01-09-2022 To 30-09-2022 KPTCL Scheduled Power Interruption For The Month of SEPTEMBER
01-09-2022 To 30-09-2022 KPTCL Scheduled Power Interruption For The Month of SEPTEMBER
Duration of LC request
Name of the Name of the KPTCL Name of the BESCOM Name of the BESCOM Date on which last
Sl no
KPTCL Circle Division Circle Division
Sub Division Name of the station/Line Feeder Date Time Reason for availing LC
LC was approved
Areas Affected Load Affected (MW) Wheather alteranate Power Supply Arranged or not Remarks Consent
F-14, Urban feeder, stringing of conductor between Loc. No. 02 & 03 required for
66/11kV Kanakapura
3 BRAZ Ramanagar Kanakapura F-5, IP feeder, 9/4/2022 9/4/2022 10:00 16:00 6:00 the work of SC line on DC towers from existing T.K Halli to
S/s
F-16 NJY Kanakapura line-2 to proposed 66/11kV Shivanhalli S/s
110/11KV MUSS
6 Tumkur K.B cross Tumkur K.B cross 9/5/2022 9/5/2022 10:00 16:00 6:00 Quarterly Maintenance Kadehalli, Dabbeghatta,Mavinkere, Gonitumkur, karadigere
Kadehalli
Construction of 66 kV SC Line on DC towers by using coyote
ACSR conductor from 220 KV SRS Davanagere to four pole
structure Chitradurga in the existing corridor of 66KV
7 Saraswathi Nagar 9/5/2022 9/5/2022 10:00 16:00 6:00 Davangere -Chithragurga SC Line-1 for adistance of 55.697 9/1/2022 Daba stop to Jayanagara Church back side,(Loc 4-8).
Davangere Davangere Davangere Davangere 66/11kV SRS
Kms in Davanagere/Chitradurga District and Buy back of
66kV Somanahalli- released materials on Total Turnkey Basis—Availing Line
Subramanyapura line 2 For
clearcarrying out periodical maintenance works as per
bay [66/11kV maintenance schedule for 2nd quarter. Load of 66/11kV
No load will be
8 BMAZ South Somanahally BMAZ[S] Kengeri, HSR Kaggalipura, 66/11kV 9/6/2022 9/6/2022 10:00 15:00 5:00 Kaggalipura, 66/11kV Shobha Forest view will be changed No load will be affected. No load will be affected.
affected.
Shobha Forest View] at over to 220kV Subramanyapura station. No load will be
220/66/11kV R/S, affected. Consent given for availing the LC on 06.09.2022
Somanahalli, Bengaluru.
66/11kv harihara-new,
9 Davanagere Davanagere Davanagere Davanagere Harihara 220kV SRS Davanagere 9/6/2022 9/6/2022 10:00 14:00 4:00 2nd Quarter maintenance 10
harihara-hospate Muss
Harihar-Hospet MUSS,
66/11kv harihara-new, Harihar-Hospet MUSS, Harihar city MUSS, 66kV Guttur MUSS &
10 Davanagere Davanagere Davanagere Davanagere Davangere Harihar city MUSS, 66kV 9/6/2022 9/6/2022 10:00 14:00 4:00 2nd Quarter maintenance 18.26
harihara-hospate Line Polyfibers
Guttur MUSS & Polyfibers Sannapapainahatti, Bhadrappana Thopu, Netranahally,
Marammanahally, Nerlahally, Sunkadarahatti, Kuntobainahatti,
Kappad Bande Hatti, Yenimegalahatti, Kengobainahatti,
Bosaiahnahatti, Jungli Surainahattikonasagara, Udevu,
11 Davanagere Hiriyuru Davanagere Hiriyuru Molakalmuru Konasagara_66 All Feeders 9/6/2022 9/6/2022 10:00 16:00 6:00 1&2nd quarterly maintenance work. 3.8
Kumbara Kaple, Chowdipura, Bhadrappana Thopu,
Netranahally, Sannapapainahatti, Nerlahally, Kuntobainahatti,
Odnobaianahatttichowdipura, Kumbara Kaple, Patri Male Kaple,
Ballaji Kaplekonasagara, Udevu
66/11KV MUSS Chowdanakuppe, Chikkonahalli, Akkimaripalya, R.Byadrahalli,
12 Tumkur K.B Cross Tumkur K.B Cross 9/6/2022 9/6/2022 10:00 16:00 6:00 Quarterly Maintenance
Chowdankuppe Hangarahalli, Ankanahalli, Neelasandra, Tavarekere, M.H Palya
Name of the Name of the KPTCL Name of the BESCOM Name of the BESCOM Date on which last
Sl no
KPTCL Circle Division Circle Division
Sub Division Name of the station/Line Feeder Date Time Reason for availing LC
LC was approved
Areas Affected Load Affected (MW) Wheather alteranate Power Supply Arranged or not Remarks Consent
F5 Mauneshwara, F6
CSD 1, CSD2 DCM, F7 G&S, F8 KTJ, F9 Iron pole Structure replacement work in 11kV Bank-2 & F5 Mauneshwara, F6 DCM, F7 G&S, F8 KTJ, F9 PJ, F10 CGH, F11
33 Davanagere Davanagere Davanagere Davanagere 66kV MUSS Davanagere 9/10/2022 9/10/2022 10:00 16:00 6:00 7
Davangere PJ, F10 CGH, F11 LF11, Bank-3 & providing released good breakers in 11kV Bank-3 LF11, F12 basaveshwara
F12 basaveshwara
F1-CIPSA,F2-Honnenahalli,F3-Haraluru,F5-Industrial,F6-KM
halli,F7-Carmobiles,F8-Hirehalli,F9-Maranayakanapalya,F10-
35 Tumkur Tumkur Tumkur Tumkur 66/11kV S/S Hirehalli 9/10/2022 9/11/2022 10:00 16:00 6:00 DP replacement work
Siddaganga mataF11-Raitharapalya,F12 Nandihalli NJY,F14
Ranevalves
Ramanagara For station maintenance works, Overhauling of 66kV 66kV Attibele Line, 66kV Samandur line, Areas feeding from No, but only Attibele S/S can switch over load from Anekal
37 Yerrandanahalli Ramanagara Chandapura 66/11kV Anekal 9/11/2022 9/11/2022 10:00 15:00 5:00 5/31/2022 38 MW
Circle isolators and other scheduled works at 66/11kV S/s Anekal Anekal S/S such as Anekal Town and its surrounding rural areas S/S to 220 kV Sarjapura Consent is given to avail LC on 11.09.2022,
Instead of 12.09.2022,,Duration for LC
Approved from 10:00 to 15:00 hours (5 Hours)
F5 Mauneshwara, F6
CSD 1, CSD2 DCM, F7 G&S, F8 KTJ, F9 Iron pole Structure replacement work in 11kV Bank-2 & F5 Mauneshwara, F6 DCM, F7 G&S, F8 KTJ, F9 PJ, F10 CGH, F11
41 Davanagere Davanagere Davanagere Davanagere 66kV MUSS Davanagere 9/11/2022 9/11/2022 10:00 16:00 6:00 7
Davangere PJ, F10 CGH, F11 LF11, Bank-3 & providing released good breakers in 11kV Bank-3 LF11, F12 basaveshwara
F12 basaveshwara
F1-Kolala,F2-Mavathur,F3-Byragundlu,F4-Chikkadoddavadi,F5-
Saggere,F6-Pathaganahalli,F7-Urdigere,F8-Katenalli,F9-
42 Tumkur Tumkur Tumkur Tumkur 66/11kV S/S Kolala 9/11/2022 9/11/2022 10:00 16:00 6:00 Antharasanahalli incoming line breaker overhaling
Yelachagere,F10Hanumanthagiri,F11-Vajanakurke,F12-
Construction of 66 kV SC Line on DC towers by using coyote Doddasaggere,F13-Chinnahalli
ACSR conductor from 220 KV SRS Davanagere to four pole
structure Chitradurga in the existing corridor of 66KV
43 Saraswathi Nagar 9/11/2022 9/11/2022 10:00 16:00 6:00 Davangere -Chithragurga SC Line-1 for adistance of 55.697 9/1/2022 Daba stop to Jayanagara Church back side,(Loc 4-8).
Davangere Davangere Davangere Davangere 66/11kV SRS
Kms in Davanagere/Chitradurga District and Buy back of
released materials on Total Turnkey Basis—Availing Line
clear
220 kV Guttur-Davangere- 220 kV Guttur-Davangere-
44 Davanagere Davangere Davanagere Davangere Davangere 1 Line, 66 kV Harihar- 1 Line, 66 kV Harihar- 9/12/2022 9/12/2022 10:00 16:00 6:00 NHAI Work - 16
Hospet & 66 kV Industrial Hospet & 66 kV Industrial
Chikkanakatte,Hirekandavadi,Gunjiganuru,B.Durga,Filter
66/11 kV MUSS All Feeders from the said
45 Davanagere Chitradurga 220 SRS Davanagere Chitradurga 220 SRS Holalkere 9/12/2022 9/12/2022 10:00 16:00 6:00 Quarterly maintenance work House,Kadur,Kotehal,Chikkandavadi,Chikkajajuru,Hireemmiganu 5.96
Chikkajuru MUSS
ru ,Arasanagatta ,K N Halli and surrounding areas.
Gyarhalli,T.B.Nagara,Muttugaduru,Kalghatta,Udegere ,Sirigere
66/11 kV MUSS All Feeders from the said Water
46 Davanagere Chitradurga 220 SRS Davanagere Chitradurga 220 SRS Holalkere 9/12/2022 9/12/2022 10:00 16:00 6:00 Quarterly maintenance work 5.43
Sasaluhalla MUSS works,Andanur,Dandiganahalli,Hireemmiganuru,Toppenahalli and
surrounding areas.
Neralagunte, Battaiahnahatti, Nayakanakere,
Yarmanchiahanahatti, Yarmanchenahatti, Katavvanahalli,
Karthikenahatti, Nerlagunte Kurabarahatti, Nerlagunte ,
47 Davanagere Hiriyuru Davanagere Hiriyuru Thallak Neralagunte_66 All Feeders 9/12/2022 9/12/2022 10:00 16:00 6:00 1&2nd quarterly maintenance work. 6
Battaiahnahatti Hosahalli, Marenahatti, N.Devarahalli,
Bheemanakerehosahalli, Marenahatti, N.Devarahalli,
Chowluru, Chikkachallur,
Bheemanakere, Oblapura,
Katavvanahalli, T.N.Kote, Melukote,
Karthikenahatti
Obanahalli. Doddchalluru, Doddagollarahatti, Hullikatte,
Chowluru Gate, Vishvanatha Pura, Choluru, Allapura, , T.N.Kote,
48 Davanagere Hiriyuru Davanagere Hiriyuru Challakere PR Pura_66 All Feeders 9/12/2022 9/12/2022 10:00 16:00 6:00 1&2nd quarterly maintenance work. 12
Oblapura, Chikkachallur, Obanahlli, Doddabeeranahalli,
Doddachallur
Ramanagara 100 MVA Transformer -2 Alternate power supply can be arranged through bus
49 TKHalli Ramanagara Ramanagara 9/13/2022 9/13/2022 10:00 15:00 5:00 Quarterly maintenance work 6/25/2022 No load effected
Circle at 220 kV R/S T K Halli coupler Consent is given to avail LC on 13.09.2022,
Duration for LC Approved from 10:00 to 15:00
hours (5 Hours)
Peak load-7MW,
2nd Quarterly/Half Yearly maintenance work of Incoming Devarabisanahalli,Adarsha,Sai Shrustii,Sterling Ascentia,Samvi J
HSR Layout & 66/11kV Global Tech Park Load change over-
50 BMAZ South HSR Layout South 9/13/2022 9/13/2022 10:00 14:00 4:00 Line, Power Transformers, 66kV PT, 66kV Main BUS, 66kV 2/24/2022 V Hotel Load Changeover-3MW
Koramangala S/s 3MW,
Breakers and Maintenance of 11kV Breakers
Load affected-4MW
Consent given for availing the LC on 13.09.2022
For carrying out periodical maintenance works as per
220kV Somanahalli-
maintenance schedule for 2nd quarter. Load of 220kV
BWSSB Tataguni line bay No load will be
51 BMAZ South Somanahally BMAZ[S] Kengeri 9/13/2022 9/13/2022 10:00 15:00 5:00 BWSSB Tataguni station may be fed from 220kV No load will be affected. No load will be affected.
at 220/66/11kV R/S, affected.
