
5 N5
6 N6
7 N7
8 N8
9 M1
10 DIP PIPE lock Position
11 ATG Pipe Gland Position
12 Any Puncture in Vent Line
13 Vent Line Flange in Tank Chamber
14 Gasket of all visible flanges should
not be damaged
15 ATG Cable conduit pipe in tank
chamber should be puff sealed
Note-Pont-14 need to be confirmed before application of Silicon sealant from NozzleN1-N8 and M1
RO Code-

RO Name-

Date of Execution-

Checked and confirmed by- RO Seal and Signature

3/8/2022 4
Damaged Gasket Vs Healthy Gasket Photo

3/8/2022 5
Damaged Vent Pipe Vs Healthy Vent Pipe Photo

3/8/2022 6
Tank Chamber-01

Silicon
Sealant
around all
side

3/8/2022 7
Tank Chamber-02

Silicon Sealant
with cap
arrangement

Silicon
Silicon
Sealant
Sealant
around all
around all
side
side

Silicon
Sealant
around all
side

3/8/2022 8
Vent and Fill Line

Silicon
Sealant
around all
side

3/8/2022 9
Thank You