Vrushabhavathi through PGCIL Bidadi - Kumabalagodu Tuppadakkanahalli, Iynahalli, Matadajogihally, Siddainakote,
Somanahalli, Bengaluru.
station. No load will be affected. Kombehalli(G), Yarapothajogihalli, Gowdrahatti, Kampal Consent given for availing the LC on 13.09.2022
Devarahatti(B.G.Kere)Yarrenahalli, Tumkurnahalli,
RR Nagar,Rajaji Adavimallapura, Odnobainahatti, Nerlahally, Akhatti,
66/11 kV Kengeri satellite Consent given Peak load of the station is 12
52 BMAZ North NRS East,West,South nagar,Kengeri,Jayanag 9/13/2022 9/13/2022 10:00 15:00 5:00 Quarterly maintenance 9/20/2021 Areas feeding from 66/11kV Kengeri Sateelite Town S/s 10 Load changeover will be done by BESCOM
Town station Kudligarahatti, Sunkadrarahatti, Belavina Maradahatti MW, 05 MW load change over will be done by
ar,Vidhanasoudha Odnobainahatti, Kuntobainahatti, Badasuraianahatti, Marlahalli, BESCOM authority & about 7 MW load will be
affected during LC period
Muddainahatti, Gollara Nagenahatti, Adavil Obaina Kaple,
Gundlururayapura, Myasarahatti, Maliyammanhatti,
Sulenahalli, Kakpalaiahnahatti, Gundluru, Somenahalli,
53 Davanagere Hiriyuru Davanagere Hiriyuru Hiriyuru Hiriyur_66 All Feeders 9/13/2022 9/13/2022 10:00 16:00 6:00 1&2nd quarterly maintenance work. 10
Marlahalli, Yarrenahalli, Siddainakote, Iynahalli,
For carrying out periodical maintenance works as per Matadajogihalli, Tuppadakkanahalli Tanda, Yarapothajogihali,
66/11kV, Kampaldevarahatti, Tumkurlahalli.Rayapura, Mysarahatti,
maintenance schedule for 2nd quarter. Load on the Power
20MVA,12.5MVA Power Maliyamanahatti, Somenahalli, Sulenahalli, Gundluruhangal,
Transformer-1 can be taken over Power Transformer-2
Transformer-1&2 at Somenahally, No load will be
54 BMAZ South Somanahally BMAZ[S] Kengeri 9/14/2022 9/14/2022 10:00 15:00 5:00 through 11kV Bus coupler. No load will be Molakalmuru
affected. Town, Eddulabommanahatti, No load will be affected.
220/66/11kV R/S, Byrapura, Guddadahalli, Huchangidurgahangal, affected.
Load on the Power Transformer-2 can be taken over Power
KPTCL, Somanahalli, Tuppadakkanhali, Bommalinganhalli, Kommanapatti, Rangaina
Transformer-1 through 11kV Bus coupler, consequently. No Consent given for availing the LC on 14.09.2022
Bengaluru. Durga Dammbyrapura, Guddadahalli, Huchangidurga, Jayanthi
load will be affected.
Nagara
55 Davanagere Davanagere Davanagere Davanagere RSD Davangere Obajjihalli 66/11kv All 11kV feeders 9/14/2022 9/14/2022 10:00 16:00 6:00 2nd Quarter maintenance Obajjihalli
66KV Lines:and surrounding area 9
1.Madhugiri
2.Pulamaghatta
3.Koratagere 1& 2
All 11 KV Feeders of 4.Sira 1 & 2
56 Davanagere Davanagere Davanagere Davanagere Benkikere Sowlanga 9/14/2022 9/14/2022 10:00 16:00 6:00 2nd Quarter maintenance All 11 KV Feeders
5.Koratagere 1& 2 of Savalanga Station 5
Savalanga Station\
6.Nitrahalli
Downstream stations,
1. Madhugiri
Bank-I and II 66kV
&
220/66/11KV R/S 2. Badavanahalli
F1- Arenahally 66KV
57 Tumkur Madhugiri Tumkur Madhugiri 9/14/2022 9/14/2022 10:00 16:00 6:00 Quarterly Maintenance
Madhugiri 3. Hosakere
F2- Town 66kV
4. Medigeshi 66kV
F3-Nirantara Jyothi
5. I D Halli 66kV
F4-Bhoothanahally
Bank-I
6. and II & 66kV
Kodigenahalli
F5-Chinakavajra
F1-Rangapura
66/11 kV MUSS 7. Nitrahalli
58 Tumkur Madhugiri Tumkur Madhugiri 9/14/2022 9/14/2022 10:00 16:00 6:00 Quarterly Maintenance F6- D.V.Hally66kV
F2-kavanadala
Madhugiri (OLD) 8. Puravara 66kV
F8- Kambathnahally
F3-sidadaragallu
9. Pulamatta
F9- Siddapura66kV
F7-Jayanagara
10. Holavanahalli (Agri)
66kV
F10-Dabeghatta
F8-J.V.N
11. 220kV palya
Madhugiri power Transformer &2
66/11 kV MUSS F11-Jadegondanahalli
F10-koonahalli
59 Tumkur Madhugirii Tumkur Madhugirii 9/14/2022 9/14/2022 10:00 16:00 6:00 Quarterly Maintenance Bank-I and II &
F12-Timlapura
Badavanahally F11-Badavanahalli (Town)
F1-Rantavalalu
F4-dodderi
F2-Kotagaralahalli
F5-karpenahalli
F3-Basavanahalli
F6 chandragiri
Bank-I and II &F1-CHIKKAVALLI
F4-Sajjemmanahalli
66/11 kV MUSS F9-banagarahalli
66KV Lines
F2-HOLAVANAHALLY
60 Tumkur Madhugiri Tumkur Madhugiri 9/14/2022 9/14/2022 10:00 16:00 6:00 Quarterly Maintenance F9-Badigondanahalli
Pulamaghatta F12-Poojarahalli
MADHUGIRI
F3-THAGARIGHATTA-1
F5-Shivanagere
MIDEGESHI
F4-HULIKUNTE
F6-Thonachagondanahalli
PAVAGADA
F7-Kittagali L-1
F9-Suvarnamukki (NJY)
PAVAGADA
F8-B Betta L-2
F11-Godrahalli(NJY)
66/11 kV MUSS
61 Tumkur Madhugiri Tumkur Madhugiri 9/14/2022 9/14/2022 10:00 16:00 6:00 Quarterly Maintenance NAGALAMADIKE
F12-Kemenahalli(NJY)
Holavanahalli Y N HOSAKOTE
F5-SOMPURA
SHYLAPURA
F6-KODALAHALLI
NAGALAMADIKE
F7-B.D.PURA -1
Bank-I
F8-H.V and
NAGALAMADIKE
PalyaII & -2
220/66/11 kV R/S
62 Tumkur Madhugiri Tumkur Madhugiri 9/14/2022 9/14/2022 10:00 16:00 6:00 Quarterly Maintenance F1-K.T. HALLY
Downstream
F10-B.D.Pura stations:
(NJY)
Pavagada F2- DEVALAKERE
1.Shylapura 66KV
F4-
2.Y NVADANAKAL
Hosakote 66KV
F5- C. H. PALYA 66KV
3.Nagalamadike
F6-KOTAGUDDA
4.Lingadahalli 66KV
66/11 kV MUSS
63 Tumkur Madhugiri Tumkur Madhugiri 9/14/2022 9/14/2022 10:00 16:00 6:00 Quarterly Maintenance F7- MARIDASANAHALLY
5.Mangalawada 66KV
Shylapura
F8- BUDIBETTA
6.Pavadgada 66kv
F9-BELLIBATLU
7.Venkatapura 66Kv
F10- B.HOSAHALLY
8.Theriyur 66KV
F11-
9.12.5YETTINAHALLY
MVA Tr -1 & 2
F12- GUJJANADU
Duration of LC request
Name of the Name of the KPTCL Name of the BESCOM Name of the BESCOM Date on which last
Sl no
KPTCL Circle Division Circle Division
Sub Division Name of the station/Line Feeder Date Time Reason for availing LC
LC was approved
Areas Affected Load Affected (MW) Wheather alteranate Power Supply Arranged or not Remarks Consent
Bank-I and II -
F6-HANUMANTHANAHALLY
F7- BHIMANAKUNTE
From To From To Duration
F8-HOSADURGA
F9- DODDAHALLY
Bank-I
F10-S.N.and II -
HALLY
F-1 Hussenpura NJY
F11-HOSADURGA
66/11 kV MUSS Y.N F-2 Kodamodagu
F1-THIPAGANAHALLY
64 Tumkur Madhugiri Tumkur Madhugiri 9/14/2022 9/14/2022 10:00 16:00 6:00 Quarterly Maintenance F-3
Hosakote F2- Water Supply
Y N HOSAKOTE
F-4
F3- S.R
G T Pura
HALLY
INTEROCEAN
F4- JALOD 3MW
PGP 1MW
F5- STATION AUXLARY
66/11 kV MUSS Bank-I
PVP
F12-1MW and II -
BHIMANAKUNTE NJY
65 Tumkur Madhugiri Tumkur Madhugiri 9/14/2022 9/14/2022 10:00 16:00 6:00 Quarterly Maintenance F1-k k
Nagalamadike F-5 H hally
F-17Hosahalli
V Stone crusher
F2-Harasikere
F-6 B.K Hally
F4
F-7Manglawada
THIRUMANI
Bank-I
F5-Marurand II -
F-9 Bhupur
66/11 kV MUSS F-4
F-10Bommathanahalli
F6-Kirarlahalli
Valluru
66 Tumkur Madhugiri Tumkur Madhugiri 9/14/2022 9/14/2022 10:00 16:00 6:00 Quarterly Maintenance F-5
Mangalawada F-11Neelammanahalli
F7-Kannamadi
Ryapte
F-6
F-12Chikkanayakanahalli
F8-Hanumasagara
kodamodugu
F-7
F9-CPalavalli
K pura
F-8
F10-Byrapura
NJY Arasikere
F-9 Byadnur
F11-Uddagatte
67 Tumkur Madhugiri Tumkur Madhugiri 66/11 kV MUSS Pavagada 9/14/2022 9/14/2022 10:00 16:00 6:00 Quarterly Maintenance
F-10 Buddareddyhalli
Bank-I and II -
F-11 Ponnasamudra
F1-Chandrabhavi
F-12 KHB Colony
F2-Reddyhalli
F-1 Pavagada
F3-Medigeshi
F-2 C.K.Pura
68 Tumkur Madhugiri Tumkur Madhugiri 66/11 kV MUSS Midigeshi 9/14/2022 9/14/2022 10:00 16:00 6:00 Quarterly Maintenance
F4-Mallanayaknahalli
F-3 Gangasagara
F5-Hanumanthpura(NJY)
F6-Laxmipura(NJY)
69 Tumkur Madhugiri Tumkur Madhugiri 66/11 kV MUSS Hosakere 9/14/2022 9/14/2022 10:00 16:00 6:00 Quarterly Maintenance Bank-I and II -Related feeders
70 Tumkur Madhugiri Tumkur Madhugiri 66/11 kV MUSS I D halli 9/14/2022 9/14/2022 10:00 16:00 6:00 Quarterly Maintenance Bank-I and II -Related feeders
66/11 kV MUSS
71 Tumkur Madhugiri Tumkur Madhugiri 9/14/2022 9/14/2022 10:00 16:00 6:00 Quarterly Maintenance Bank-I and II -Related feeders
Kodigenahalli
Construction of 66 kV SC Line on DC towers by using coyote
F1-Kolkunte IP ACSR conductor from 220 KV SRS Davanagere to four pole
structure Chitradurga in the existing corridor of 66KV
F2-Giriyapura IP Jayanagara Church to Shakthi Nagar over head water tank,(Loc-8-
72 66/11kV Avaragere S/s DCM IP
F3-Kaidal 9/14/2022 9/14/2022 10:00 16:00 6:00 Davangere -Chithragurga SC Line-1 for adistance of 55.697 9/1/2022
Davangere Davangere Davangere Davangere 12)
Kms in Davanagere/Chitradurga District and Buy back of
F4-Hadadi IP
F5-Kalbande NJY released materials on Total Turnkey Basis—Availing Line
F6-Kukkuwada IP clear Kolkunte,Giriyapura, Kaidal, Hadadi, Kalbande,
Kukkuwada F8-Lokikere IP Kukkuwada, Lokikere ,Kanagondanahalli
73 Davanagere Davanagere Davanagere Davanagere Davanagere 9/15/2022 9/15/2022 10:00 16:00 6:00 Half Yearly Maintenance Work 10
66/11 Kv F9-Kanagondanahalli IP Matti, Nagarasanahalli,Hoovinamadu
F10-Matti IP Kollenahalli,Balluru,Kalkere And Surrounding Villages.
F11-Nagarasanahalli IP
66/11kV NJY
F12-Hoovinamadu
Kukkuwada,Shyagale,
F13-Kollenahalli NJY 66/11 kv Kukkuwada,Shyagale, thyavangi, santhebennur ,
74 Davanagere Davangere Davanagere Davangere Kukkuwada 220kV SRS Davanagere 9/15/2022 9/15/2022 10:00 14:00 4:00 2nd quarter maintenance 35
thyavangi, santhebennur
F14-Balluru NJY , Basavapattana Muss
Basavapattana Muss
F15-Kalkere NJY
78 Tumkur Madhugiri Tumkur Madhugiri 66/11 kV MUSS Sira 9/15/2022 9/15/2022 10:00 16:00 6:00 Quarterly Maintenance Bank-I and II -Related feeders
66/11kV MUSS
79 Tumkur Madhugiri Tumkur Madhugiri 9/15/2022 9/15/2022 10:00 16:00 6:00 Quarterly Maintenance Bank-I and II -Related feeders
Tavarakere
66/11 kV MUSS
85 Tumkur Madhugiri Tumkur Madhugiri 9/16/2022 9/16/2022 10:00 16:00 6:00 Quarterly Maintenance Bank-I and II -Related feeders
Bukkapatna
66/11 kV MUSS
86 Tumkur Madhugiri Tumkur Madhugiri 9/16/2022 9/16/2022 10:00 16:00 6:00 Quarterly Maintenance Bank-I and II -Related feeders
Kallambella
220/66/11KV hoody- Qaurterly Maintenance Work of transformers -1 and 11kV Load of transformer 1 is 10MW , TR2 is 11MW & TR3 is 7
87 BMAZ South Hoody East White field 9/17/2022 9/17/2022 10:00 15:00 4:00 2/5/2022 NGEF Estate (F-9 feeder , Gardacharpalya) 1 (one) Load change over will
MWbe , done by BESCOM MOM Enclosed.
31.5MVA trf-1 Switchgears 1.5MW load will be
1. During Transformer-1 LC, load will be catered through
1. To carry out Tan-Delta Test of Transformer-1, affected for 1.5 Hour Concurrence given
bus-coupler on Transformer-2 with 5MW load affected.
Transformer-2 and Transformer 3. during Transformer 1
2. During Transformer-2 LC , load will be catered through
2. To carry out quaterly/half yearly maintenance works of Kempapura,Agrahara L/o,Defence L/o,Fortune,A block ,Pai house, Maintenance work .
66/11kv Sahakarnagar bus-coupler on Transformer-3 with 4MW load change over
88 BMAZ NORTH HEBBAL North C8,C9,C4 sub division 9/17/2022 9/17/2022 10:00 15:00 5:00 Transformer Bays, 66kV Line Bays, 11kV Bus maintenance. 9/3/2022 Byatrayanapura , UAS layout , Telecom layout ,Milstone and 2. 24 MW load will be
muss from BESCOM and hence no load affected.
3. For carrying out IR test of all equipements like CT's, PT's, hiranandani appartement affected for 3 Hours
3.During Transformer-3 LC , load will be catered through
LA's, Transformers, 66kV Breakers, 11kV Breakers, Wall during 11kv Bus and Consent is given work can be taken
bus-coupler on Transformer-2 with 4MW load change over
entry bushings and 11kV Bus. Adugodi,Salapuria Tower,Big Bazar,Accenture,KMF 66kv Bus GOS
Peak load-20MW, from BESCOM and hence no load affected.
2nd Quarterly/Half Yearly maintenance work of Incoming maintenance
HSR Layout & 66/11kV Primal Tech Park Godown,Nanjappa Layout,New
12th block,7thBlock,11th mico road,Chikkalakshmi
Block,RGA Infrastructure 1 & 2,9th A Load change work.
over- 4.During 11kv Bus and 66kv Bus Gos maintenance , station
89 BMAZ South HSR Layout South 9/17/2022 9/17/2022 10:00 14:00 4:00 Line, Power Transformers, 66kV PT, 66kV Main BUS, 66kV 2/10/2022 Layout,Mahalingeshwara badavane,bangalore Load Changeover-2MW
Koramangala S/s block,9Th B block,Intel,Station auxillary. 2MW, load of 24MW will be affected for 3 hrs.
Breakers and Maintenance of 11kV Breakers consent is given for availing the LC on
dairy,Forum,Rangadasappa layout, Lakkasandra,Wilson Load affected-18MW
17.09.2022
Garden,Chinnayyana Palya,Chandrappa Nagara,Nimhans
Administrative block,Bande slum,Sunnakal Forum,Brundavana Peak load-33MW,
Jayanagara and 66/11kV Adugodi Sub- 2nd Quarterly/Half Yearly maintenance work of 66kV PT, 20-12-2021 Slum, NDRI-police quarters, 8th block, 7th block adugodi, NDRI Load change over-
90 BMAZ South HSR Layout South 9/17/2022 9/17/2022 10:00 15:00 5:00 Load Changeover-18MW
Koramangala Station 66kV Main BUS,31.5MVA Transformer-3 Only for Tr-3 NIANP, St Johj Hospital, 5th block industrial layout, Mico Bosch, 18MW,
JNC Sorronding, 5th Block KHB colony, Industrial Area 5th block, Load affected-15MW
Consent given for availing the LC on 17.09.2022
7th block khb colony, Industrial Area 3rd block, 8th to 11th main,
100MVA, 220/66kV Power For carrying out periodical maintenance works as per Industrial area 5th block, Koramangala 3rd, 4th, 5th, 6th Block,
Transformer-2 at maintenance schedule for 2nd quarter. Load of Transformer Maruthi nagara, Dabas colony, OLd Madivala,, Oracle, Madivala, No load will be
91 BMAZ South Somanahally BMAZ[S] Kengeri 9/17/2022 9/17/2022 10:00 15:00 5:00 No load will be affected.
NEERAGUNDA,ADRIKATTE,SRI No load will be affected.
220/66/11kV R/S, will be changed over to 150MVA Power Transformer-1&3 Chikka Adugodi, Krishna nagara Industrial Area, Davanam affected.
Somanahalli, Bengaluru and other 220kV Stations. No load will be affected. MATA,ALADAHALLI,HUNAVINODU,DODDAGHATTA,JANKAL,THA
Jewellers. Consent given for availing the LC on 17.09.2022
Construction of 220 kV DC line from proposed 220/66 kV NEGEKALLU,KANTAPURA,DEVAPURARA,MAJJANAHALLI,ATTIMA
Baguru , Neergunda,
Benkikere station to proposed 220/66 kV GE,HONNENAHALLI,DUGGAVARA,GULIHATTI,BOCHENAHALLI,S
Hosadurga,
Chitradurga Major Chitradurga Major Hosadurga & 220KV Line From 220KV Hosadurga(Madure) sub-station for a distance of 41.104 EERANAKATTE,RANGAPPA TEMPLE,S K
92 Davanagere Davanagere Halurameshwara & 9/17/2022 9/17/2022 11:00 16:00 5:00 38.9
Works Division Works Division Holalkere Benkikere to Hosadurga kms in Hosadurga Taluk, Chitradurga District.For providing HALLI,KENKERE,NAKIKERE,POOJARAHATTI ,MADADAKERE ,Ved
Madadakere All Feeders
double suspension
Construction /double
of 66 kV tension
SC Line on DCinsulators
towers byatusing
road coyote avathi Water works,Kappagere, Koratigere, Siddaramanagara ,
from the said MUSS
crossing in 4 Locations.
ACSR conductor from 220 KV SRS Davanagere to four pole Kanguvalli, Kellodu, Rangavvanahalli , Peelapura, Devigere,
structure Chitradurga in the existing corridor of 66KV Kobbaripete UrbanB.V.NagaraMavinkatteAttighatta AND
Jayanagara
SURROUNDING Church to Shakthi Nagar over head water tank,(Loc-8-
AREAS
93 66/11kV Avaragere S/s DCM 9/17/2022 9/17/2022 10:00 16:00 6:00 Davangere -Chithragurga SC Line-1 for adistance of 55.697 9/1/2022
Davangere Davangere Davangere Davangere 12)
Kms in Davanagere/Chitradurga District and Buy back of
released materials on Total Turnkey Basis—Availing Line
clear
66/11 kV
94 BMAZ WEST WEST WEST Hanumanthanagara 9/17/2022 9/17/2022 10:00 16:00 6:00 Maintenance works like tree trimming, jump works etc 9/16/2022 HANUMANTHANAGAR AND SURROUNDING AREAS
substation
66/11 kV
95 BMAZ WEST WEST WEST Hanumanthanagara 9/18/2022 9/18/2022 10:00 16:00 6:00 Maintenance works like tree trimming, jump works etc 9/16/2022 HANUMANTHANAGAR AND SURROUNDING AREAS
substation
Duration of LC request
Name of the Name of the KPTCL Name of the BESCOM Name of the BESCOM Date on which last
Sl no
KPTCL Circle Division Circle Division
Sub Division Name of the station/Line Feeder Date Time Reason for availing LC
LC was approved
Areas Affected Load Affected (MW) Wheather alteranate Power Supply Arranged or not Remarks Consent
31.5MVA power
transformer -02 of For attending hot spots at Transformer LV side and Bank-2 Aletrnative power supply for 4.1MW will be arranged and
99 BMAZ South GIS DIVISION North Peenya 2nd stage 9/18/2022 9/18/2022 10:30 15:30 5:00 Peenya industrial area 4MW MOM attached
Brindhavana side remaining 4.1MW have no alternative source.
220/66/11kV GIS station
Consent is given work can be taken
31.5MVA power
transformer -01 of Aletrnative power supply for 7.9MW will be arranged and
100 BMAZ South GIS DIVISION North Peenya 9/18/2022 9/18/2022 10:30 15:30 5:00 To avoid induction at bank-2 of 31.5 MVA transformer -02. Peenya industrial area 3MW MOM attached
Brindhavana remaining 3MW have no alternative source.
220/66/11kV GIS station
Consent is given work can be taken
Chitradurga Urban 220/66/11 kV MUSS SRS, All Feeders from the said
102 Davanagere Chitradurga 220 SRS Davanagere Chitradurga 220 SRS 9/18/2022 9/18/2022 10:00 14:00 4:00 Half Yearly maintenance work All 66KV Line Outgoing from the said MUSS. 168
and Rural Chitradurga MUSS
Peak load-21MW,
2nd Quarterly/Half Yearly maintenance work of 66kV PT, Wilson Garden, Hombegowda Nagara, Sampagi Nagara, J.C. road, Load Changeover-14.3MW, 66kV National college loads (Load
Jayanagar & Load changeover-14.3
104 BMAZ South HSR Layout South 66/11kV BMTC S/s 9/19/2022 9/19/2022 10:00 15:00 5:00 66kV Main BUS, 66kV Breakers and Maintenance of 11kV 10/21/2021 Shanti Nagar, BTS Road, Richmond Circle,Residency of 16MW) to be change over to 220kV NIMHANS R/S or to
Indiranagar MW
BUS. Road,sudhamanagara, K.H. Road 66kV Victoria S/s
66kV Kaggalipura- Load affected-6.7MW
Consent given for availing the LC on 19.09.2022
For carrying out periodical maintenance works as per
Somanahalli line bay And
maintenance schedule for 2nd quarter. Load of 66/11kV
66kV Kaggalipura-Shobha
Kaggalipura [Brigade Meadows] and 66/11kV Shobha Forest No load will be
105 BMAZ South Somanahally BMAZ[S] Kengeri Forest view line bay at 9/19/2022 9/19/2022 10:00 15:00 5:00 No load will be affected. No load will be affected.
View Sub-stations may be changed over to 220kV affected.
66/11kV Sub-station,
Subramanyapura station. And LC will be availed after
Kaggalipura [Brigade Consent given for availing the LC on 19.09.2022
completing the bay consequently. No load will be affected.
Meadows], Bengaluru.
66kV Kanakapura-T.K Basaveshwara nagar, Vijayanagar, Govindaraja Nagar,
Ramanagara Kamshipalaya, RPCJewellers
Layout, Binny
106 Kanakapura Ramanagara Kanakapura Halli Line-2, 66/11kV 9/20/2022 9/20/2022 10:00 15:00 5:00 Quaterly maintenance work & Transmission line 11/9/2021 Doddalahalli, GRT IPP & Layout, Prashant
sorrounding Nagar,
villages 9 NO Quaterly maintenance work
Circle
Doddalahalli S/s. Hosahalli vijaynagar, RPC layout, Service Road, Vijayanagar 7th Consent is given to avail LC on 20.09.2022.
Main to 13th Main, Ist Stage Thimmenahally, Part of MC Layout, Duration as 10:00 TO 15:00 hours.
Binny Layout, Marenahally Layout, Part of Vinayaka Layout, PC
Industrial Area, Kaveripura, Ranganathapura, KCG Ind. Area, During LC Period 21MW load will be affected after
NRS Consent given Peak load of the station is 40
107 BMAZ North NRS North 66/11 kV Vijayanagar 9/20/2022 9/20/2022 10:00 15:00 5:00 Quarterly maintenance 12/28/2021 Nanjappa Ind. Estate, Sunnadagodu, Selvam Industrial Estate, 21 rearranging of loads on other stations as per concerned
Division,Rajajinagar. MW, 22 MW load change over will be done by
Ballayana Kere, Syndicate Bank Colony, Kaveripura 1st Block, 2nd BESCOM officials. BESCOM authority & about 18 MW load will be
Block, 3rd Block, 5th Block, 6th Block, 7th Block, 8th Block, affected during LC period
Nagarbhavi 11th block, KHB Colony, HVR Layout, Syndicate Bank
Anagodu, RSD Colony and surrounding area, Siddaiah Puranika Road, Papaiah
108 Davanagere Davanagere Davanagere Davanagere Kadajji. 66/11kV All 11kV feeders 9/20/2022 9/20/2022 10:00 16:00 6:00 2nd Quarter maintenance Beturu, KHB
Garden Basavanal,
Colony,Nagarakatte
KHB Colony,kadajji
Magadiand surrounding
main road , Partvillages
of 7
Davanagere
Agrahara Dasara halli
Construction of 66 kV SC Line on DC towers by using coyote
ACSR conductor from 220 KV SRS Davanagere to four pole
structure Chitradurga in the existing corridor of 66KV
Jayanagara Church to Shakthi Nagar over head water tank,(Loc-8-
109 66/11kV Avaragere S/s DCM 9/20/2022 9/20/2022 10:00 16:00 6:00 Davangere -Chithragurga SC Line-1 for adistance of 55.697 9/1/2022
Davangere Davangere Davangere Davangere 12).
Kms in Davanagere/Chitradurga District and Buy back of
released materials on Total Turnkey Basis—Availing Line
Srinagara , hosakerehalli , pes engg college , veerbhadranagara ,
Jayanagar and RR clear Bank colony , Hanumanthnagara , girinagara , seetha circle ,
nagara (W1,W2,W6, vidhyapeeta circle , pramod layout , muneshwara block ,nagendra 08 MW load can be shifted on nearby stations by BESCOM at
110 BMAZ South Subramanyapura West & South 66/11kV Banashanakari 9/21/2022 9/21/2022 10:00 15:00 5:00 Periodic maintainance works 8/4/2021 45
W7 & S15 block , Bull temple Road , kathriguppe , Avalahalli ,Sterling the time of Line clear.
Subdivisions) apartment ,NTY Layout , Thyagarajanagara , Basavangudi , BSK
Consent given for availing the LC on 21.09.2022
3rd stage
Kanchipura,Kittidal,Kadavigere,Obbalapura,Vengalapura,N N
66/11 kV MUSS All Feeders from the said
112 Davanagere Chitradurga 220 SRS Davanagere Chitradurga 220 SRS Srirampura 9/21/2022 9/21/2022 10:00 16:00 6:00 Half Yearly maintenance work Katte,D K Katte,Shivanagara,J S Pura,C B Gere and the 4.08
Kanchipura MUSS
surrounding areas.
220kV Somanahalli-
For carrying out periodical maintenance works as per
Mylasandra line-1 bay at No load will be
117 BMAZ South Somanahally BMAZ[S] Kengeri 9/22/2022 9/22/2022 10:00 15:00 5:00 maintenance schedule for 2nd quarter. No load will be No load will be affected. No load will be affected.
220/66/11kV R/S, affected.
affected as both are source stations.
Somanahalli, Bengaluru.
Consent given for availing the LC on 22.09.2022
F1-Kandagallu IP
Shyagale F2-Kodihalli IP Kandagallu ,Kodihalli,Goniwada,Shyagale
118 Davanagere Davanagere Davanagere Davanagere Davanagere 9/22/2022 9/22/2022 10:00 16:00 6:00 Half Yearly Maintenance Work 5
66/11 Kv F3-Goniwada IP And Surrounding villages.
F4-Shyagale NJY
121 Davanagere Hiriyuru Davanagere Hiriyuru Hiriyuru Hariyabbe_66 All Feeders 9/22/2022 9/22/2022 10:00 16:00 6:00
220kV Somanahalli-
For carrying out periodical maintenance works as per
Mylasandra line-2 bay at No load will be
122 BMAZ South Somanahally BMAZ[S] Kengeri 9/23/2022 9/23/2022 10:00 15:00 5:00 maintenance schedule for 2nd quarter. No load will be No load will be affected. No load will be affected.
220/66/11kV R/S, affected.
affected as both are source stations.
Somanahalli, Bengaluru.
Consent given for availing the LC on 23.09.2022
220 KV R/s Nittur (220kV 110KV Gubbi, 110KV Kadaba, 110kV KG temple, 110kV Kallur,
126 Tumkur Tumkur Tumkur Tumkur 9/24/2022 9/24/2022 10:00 16:00 6:00 Half Yearly -01 maintenance
and 110kV side) 110kV Doddaguni, 110kV Somalpura and 220kV Nittur R/S
Name of the Name of the KPTCL Name of the BESCOM Name of the BESCOM Date on which last
Sl no
KPTCL Circle Division Circle Division
Sub Division Name of the station/Line Feeder Date Time Reason for availing LC
LC was approved
Areas Affected Load Affected (MW) Wheather alteranate Power Supply Arranged or not Remarks Consent
130 Tumkur Tumkur Tumkur Tumkur 110/11 KV S/s Kadaba 9/24/2022 9/24/2022 10:00 16:00 6:00 Half Yearly -01 maintenance F9-Bennur NJY..F10-DKhalli NJY, F11-BelavathaNJY
110/11 KV S/s KG
131 Tumkur Tumkur Tumkur Tumkur 9/24/2022 9/24/2022 10:00 16:00 6:00 Half Yearly -01 maintenance F6-Nagasandra NJY, F12-konanakere NJY
Temple
132 Tumkur Tumkur Tumkur Tumkur 110/11 KV S/s Ungra 9/24/2022 9/24/2022 10:00 16:00 6:00 Half Yearly -01 maintenance F5-CSpura NJY... F6-watersupply
110/11 KV S/s
134 Tumkur Tumkur Tumkur Tumkur 9/24/2022 9/24/2022 10:00 16:00 6:00 Half Yearly -01 maintenance 110kV doddaguni all 11kV feeders
Doddaguni
138 Tumkur Tumkur Tumkur Tumkur 66/11 KV S/s Ankasandra 9/24/2022 9/24/2022 10:00 16:00 6:00 Half Yearly -01 maintenance 66kV Ankasandra all 11kV feeders
F1-Thalekoppa,F2-Thonasanahally,F3-Ennekatte,F7-H palya,f9-
139 Tumkur Tumkur Tumkur Tumkur 66/11 KV S/s Chelur 9/24/2022 9/24/2022 10:00 16:00 6:00 Half Yearly -01 maintenance
madenahallyF10-Idakanahally
20 MVA Tr-1 , 12.5 MVA Tr-2, and 11KV feeders F1- Shivapura,
F2- Hagalawadi, F3- Manchaladore, F4- Hoovinakatte, F5-
140 Tumkur Tumkur Tumkur Tumkur 66/11 KV S/s Hosakere 9/24/2022 9/24/2022 10:00 16:00 6:00 Half Yearly -01 maintenance Kallanahally, F6-Hosakere, F7-ALILUGATTA, F8-BETTADAHALLY,
F9-KALINGANAHALLY, F10-SOMALAPURA, F11-GANESHAPURA,
F12-BANDIHALLI
66/11 KV S/s
142 Tumkur Tumkur Tumkur Tumkur 9/24/2022 9/24/2022 10:00 16:00 6:00 Half Yearly -01 maintenance F3-Mallasandra Town, F6-Gollahalli NJY and F9-KMF
Mallasandra
Ramanagara For station maintenance works, Tan Delta test of 66kV CT's
143 Yerrandanahalli Ramanagara Chandapura 66/11 kV Bommasandra 9/25/2022 9/25/2022 10:00 15:00 5:00 5/29/2022 All Areas and industries feeding from Bommasandra S/S 25 MW No
Circle and other scheduled works at 66/11kV S/s Bommasandra Consent is given to avail LC on
25.09.2022,Duration for LC Approved from
10:00 to 15:00 hours (5 Hours)
Duration of LC request
Name of the Name of the KPTCL Name of the BESCOM Name of the BESCOM Date on which last
Sl no
KPTCL Circle Division Circle Division
Sub Division Name of the station/Line Feeder Date Time Reason for availing LC
LC was approved
Areas Affected Load Affected (MW) Wheather alteranate Power Supply Arranged or not Remarks Consent
66 kv Antharasanahalli
2 CTAZ Tumkur choluru Hosakere line
All feeder 8/2/2022 8/2/2022 7:00 16:00 11hrs Constructoion 11kv DC line chelur,Hoskere ,Nandihalli,Hagalawadi
114 CTAZ K.B Cross 66/11KV S/s, Yediyuru, 8/2/2022 8/2/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
Gowribidanur-
stringing from tapping point to Tower no-02. Areas fed from
Doddaballapura-2 line and
281 CTAZ 8/2/2022 8/2/2022 9:00 16:00 7:00 66/11kV Thondebhavi and 11kV feeders F-15 Alkapura and Kurubarahalli surrounding areas and EHT consumer.
66kV Gowribidanur ACC
F-11
lin
66kV Kanakapura-
Chikkenahalli &
Quaterly maintenance work of Transmission line & Consent is given to avail LC on
283 Ramanagara Kanakapura Kanakapura Kanakapura Channapatna Line & 8/2/2022 8/2/2022 10:00 16:00 6:00 7/30/2022 Allimaranahalli, Chikkenahalli S/s & surounding Villages. 27 NO
Substations 02.08.2022
66/11kV Allimaranahalli
& Chikkenahalli S/s.
115 CTAZ K.B Cross 66/11KV S/s, Thippur 8/3/2022 8/3/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
116 CTAZ K.B Cross 66/11KV s/s, Nidasale 8/3/2022 8/3/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
HEGGERE,YEMMEHATTI, NALLIKATTE,
KOLAHAL NJY, HEGDEHAL, VIJAPUR, SHIVANAKERE, NANDIHALLI,
66/11 kV MUSS BHADURGATTA, ADAVIGOLLARAHALLI NJY, BHARAMASAGARA,
121 CTAZ Chitradurga Chitradurga Rural
Bharamasagara
8/3/2022 8/3/2022 10:00 16:00 6:00 Emergency Quarterly maintenance work 7/30/2022 PAMERAHALLI, KOGUNDE NJY, SKM INDUSTRIAL FEEDER
NO
& KODIHALLI
66 kv Antharasanahalli
4 CTAZ Tumkur All feeder 8/4/2022 8/4/2022 7:00 16:00 11hrs Constructoion 11kv DC line chelur,Hoskere ,Nandihalli,Hagalawadi
choluru Hosakere line
66/11KV S/s,
123 CTAZ K.B Cross 8/4/2022 8/4/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
Santhemavathur
Name of the Name of the KPTCL Name of the BESCOM Name of the BESCOM Date on which last
Sl no
KPTCL Circle Division Circle Division
Sub Division Name of the station/Line Feeder Date Time Reason for availing LC
LC was approved
Areas Affected Load Affected (MW) Wheather alteranate Power Supply Arranged or not Remarks Consent
66 kv Antharasanahalli
7 CTAZ Tumkur All feeder 8/6/2022 8/6/2022 7:00 18:00 11hrs Constructoion 11kv DC line chelur,Hoskere ,Nandihalli,Hagalawadi
choluru Hosakere line
66/11KV S/s,
126 CTAZ K.B Cross 8/6/2022 8/6/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
Kempanhalli
AIMANGALA,BARAMPURA,MARADIDEVIKERE,KOVERAHATTI,KAL
66/11 kv MUSS
127 CTAZ 8/6/2022 8/6/2022 10:00 16:00 7 hrs emergency quarterly maintainance work VATTI,I, MARADIHALL,
Aimangala
BURUJINAROPPA AND SURROUNDING AREAS
Load will be Taken on 220KV Nelaqmangala-1 line and Consent is given to Avail LC on
130 BRAZ DBPura BRC Kengeri Nelamangala 220KV Begur Line 8/6/2022 8/8/2022 11:00 16:00 5:00 Quarterly maintenance works of the station. 7/30/2022 No Load Affected
Nelamangala-2 Line 08.08.2022
31.5MVA power
Whitefield and transformer -02 of 2MW load will be affected and Alternative power suplly
131 BMAZ South GIS DIVISION East and South 8/6/2022 8/6/2022 13:00 16:00 3:00 Quarterly Maintenace work 7/30/2022 F14-Hoody 2MW MOM attached
indirangara 220/66/11kV ITI GIS arranged for remaining feeders from BESCOM
station
134 CTAZ Chitradurga Chitradurga Urban 66/11 kV MUSS J N KOTE 8/6/2022 8/6/2022 10:00 16:00 6:00 Emergency Quarterly maintenance work 7/30/2022 J N Kote,Gollanakatte,Pallavagere,J C halli and the surrounding areas. NO
For Carrying out Quarterly Maintenance work. Attending Whitefield, Gunjur, Ramgundanahalli, Kachmaranahalli, Varthur-
East circle , South Whitefield Division, 66/11kV
231 BMAZ SOUTH Hoody 8/6/2022 8/6/2022 10:00 15:00 5:00 hot spots observation on 31.5MVA Transformer-1 & 2 and 7/30/2022 gunjur main road, Alasahalli road, Balegere, Hagadur, 14 MW
Circle HSR, Koramangala Kachamaranahalli MUSS
66kV Divyashree Tech Park line. Madhuranagar, Trisul build tech
66kV Somanahalli-
For carrying out periodical maintenance works as per
ISCKON
O&M Division, maintenance schedule for 2nd quarter. Load of 66kV No load will be
289 BMAZ SOUTH Somanahally BMAZ[S] [Subramanyapura line-1] 8/6/2022 8/6/2022 10:00 16:00 6:00 7/30/2022 No load will be affected. No load will be affected.
BESCOM, Kengeri ISCKON station may be changed over to 220kV affected.
bay at 220/66/11kV R/S,
Subramanyapura station. No load will be affected.
Somanahalli, Bengaluru.
31.5MVA power
Whitefield and transformer -01 of 1) Quarterly Maintenace work . 2) For attending 2MW load will be affected and Alternative power suplly
290 BMAZ South GIS DIVISION East and South 8/6/2022 8/6/2022 10:00 13:00 3:00 7/30/2022 F-11 Devasandra 2MW MOM attached
indirangara 220/66/11kV ITI GIS Thermography observations arranged for remaining feeders from BESCOM
station
Ramanagara & Magadi & 66/11kV Tavarekere Tavarekere and Nelamangala Subdivision areas feeding from Consent is given to avail LC on
137 BRAZ Nelamangala 8/7/2022 8/7/2022 10:00 16:00 6:00 2nd Quarterly & Half Yearly maintenance work 7/30/2022 12MW No
Bangalore Rural Nelamangala Substation 66/11kV Tavarekere Substation 07.08.2022
Ramanagara & 66/11kV Kodigehalli Tavarekere and K4 Subdivision areas feeding from 66/11kV Consent is given to avail LC on
138 BRAZ Nelamangala Magadi & Kengeri 8/7/2022 8/7/2022 10:00 16:00 6:00 2nd Quarterly & Half Yearly maintenance work 7/30/2022 12MW No
Bangalore West Substation Kodigehalli Substation 07.08.2022
66/11kv Substation 11kV feeders Evacuating from 66/11kV Nelmangala Substation Consent is given to Avail LC on
140 BRAZ Nelamangala BRC Nelamangala 8/7/2022 8/7/2022 10:00 16:00 6:00 Second Quarterly and Annual maintenance 7/30/2022 18MW No
Nelmangala coming under Nelamangala and Dabaspet Subdivisions, BESCOM 07.08.2022
66/11kv Substation 11kV feeders Evacuating from 66/11kV Thyamagondlu Consent is given to Avail LC on
141 BRAZ Nelamangala BRC Nelamangala 8/7/2022 8/7/2022 10:00 16:00 6:00 Second Quarterly and Annual maintenance 7/30/2022 18MW No
Thyamagondlu Substation coming under Dabaspet Subdivisions, BESCOM 07.08.2022
31.5MVA power
Whitefield and transformer -03 of Alternative power suplly arranged for all feeders from
142 BMAZ South GIS DIVISION East and South 8/7/2022 8/7/2022 11:00 16:00 5:00 Quarterly Maintenace work 7/30/2022 Nil Nil MOM attached
indirangara 220/66/11kV ITI GIS BESCOM
station
143 CTAZ Benkikere Channagiri Kattige 8/7/2022 8/7/2022 10:00. 16:00 6:00 Quarterly maintenance works 7/30/2022 Kattige and IPP solar 20 MW & 2 MW 5 MW LC approval not issued since April
20 MVA power
transformer -03 of To carry out Quarterly Maintenace work and attending Alternate power arranged for 2.8 MW, remaining 3.1 MW
298 BMAZ South GIS DIVISION North N4 BESCOM 8/7/2022 8/7/2022 10:30 14:30 4:00 7/30/2022 F-11 (Bajaj packers) and F-9 (SLV Industrial area) 3.1 MW MOM attached Consent is given work can be taken
220/66/11kV Brindhavan Thermovision hotspots observation have no alternate source.
GIS station
During the time of LC, 16MW of load can be
F4 - New BEL Road
changed over to other stations by BESCOM
F5-MSR Ind. Estate
staff and 10MW load will be affected at RMV
Malleswaram,Jalah F8-ISRO & LG Halli
MUSS Consent is given work can be taken
alli,Hebbal Replacement of flashed over 66kV incoming line "R" Phase F9-IISC Layout Alternate supply will be arranged for around 13MW by
BMAZ North Only F12 feeder feeding to c9 sd
299 SRS Peenya, KPTCL Bangalore North Additional central 66/11kV RMV MUSS 8/7/2022 8/7/2022 11:00 15:00 4:00 current transfomrer and also for carrying out Yearly 7/30/2022 F12-Devinagara 10MW BESCOM O&M staff for the feeders which have change overs
Circle Also during LC period replacement of load change is possible from Attur
(C2,C6,C4,C9 Sub maintenance works F14-New feeder Chikkamarenahalli from other stations
flashedover CT and station maintenance work yelahanka Stn
division) Partial loads of the above mentioned feeder will be affected as per
will be carried out viz Bus GOS 6Nos, 11kv
BESCOM officials.
Switchgear, 66kV PT, 66kV CT, 66kV Breaker,
66kV IISc load will be affected
at 66/11kV RMV MUSS
10 CTAZ Davangere All 11kv feeders 8/8/2022 8/8/2022 10:30 16:00 7hrs 2nd quarter Maintainence surroud ing Obanhalli vilage
Duration of LC request
Name of the Name of the KPTCL Name of the BESCOM Name of the BESCOM Date on which last
Sl no
KPTCL Circle Division Circle Division
Sub Division Name of the station/Line Feeder Date Time Reason for availing LC
LC was approved
Areas Affected Load Affected (MW) Wheather alteranate Power Supply Arranged or not Remarks Consent
11 CTAZ Davangere All 11kv feeders 8/8/2022 8/8/2022 9:30 16:00 7hrs 2nd quarter Maintainence Surrounding attigere village
12 CTAZ Davangere All 11kv feeders 8/8/2022 8/8/2022 9:30 16:00 7hrs 2nd quarter Maintainence Surrounding angodu village
13 CTAZ Davangere All 11kv feeders 8/8/2022 8/8/2022 9:30 16:00 7hrs 2nd quarter Maintainence Surrounding Maykonda village Limits
15 CTAZ Davangere shyagnle MUS 8/8/2022 8/8/2022 10:30 14:30 4hrs Emergency maintainance work shyagnle MUS
145 CTAZ K.B Cross 66/11KV S/s, Jiddigere 8/8/2022 8/8/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
151 CTAZ Davangere Angodu Attigere 8/8/2022 8/8/2022 9:30 16:00 6:30 2nd quarter maintenance 7/30/2022 surrounding Attigere village
152 CTAZ Davangere Angodu Angodu 8/8/2022 8/8/2022 9:30 16:00 6:30 2nd quarter maintenance 7/30/2022 surrounding Angodu village
153 CTAZ Davangere Angodu Mayakonda 8/8/2022 8/8/2022 9:30 16:00 6:30 2nd quarter maintenance 7/30/2022 surrounding Mayakonda village limts
Peak load-24MW,
Replacement of old ERL make 11kV switchgears with New load changeover will
HSR Layout & 66/11kV Electronic City 10-08-2022 11kV DAS/SCADA compatible MEI make switchgears Electronic City Ph-2, Veersandra, Ananth Nagara, be arranged by LC may be availed, Interuption
238 BMAZ South HSR Layout South 8/8/2022 10:00 16:00 6:00 7/30/2022 Load Change Over-24MW GCW Work
Chandapura Ph-2 Sec-2 (Malgudi) S/s ( pertaining to Trf-1 i.e. Bank-1, F1, F2, F3, F4, F5, F6, F14 Doddanagamangala BESCOM as per paper notification to be given
along with Bus Coupler) MOM. No load will be
affected
220kV Nelamangala- For Quarterly Maintenance works & To clear the emergency No load will be 220kV Anchepalya have alternate feeding from 220kV Consent is given to avail LC on
300 Ramanagara Nelamangala Ramanagara Magadi 8/8/2022 8/8/2022 11:00 14:00 3:00 7/30/2022 ---
Anchepalya Jungles grown in the line corridor. affected Magadi receiving station. 10.08.2022
66 kv Antharasanahalli
16 CTAZ Tumkur All feeder 8/10/2022 8/10/2022 7:00 16:00 11hrs Constructoion 11kv DC line chelur,Hoskere ,Nandihalli,Hagalawadi
choluru Hosakere line
66/11KV S/s,
156 CTAZ K.B Cross 8/10/2022 8/10/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
Huliyurdurga
BOMMAKKANAHALLI,Kunaberu ,u Avalenahalli,
66/11 kv MUSS
158 CTAZ 8/10/2022 8/10/2022 10:00 16:00 7hrs emergency quarterly maintainance work Doddaghatta,Turuvanuru,kariyammanashetti,kotehatti,hunasekat
turuvanur
te,Pelaraharty, and the surrounding area
Name of the Name of the KPTCL Name of the BESCOM Name of the BESCOM Date on which last
Sl no
KPTCL Circle Division Circle Division
Sub Division Name of the station/Line Feeder Date Time Reason for availing LC
LC was approved
Areas Affected Load Affected (MW) Wheather alteranate Power Supply Arranged or not Remarks Consent
MADANAYAKANAHALLI,C G
66/11 kV MUSS
163 CTAZ Chitradurga Chitradurga Urban 8/10/2022 8/10/2022 10:00 16:00 6:00 Emergency Quarterly maintenance work 7/30/2022 HALLI,YELAVARTHI,MUDDAPURA,HOSAGOLLARAHATTY,RAYANAHALLI, NO
Madanayakanahalli
SURANAHALLY,INAHALLI AND SURROUNDING AREAS.
Bommakkanahalli, Kunabevu,Avalenahalli,Doddaghatta,
164 CTAZ Chitradurga Chitradurga Rural 66/11 kV MUSS Turuvanur 8/10/2022 8/10/2022 10:00 16:00 6:00 Emergency Quarterly maintenance work 7/30/2022 Turuvanur,Kariyammanahatti,Kotehatti,Hunasekatte,Pelarahatty and the NO
surrounding areas.
19 CTAZ Davangere Davangere 8/11/2022 8/11/2022 10:00 16:00 4hrs Emergency maintainance work 20kV SRS Davanagere
166 CTAZ Davangere RSD Davangere Kukkuwada 8/11/2022 8/11/2022 10:30 16:00 5:30 2nd quarter maintenance 7/30/2022 All 11kV Feeders emanating from Kukkuwada SS
169 CTAZ Benkikere Channagiri Tyavanagi 8/11/2022 8/11/2022 10:00 16:00 6:00 Quarterly maintenance works 7/30/2022
TLM Sub-Division,
171 CTAZ Davangere 220kV Guttur-DVG-1 Line 8/11/2022 8/11/2022 10:00 14:00 4:00 Emergency Maintenance work 7/30/2022 220kV SRS Davanagere
KPTCL,Davangere
Peak load-24MW,
Replacement of old ERL make 11kV switchgears with New load changeover will
HSR Layout & 66/11kV Electronic City 13-08-2022 11kV DAS/SCADA compatible MEI make switchgears Shakambari
Electronic CityNagara,
Ph-2, Pipe line road,
Veersandra, Ragavendra
Ananth Nagara,swamy matta, JP be arranged by LC may beonavailed, Interuption
239 BMAZ South HSR Layout South 8/11/2022 10:00 16:00 6:00 7/30/2022 Load Change Over-24MW LC request 11.08.2022 shall be
Chandapura Ph-2 Sec-2 (Malgudi) S/s ( pertaining to Trf-2 i.e. Bank-2, F7, F8, F9, F10, F11, F12, nagar 1st phase, 14th cross, Salarpuria Appt, nagarjuna Appt,
Doddanagamangala BESCOM as per paper notification to be given
considered.
F13) Puttenahalli area, Jayangara 8th Block, Jayanagara 5Th Block , MOM. No load will be
Jayangara 7th Block , ITI layout, SBI colony, Near RV dental, affected S6 Subdivision - F4 SARAKKI
college surroundings, 24th main, Behined LIC office , LIC colony, K
MUSS LOAD CAN BE SHIFTED TO
R Layout, Venkatadri Layout, JP nagar 5th Phase, Sai narsary
1) OLTC Overhauling of 66/11kV Transformers-1 and F5 JAYANAGAR MUSS. F13
Road, JP nagar 6th phase, 15th cross, 16th & 12th cross ,Adarsha Peak load-18MW,
periodic maintenance work. SARAKKI MUSS LOAD CAN BE
residency apt,Adarsha garden,Sindhura convention hall & Load change over- LC was requested on 18.05.2022, 15.06.2022
240 BMAZ South HSR Layout South HSR Layout 66/11kV Sarakki S/s 8/11/2022 8/11/2022 10:00 16:00 6:00 2)Quarterly Maintenance work of 66/11kV Transformers-2, 7/30/2022 Load Change Over-11MW SHIFTED TO ELITE F2 FEEDER.
surround,JP nagar Metro and surrounding,Indira Gandhi 11MW, but was not approved
66kV Isolators,66kV CT's & PT's. F2 SARAKKI MUSS LOAD CAN BE
circle,Aster hospital,15th
A.K.Ashram crossRoad,
Road, Devagowda underpass road,Actor
R.T.Nagar Sudeep
1st Block, Load affected-7MW
3)11kV Breaker maintanance SHIFTED TO RBI F1 FEEDER. NO
house surrounding,24th main Nandini
Thimmaiah Garden, Modi Garden, Military Area,hotel signal junction,Green
1. To carry out Maintenance work of incoming line, outgoing OTHER FEEDER C/O IS POSSIBLE
city hospital.Central mall, KR layout,Venkatadri
Veerannapalya,Lumbini Garden,BWSSB Sewage layout,Kalyani
line, Transformer Bays, 66kV bus Gos,11kV bus and (F1,F14,F6,F18)
Magnum road,DS palya,Vaishnavi
plant,Mariyannaplaya,Coffee boardTerrace apt, JP nagar-
breaker maintenance. 2nd,3rd,4th,5th phase,Marenahalli,Manjunath colony,Tank Bund Peak Load of Station is 26 MW, Load change over of 6MW
Shivajinagar L/O,Kempapura,Dasarahalli,maruthi L/O,Buvaneshwari S14 Subdivision - Change over
66/11kV Yellarbande 2. For attending Hotspot works. road,Bannerghatta
Manjunath road,Dollars
Nagar, Thimmiah layout,Kalyani
Road, Bhovi magnum
Colony, apt,
Mahaganapati shall be done by BESCOM to neighboring stations
305 BMAZ NORTH Hebbal East & North division & Hebbal 8/11/2022 8/11/2022 10:00 16:00 6:00 7/30/2022 nagar.BEL Corporate OfficeChankya L/O,Nagawara,M.S.Ramaiah 20 MW Consent is given work can be taken
arranged.
MUSS 3. For carrying out IR test of all equipements like CT's, PT's, Kalyani
Nagar, Krishna magnum.
Pushpanjali Apartment, Shivanahalli Park, Adarsha 1) 20MW of load will be effected for 7:30hrs during 66kV &
division North city,Thanisandra main road,Ashirwad nagar,amarjyothi
LA's, Transformers, 66kV Breakers, 11kV Breakers, Wall Nagar,Adarsha Layout,Unix Colony,Indira Nagar, Manjunath 11kV bus & PT maintainence
L/O,Rachen halli main road,Mestry palya,Royal enclave,Sri
entry bushings and 11kV Bus. Nagar, 3rd stage 1st Block0
rampura villageVHBCS L/O,,B-Nagar, Lakshmi
Veeranaapalya, Nagar,L/O, 17th
Jojappa
4. For conducting Tan-Delta. H.V.K.Layout, Kirloskar Colony, Karnataka Layout, Kamala Nagar,
cross Govindpura, veerannapalya Main Road, Byrappa L/O and
V.J.S.S.Layout,
surrounding areas Ward Office surrounding, Gruhalakshmi Layout
NRS 1st Stage, Nagapura, Mahalakshmi Puram, Mhodi Hospital Road, Most of the 11kV load will be changed over to
66/11 kV Mahalakshmi Quarterly maintenance work of 66kV Lines,Bus and 11kV During LC period,10MW of load will be changed over to other
306 BMAZ North NRS North Division,Rajajinagar 8/11/2022 8/11/2022 10:00 16:00 6:00 7/30/2022 Punjab National Bank, Hamsaleka Home Surrounding, 8 neighbouring stations and only 8MW load will F-26 SAI MANDIR RMU
Layout Bus bar isolator at 66/11kV Mahalakshmi Layout station. Stations by BESCOM
. Shankarmata, Pipe Line road, J.C.Nagar, Kurabaralli, Rajaji Nagar be affected during LC period.
2nd Block, E.S.I.Hoaspital. Kamala Nagar Main road,
Gruhalakshmi Layout 2nd Stage, Bovi Palya, Gelayara Balaga,
Mico Layout, G.D.Naidu Halli, West of chord road, Mahalakshmi
Layout, ESCON-Opp.SIT.road, B.N.E.S.College, BELL Apartment,
Sandal Soap Factory, Yeshvanth pura Indl.Area, Toyoto Show
room, Esteem Classic Apartment,Lumos Apartment.
Duration of LC request
Name of the Name of the KPTCL Name of the BESCOM Name of the BESCOM Date on which last
Sl no
KPTCL Circle Division Circle Division
Sub Division Name of the station/Line Feeder Date Time Reason for availing LC
LC was approved
Areas Affected Load Affected (MW) Wheather alteranate Power Supply Arranged or not Remarks Consent
173 CTAZ Benkikere Honnali Honnali 220/66/11KV 8/12/2022 8/12/2022 10:00 16:00 6:00 Quarterly maintenance work 7/30/2022 bidaragadde holemadapura govinakovi 3 MW No there was no approval for LC since April LC request on 12.08.2022 shall be
considered.
S6 Subdivision - F4 SARAKKI
MUSS LOAD CAN BE SHIFTED TO
F5 JAYANAGAR MUSS. F13
J.P nagar 2nd,3rd,4th,6th phases,Bannerghatta road,KR Layout Peak load-11MW,
SARAKKI MUSS LOAD CAN BE
1)OLTC Overhauling of 66/11kV Transformers-3 and 15th cross,Rose garden,Sarakki garden,JP nagar 1st Load change over- LC was requested on 18.05.2022, 15.06.2022
241 BMAZ South HSR Layout South HSR Layout 66/11kV Sarakki S/s 8/12/2022 8/12/2022 10:00 15:00 5:00 7/30/2022 Load Change Over-8.5MW SHIFTED TO ELITE F2 FEEDER.
periodic maintenance work phase,Sarakki gate,SBI colony,Sangam circle 47th 8.5MW, but was not approved
F2 SARAKKI MUSS LOAD CAN BE
cross,Jayanagar 8th block,Arya nagar,Jayanagar 4th & 5th block. Load affected-2.5MW
SHIFTED TO RBI F1 FEEDER. NO
OTHER FEEDER C/O IS POSSIBLE
66kV Somanahalli- (F1,F14,F6,F18)
T.K.Halli line. 1. For interchange of 66kV line bays at 66/11kV
Major Works Doddalahalli S/s and stringing of conductor from Loc No:01 Harobele, Kodhihalli, Kunur, Hukunda, Bijjalli, Hunasanahalli, S14 Subdivision - Change over
Transmission
307 Division, Ramanagara Kanakapura 66kV Kanakapura - Tk 8/12/2022 8/12/2022 10:00 16:00 6:00 to 04. 7/30/2022 Achalu, Doddalahalli, Honahaganahalli, Haluguru and 66kV Solar 60MW No Consent is given
arranged.
(Works) Circle
Ramanagara Halli Line 1 & 66kV 2. For removal of Jumps near 220kV T. K Halli station of plant at Doddalahalli substation
Kanakapura - TK Halli Kanakapura - Tk Halli Line1 & 2
Line 2
310 CTAZ Benkikere Channagiri 220kV Benkikere 8/12/2022 8/12/2022 11:00 16:00 5:00 7/30/2022 Benkikere and Malladihalli 66kV lines 25MW No
31.5MVA power
Whitefield and No load will be Alternative power suplly will be arranged for all feeders from
20 BMAZ South GIS DIVISION East and South transformer -02 of EPIP 8/13/2022 8/13/2022 14:00 16:00 2:00 To carry out Tan Delta Test and Quarterly Maintenace work 7/30/2022 No load will be affected. MOM attached
Koramangala affected. BESCOM
220/66/11kV GIS station
31.5MVA power
Whitefield and No load will be Alternative power suplly will be arranged for all feeders from
21 BMAZ South GIS DIVISION East and South transformer -01 of EPIP 8/13/2022 8/13/2022 10:00 13:00 3:00 To carry out Tan Delta Test and Quarterly Maintenace work 7/30/2022 No load will be affected. MOM attached
Koramangala affected. BESCOM
220/66/11kV GIS station
24 CTAZ Davangere Davangere 8/13/2022 8/13/2022 10:30 16:00 4hrs Emergency maintainance work Yarangunta MUSS& Deavanngere MUSS
66 kv Antharasanahalli
26 CTAZ Tumkur All feeder 8/13/2022 8/13/2022 7:00 18:00 11hrs Constructoion 11kv DC line chelur,Hoskere ,Nandihalli,Hagalawadi
choluru Hosakere line
31.5MVA power
Whitefield and 1MW load will be affected and Alternative power suplly
27 BMAZ South GIS DIVISION East and South transformer -03 of EPIP 8/14/2022 8/14/2022 10:00 13:00 3:00 To carry out Tan Delta Test and Quarterly Maintenace work 7/30/2022 EPIP area 1MW MOM attached
Koramangala arranged for remaining feeders from BESCOM
220/66/11kV GIS station
175 CTAZ Benkikere Channagiri Devarahalli 8/14/2022 8/14/2022 10:00 16:00 6:00 Quarterly maintenance work 7/30/2022 Devarahalli.Nuggihalli. Neethigere.Ganghuru.Gullehalli 8MW
176 CTAZ Benkikere Channagiri Goppenahalli 8/14/2022 8/14/2022 10:00 16:00 6:00 Quarterly maintenance works 7/30/2022 Pandomatti, Goppenahalli and sorrounding areas 15 MW No
Name of the Name of the KPTCL Name of the BESCOM Name of the BESCOM Date on which last
Sl no
KPTCL Circle Division Circle Division
Sub Division Name of the station/Line Feeder Date Time Reason for availing LC
LC was approved
Areas Affected Load Affected (MW) Wheather alteranate Power Supply Arranged or not Remarks Consent
179 CTAZ Benkikere Channagiri Nallur 8/14/2022 8/14/2022 10:00 16:00 6:00 Quarterly maintenance works 7/30/2022 Nallur 4 MW No
66 kv Antharasanahalli
28 CTAZ Tumkur All feeder 8/16/2022 8/16/2022 7:00 16:00 11hrs Constructoion 11kv DC line chelur,Hoskere ,Nandihalli,Hagalawadi
choluru Hosakere line
110/11 Kv S/s
180 CTAZ K.B Cross 8/16/2022 8/16/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
HUNASEGHATTA
182 CTAZ K.B Cross 110/11 Kv s/S TIPTUR 8/17/2022 8/17/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
220/66/11KV R/S,
183 CTAZ K.B Cross 8/17/2022 8/17/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
Anchepalya
66/11KV S/s,
184 CTAZ K.B Cross 8/17/2022 8/17/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
Sanabaghatta
66/11KV S/s,
185 CTAZ K.B Cross 8/17/2022 8/17/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
Thimmasandra
100MVA Power
Devanahalli Taluk, Kundhana ,Doddabelavangala,D.Cross Consent is given to Avail LC
187 BRAZ DBPura BRC Kengeri Nelamangala Transformer-1 NRS 8/17/2022 8/17/2022 10:00 16:00 6:00 Quarterly maintenance works of the station. 7/30/2022 70MW No
Doddaballapura and local areas on17.08.2022
DBPura,
Name of the Name of the KPTCL Name of the BESCOM Name of the BESCOM Date on which last
Sl no
KPTCL Circle Division Circle Division
Sub Division Name of the station/Line Feeder Date Time Reason for availing LC
LC was approved
Areas Affected Load Affected (MW) Wheather alteranate Power Supply Arranged or not Remarks Consent
66/11 kV Shoba Indra Quarterly Maintenance works of station equipments at During LC Period 1.3MW load will be affected as per
318 BMAZ North NRS North, West Vidhana Soudha 8/17/2022 8/17/2022 10:00 16:00 6:00 7/30/2022 Global mall, Sobha Indraprastha Apartment 1.3 LC may be availed
prastha Station 66/11kV Sobha Indraprastha Substation concerned BESCOM officials.
Bannerghatta may
66kV Somanahalli-Jigani For carrying out periodical maintenance works as per
be changed over to
line-2 bay [Somanahalli- maintenance schedule for 2nd quarter.Load of 66/11kV
O&M Division, Bannerghatta may be changed over to 220kV Station, Jigani or 220kV Station, Jigani Bannerghatta may be changed over to 220kV Station, Jigani
319 BMAZ SOUTH Somanahally BMAZ[S] Bannerghatta] at 8/17/2022 8/17/2022 10:00 16:00 6:00 Station, Bannerghatta may be changed over to 220kV 7/30/2022
BESCOM, Kengeri load of 66/11kV Station Bannerghatta may be affected. or load of 66/11kV or load of 66/11kV Station Bannerghatta may be affected.
220/66/11kV R/S, Station, Jigani or load of 66/11kV Station Bannerghatta
Station Bannerghatta
Somanahalli, Bengaluru. may be affected.
may be affected.
Somenahalli,Shrirampura,Neralakere,Kabbala,Ballalasamudra,Gar
32 CTAZ Chitradurga Srirampura 66/11 kV MUSS Garga 8/18/2022 8/18/2022 10:00 16:00 6:00 Emergency Quarterly maintenance work 7/30/2022 ga,Belaguru,Kodihalli,Kalkere,Thonachenahalli,Gavirangapura. NO
And the surrounding areas.
33 CTAZ Davangere All 11kv feeders 8/18/2022 8/18/2022 10:30 16:00 7hrs 2nd quarter Maintainence Au Tiv Feeders emana tng rom Shyagae Ss
195 CTAZ Davanagere Davanagere Harihara 66/11 kv Harihara 8/18/2022 8/18/2022 10:00 16:00 7hrs Quaterly maintenance works Harihara town
110/11 Kv S/s
196 CTAZ K.B Cross 8/18/2022 8/18/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
MAYASANDRA
197 CTAZ K.B Cross 110/11 KV S/s KARADI 8/18/2022 8/18/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
GN KERE,BUKKASAGARA,
198 CTAZ 66/11 kv MUSS Mathod 8/18/2022 8/18/2022 10:00 16:00 7hrs emergency quarterly maintainance work
MATHOD,NAGATIHALLI, ME NASINODU,MATHOD URBAN,D T
VATTI, VAJRA AND THE SURROUNDING AREAS
200 CTAZ Guttur Division Harihara 66/11KV Harihara 8/18/2022 8/18/2022 10:00 16:00 6:00 Carryingout 2nd Quarter Maintenance 7/30/2022 Harihara Town
201 CTAZ Davangere RSD Davangere Shyagale 8/18/2022 8/18/2022 10:30 16:00 5:30 2nd quarter maintenance 7/30/2022 All 11kV Feeders emanating from Shyagale SS
203 CTAZ Benkikere Channagiri Kundur 8/18/2022 8/18/2022 10:00 16:00 6:00 Quarterly maintenance works 7/30/2022 Hanumanahalli , kunduru, Koolambi, Singatgere,
G.N
KERE,BUKKASAGARA,MATHOD,NAGATIHALLI,MENASINODU,MA
206 CTAZ Chitradurga Srirampura 66/11 kV MUSS Mathod 8/18/2022 8/18/2022 10:00 16:00 6:00 Emergency Quarterly maintenance work 7/30/2022 NO
THOD URBAN,D T VATTI,VAJRA AND THE SURROUNDING
AREAS.
Kanchipura,Kittidal,Kadavigere,Obbalapura,Vengalapura,N N
66/11 kV MUSS
207 CTAZ Chitradurga Srirampura 8/18/2022 8/18/2022 10:00 16:00 6:00 Emergency Quarterly maintenance work 7/30/2022 Katte,D K Katte,Shivanagara,J S Pura,C B Gere and the NO
Kanchipura
surrounding areas.
Name of the Name of the KPTCL Name of the BESCOM Name of the BESCOM Date on which last
Sl no
KPTCL Circle Division Circle Division
Sub Division Name of the station/Line Feeder Date Time Reason for availing LC
LC was approved
Areas Affected Load Affected (MW) Wheather alteranate Power Supply Arranged or not Remarks Consent
210 CTAZ Davanagere Davanagere Hiriyuru Hiriyur_220/66/11 8/18/2022 8/18/2022 10:00 16:00 6:00 1&2nd quarterly maintenance work. 7/30/2022 All 66/11KV station coming undder Hiriyur Nodal 270MW generation NO
20 MW solar
211 CTAZ Davanagere Davanagere Hiriyuru Bharamagiri_66 8/18/2022 8/18/2022 10:00 16:00 6:00 1&2nd quarterly maintenance work. 7/30/2022 All areas pertaining to Bharamagiri station generation and 10 NO
MW station load
HOSAKOTE , 66/11kV S/s Industries near Kondasapura ,Bidrahalli , Consent is given to Avail LC
322 BRAZ BIAL BRAZ 8/18/2022 8/18/2022 10:00 16:00 6:00 For quarterly maintenance work of 66/11KV Kondasapura 7/30/2022 30 NO
AVALAHALLI Kondasapura Medahalli,Kanamangala ,Bhatrahalli on18.08.2022
36 CTAZ Guttur Division Harihara 66/11kV MUSS Nandigudi 8/19/2022 8/19/2022 10:00 16:00 6:00 Carryingout 2nd Quarter Maintenance 7/30/2022 All Feeders & NJY connected to 66/11kV MUSS Nandigudi
Caryingout 2nd
212 CTAZ Harihara 66/11kv Nandigudi 8/19/2022 8/19/2022 10:00 16:00 7hrs Al Feeders& NY connected to 66/11kV MUSS Nandigudi
Quarter Maintenance
214 CTAZ Davanagere Davanagere Harihara 66/11kv Bennuvalli 8/19/2022 8/19/2022 10:00 16:00 7hrs Quaterly maintenance works All feeders and NJY connected to 66/11kv MUSS Bennvalli
110/11 Kv S/S
215 CTAZ K.B Cross 8/19/2022 8/19/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
THANDAGA
217 CTAZ Guttur Division Harihara 66/11kV MUSS Banuvalli 8/19/2022 8/19/2022 10:00 16:00 6:00 Carryingout 2nd Quarter Maintenance 7/30/2022 All Feeders & NJY connected to 66/11kV MUSS Banuvalli
Name of the Name of the KPTCL Name of the BESCOM Name of the BESCOM Date on which last
Sl no
KPTCL Circle Division Circle Division
Sub Division Name of the station/Line Feeder Date Time Reason for availing LC
LC was approved
Areas Affected Load Affected (MW) Wheather alteranate Power Supply Arranged or not Remarks Consent
66/11 kV MUSS
42 CTAZ Chitradurga Challakere Rural 8/20/2022 8/20/2022 10:00 16:00 6:00 Emergency Quarterly maintenance work 7/30/2022 HOSAKALLAHALLI and Balenahally Surrounding Areas. NO
Balenahally
12MW of stations
43 CTAZ Davanagere Davanagere Hiriyuru Challakere_66 8/20/2022 8/20/2022 10:00 16:00 6:00 1&2nd quarterly maintenance work. 7/30/2022 Challakere town, Nannivala village, VD halli and Duggavara village NO
load
08MW of stations
Shivaganga, Amblagere, Bhagavathi, Siddeshwara, Obenahally,
44 CTAZ Davanagere Davanagere Challakere Rangenahally_66 8/20/2022 8/20/2022 10:00 16:00 6:00 1&2nd quarterly maintenance work. 7/30/2022 load and generation NO
Byadarahally.
of 16MW
110/11 Kv S/S
219 CTAZ K.B Cross 8/20/2022 8/20/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
THALAKERE
66/11KV S/s,
220 CTAZ K.B Cross 8/20/2022 8/20/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
Honnenahalli
66/11 kv MUSS
222 CTAZ 8/20/2022 8/20/2022 10:00 16:00 7hrs emergency quarterly maintainance work HOSAKALLAHALL and Balenahaly Surrounding areas .
balenahalli
150MVA, 220/66kV Power For carrying out periodical maintenance works as per
O&M Division, Transformer-1 at maintenance schedule for 2nd quarter. Load of Transformer No load will be
245 BMAZ SOUTH Somanahally BMAZ[S] 8/20/2022 8/20/2022 10:00 16:00 6:00 7/30/2022 No load will be affected. No load will be affected.
BESCOM, Kengeri 220/66/11kV R/S, will be changed over to 150MVA Power Transformer-3 and affected.
Somanahalli, Bengaluru 100MVA Power Transformer-2. No load will be affected.
F-8- Ragigudda,
F2- BPO unit,
F4- swagath Main road,
Jayanagar 66/11 KV Jayanagara GIS To carry out Condition Monitoring works on GIS Modules (2 Aletrnative power supply for 12MW will be arranged and
246 BMAZ South GIS DIVISION SOUTH 8/20/2022 8/20/2022 10:00 16:00 6:00 7/30/2022 F5-Hanamantappa RMU, 6MW MOM attached
Divisioon staton line bays+2 Transformer bays+ 1 PT bay) Brenton Road, Shobha pearl, ICICI bank, Embassy heights, remaining 6MW have no alternative source.
F6-Geetha Colony,
Abharan
F9-KK Road,jewells, Herban life, RMZ, Ashok nagar, Garudamall, Air
Force
F14- RVHosp. ,Dommaluru, Austin Town, Vivek nagar, Trinity
Teachers.
Church, Vijaj bank, Hotel Taj,Victoria layout, Museum Road,
1. Periodical Maintenance work of 66kV EDC line, 3x20MVA
Albert street, king street, Museum cross road, Lavelle road, St.
Tr's, Bus GOS, line GOS, 66kV Breakers, 66kV CT's and Peak load=25.0MW LC request on 20.08.2022 shall be
Koramangala, mark road, Y.G.Palya, KSRP, ITC hotel, Richmond road,
66kV PT's. Load Change LC was requested on 04.06.2022, but was not considered.
326 BMAZ South HSR Layout South & East Indiranagar and 66/11kV Austin Town S/s 8/20/2022 8/20/2022 10:00 16:00 6:00 7/30/2022 Vannerpet, Life Style, M.G.Road, Hayes Road, Convent Road, Load Change over=15MW by BESCOM
2. Periodical Maintenance work of 11kV switchgears over=15MW approved
Jayanagar S.L.Apartment, Richmond Town, Najappa circle, Stain garden,
3. Attending Hot line observations. Load affected= 10MW Change over arranged,
Richmond Park, Longford Road, Braight street, Foodworld road,
Johnson
220kV market,
Lines BWSSB
,All 66kV water lines,
outgoing supply, longford road,
F2-Swandenahalli, F3-
Ashoknagar,
Yellapura, F4.Shopper stop, Markam road, brigade road, commerce
college, , Richmond circle, Vittal malya road, Siddaiah
Handtool,FSNavilahalli,F6-Urkere,F7-Melehalli, road, wood
F8-Hebbaka, F9.
220 KV R/s street, castle strreet,
Bugudanahalli, Neelasandra,
F10-Industrial Anepalya, Bunglow,F12-KIADB,
Area,F11-DC BMRCL.
45 CTAZ 8/21/2022 8/21/2022 10:00 16:00 8hrs For Quarterly maintenance works 30 MW
Antharasanahalli F13-KIADB
Industrial area, F14-Narasapura, F15-Sathyamangala, F16-
Fitwell, F17-Indo
auto F20-KG Palya, F21-Tudalayout
220kV PGCIL Line, 220kV Madhugiri Line, 66kV TMTP O/G line,
11kv F1&F12
220/66/11kV R/s KIADB
46 CTAZ 8/21/2022 8/21/2022 10:00 16:00 8hrs For Quarterly maintenance works Station Auxiliary, F2- TMEIC, F7-Chamundi, F8-Sharada, F9, F10- 10mw
Vasanthanarasapura
mahalakshmi,
F11-Vigneshwara
F2,F3,F4-TMTP1,F5-TMTP2,F6-TMTP3,F7-TMTP4,F8-TMTPS,F9-
47 CTAZ 66/11KV S/s TMTP 8/21/2022 8/21/2022 10:00 16:00 8hrs For Quarterly maintenance works TMTP6,F10 &F11 0
66/11kV Chandrappa Tavarekere Subdivision areas feeding from 66/11kV Chandrappa Consent is given to avail LC on
49 Ramanagara Nelamangala Ramanagara Magadi 8/21/2022 8/21/2022 10:00 16:00 6:00 2nd Quarterly & Half Yearly maintenance work 7/30/2022 12MW No
Circle Circle Substation 21.08.2022
10MW of stations
Budurukunte, Kalamarahally , Siddeshwara,Belagere, Goralattu,
51 CTAZ Davanagere Davanagere Challakere Kalamarahally_66 8/21/2022 8/21/2022 10:00 16:00 6:00 1&2nd quarterly maintenance work. 7/30/2022 load and generation NO
Siradarakapile
of 28MW
150 MW (220/66kV
220kV R/S Malur along To attend critical hotspots in 220kV Bus-1&2 selector 66/11kV Downstream Stations of Malur R/S)
Alternate power supply can be arranged for downstream
with its connected 66kV isolators and also for re-conditioining of 220kV Bus-1&2 1. 220/66kV Malur R/S, 150MW(220/66kV Consent is given to Avail LC on
249 BRAZ Malur Kolar KGF 8/21/2022 8/21/2022 10:00 16:00 6:00 7/30/2022 stations of 220/66kV Sarjapura & VTP R/S from
downstream sub-stations selector isolators of 220kV Bus coupler Bay and Quarterly 2. 220/66kV Sarjapura R/S & Sarjapura & VTP R/S 21.08.2022
Yerandahally & HSR Layout Stations
and 220kV Bus-1&2 Maintenance 3. 220/66kV VTP R/S )
Total=300MW
Name of the Name of the KPTCL Name of the BESCOM Name of the BESCOM Date on which last
Sl no
KPTCL Circle Division Circle Division
Sub Division Name of the station/Line Feeder Date Time Reason for availing LC
LC was approved
Areas Affected Load Affected (MW) Wheather alteranate Power Supply Arranged or not Remarks Consent
66kV Kaggalipura-Shoba
For carrying out periodical maintenance works as per
Forest View line bay at
O&M Division, maintenance schedule for 2nd quarter. Load of 66/11kV No load will be
252 BMAZ SOUTH Somanahally BMAZ[S] 66/11kV Sub-station, 8/21/2022 8/21/2022 10:00 16:00 6:00 7/30/2022 No load will be affected. No load will be affected.
BESCOM, Kengeri Shobha Forest View Sub-stations may be changed over to affected.
Kaggalipura [Brigade F8 ITI Aux and F-21 AKM BALLET total load of 5 MW can be
220kV Subramanyapura station. No load will be affected.
Meadows], Bengaluru. shifted to 31.5 MVA TRf No:1
Renovation and Following works will be carried out :
Feeders affected are: 7 MW
Modernization works at 1) Cable Laying, glanding and termination
F3 EPIP -1
220/66/11kV Receiving 2) Testing & Commissioning of yard side
F7 Kundalahalli
Station, Hoody, Bangalore 3) Relay Testing SAS integration of the line equipments and
Transmission O&M Whitefield Division F8 RHB Colony Concurrence given by AEE E-7 and
253 400kv SSC Division East Taluk, Bangalore 8/21/2022 8/30/2022 9:00 16:00 7:00 Charging 7/30/2022 7 MW Alternate arrangement shall be made by BESCM authorities
(Works) Circle East BESCOM F14 Manipal Hospital E-12 Sub-division
Urban District on Total
F16 MS L&T
Turnkey Basis
F22 Boruka Tech Park
Partial load on 31.5MVA Transformers will be affected Consent is given work can be taken
F23 Bushra Tech Park
Vidhana Soudha 31.5 MVA TRf No:2 during the above shut down period. 5 Robertson Block 100 % Change
F24 BEL Tower Hotel
Division (W-4 & W- F11 Phoenix Mall Over from NRS F 28, 'A' Station F3
During LC Period 20MW load will be affected after
East and North 5 Sub-division) and To carry out quarterly maintenance work of attending 20MW load will be affected after changeover of and NRS F 25 feeder
254 BMAZ North NRS 66/11 kV 'A' Station 8/21/2022 8/21/2022 10:00 16:00 6:00 7/30/2022 Areas feeding from 66/11kV A station 20 rearranging of loads on other stations as per concerned
Circle Malleshwaram hotspots at 66/11kV A Station loads to other stations. F6 Brahma Pura 100 % Change
BESCOM officials.
Division (C-1 & C-2 Over from NRS F 11, Brigade F3
Sub-division) feeder.
F5 Robertson Block
53 CTAZ Davanagere Davanagere Harihara 66/11kv Karaberehalli 8/22/2022 8/22/2022 10:00 16:00 7hrs Quaterly maintenance works Dittur
RR Nagar,Rajaji
nagar,Kengeri,Jaya 66/11 kV Sir M V Layout LC request on 22.08.2022
55 BMAZ North NRS East,West,South 8/22/2022 8/22/2022 10:00 16:00 6:00 Quarterly maintenance 7/30/2022 Areas feeding from 66/11kV Sir, M V Layout S/s 15 Load changeover will be done by BESCOM LC may be availed shall be
nagar,Vidhanasoud station considered.
ha
S6 Subdivision - F4 RBI MUSS
LOAD CAN BE SHIFTED TO F4
KHODAYS MUSS. F1 FEEDER RBI
RBI layout,Kottanur,J.P Nagar 5th phase,Shreyas colony,Gaurav
MUSS LOAD CAN BE SHIFTED TO
HSR and nagara,Nataraja layout,Nrupathunga nagar,Jambusavare 07 MW load can be shifted on nearby stations by BESCOM at
56 BMAZ South Subramanyapura South 66/11kV RBI 8/22/2022 8/22/2022 10:00 16:00 6:00 Periodic maintainance works 7/30/2022 20 Previous date of Station LC was on 08.03.2022 F2 SARAKKI MUSS. F13 FEEDER
Jayanagara dinne,Chunchughatta,Brigade Millenium & Briagde Gardenia the time of Line clear.
RBI MUSS LOAD CAN BE SHIFTED
appartments and areas surrounding the sub-station.
TO F2 ELITE MUSS. NO OTHER
FEEDER IS POSSIBLE FOR C/O
(F2,F5,F12,F14,F15,F16)
Dittur, vataganahalli, sarathi, Chikkabidare, kondajji and S14 Subdivision- Change over
57 CTAZ Guttur Division Harihara 66/11KV Kurubarahalli 8/22/2022 8/22/2022 10:00 16:00 6:00 Carryingout 2nd Quarter Maintenance 7/30/2022 arranged,
surrounding area
12 MW of station load
F5-Purlahalli, F6-Jajur, F7-Baramsagara, F8-Ranikere, Total 25
58 CTAZ Davanagere Davanagere Hiriyuru Dyavarnahally-66 8/22/2022 8/22/2022 10:00 16:00 6:00 1&2nd quarterly maintenance work. 7/30/2022 and generation of NO
villages
around 16MW
Peak load-24MW,
Replacement of old AREVA make 11kV switchgears with load changeover will
66/11kV Electronic City
24-08-2022 New 11kV DAS/SCADA compatible MEI make switchgears Electronic City Ph-1, Hongasandra, Bommanahalli Main Road, be arranged by LC may be availed, Interuption
255 BMAZ South HSR Layout South HSR Layout Ph-2 Sec-1 (Velankani) 8/22/2022 10:00 16:00 6:00 7/30/2022 Load Change Over-24MW GCW Work
( pertaining to Trf-1 i.e. Bank-1, F1, F2, F3, F4, F5, F11 NGR Layout BESCOM as per paper notification to be given
S/s
with Bus Coupler) MOM. No load will be
affected
110/11 KV S/s
60 CTAZ K.B Cross 8/23/2022 8/23/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
TURUVEKERE
30MW of Stations
All areas pertaining to Hangal, Rampura and Nagasamudra
62 CTAZ Davanagere Davanagere Hiriyuru Hangal_66 8/23/2022 8/23/2022 10:00 16:00 6:00 1&2nd quarterly maintenance work. 7/30/2022 Load and Generation NO
stations
of around 56MW
66kV T.K.Halli-Iggaluru
Line. Consent is Given to avail LC on
1. 66/11kV Akkurmole-15MW,
23.08.2022.( Note: if any exams &
Major Works 2. 66/11kV Iggalur-12MW,
Ramanagara (i) 66kV T.K Halli – Iggalur Releasing and restringing of conductor between Loc No:38 to (i)-31 MW emergency programs comes near to
258 BRAZ Division, Ramanagara 8/23/2022 8/23/2022 10:00 16:00 6:00 7/30/2022 3. 66kV EHT M/s CNNL at Iggalur-6MW --
Maddur line 43 (ii)-18MW that date I,e 23.8.2022 , the LC
Ramanagara 1. For carrying out replacement of jump connecting between 4. 66/11kV Yethambadi-3.2MW
(ii) 66kV T.K Halli – date should change /postpone to
Akkurmole line line isolator and breaker limb(Rph) in 220kV Malur another date )
incoming at 220kV R/s Sarjapura.
2. Attending Hot line observations in 220Kv incoming line
breaker and mainteance works of 11kv Switchgears 1. 220/66/11KV R/S, Sarjapura
220/66/11KV R/S, 3.To carryout alignment work of 66Kv Bus B isolators of 2. 66/11kV Dommasandra substation Consent is given to avail LC on
259 BRAZ Yerrandanahalli Ramanagara Chandapura 8/23/2022 8/23/2022 10:00 16:00 6:00 7/30/2022 45 MW No
Sarjapura 100MVA Tr-2 5. Some of the Sarjapura , dommasandra and Attibele Local & 23.08.2022
3. for conducting IR and PI tests on 2X100MVA surrounding Areas
transformers and 2X20MVA transformers at 220kV
Sarjapura Station.
4. To carryout 2nd quarterly maintenance works on all lines
and Equipments at 220KV Sarjapura All areas feeding from following station will be effected:
220kV R/s BIAL &
Hosakote ,Nandagu For quarterly maintenance work of 220kV R/s BIAL and its 1)66/11kV Vidyangar Consent is given to Avail LC on
260 BRAZ BIAL BRAZ Downstream stations 8/23/2022 8/23/2022 10:00 16:00 6:00 7/30/2022 80 NO
di,Devanhalli down stream 2)66/11kV Budigere 23.08.2022
EHT-BIAL-1&2 ,ITC
Duration of LC request
Name of the Name of the KPTCL Name of the BESCOM Name of the BESCOM Date on which last
Sl no
KPTCL Circle Division Circle Division
Sub Division Name of the station/Line Feeder Date Time Reason for availing LC
LC was approved
Areas Affected Load Affected (MW) Wheather alteranate Power Supply Arranged or not Remarks Consent
67 CTAZ Davanagere Davanagere Harihara 66/11kv Devarabelekere 8/24/2022 8/24/2022 10:00 16:00 7hrs Quaterly maintenance works Devarabelekere,kadlegundi,salakatte,mudahadodi,
68 CTAZ Davanagere Davanagere Harihara 66/11kv Malebennur 8/24/2022 8/24/2022 10:00 16:00 7hrs Quaterly maintenance works Malebennur
110/11 Kv S/s
69 CTAZ K.B Cross 8/24/2022 8/24/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
BANDIHALLI
72 CTAZ 66/11 kv MUSS nergunda 8/24/2022 8/24/2022 10:00 16:00 7hrs emergency quarterly maintainance work NergundaAdrkatte, ShriMATA,Aladahali and the surrounding areas
ISRO Layout, ISRO layout Ind. Area, Kumarswamy layout, Vittal S5 Subdivision- out of 11 feeders,
220kV Jayanagara(S5 04 MW load can be shifted on nearby stations by BESCOM at
77 BMAZ South South 66/11kV ISRO Layout 8/24/2022 8/24/2022 11:00 15:00 4:00 Periodic maintainance works 7/30/2022 nagara, Vikram nagar, Ilyaznagar, Yelchenahalli, surrounding 15 Previously LC approved on 26.05.2022 (f3, f4, f6, f7, f8, f10, f11, f12 )8
Subramanyapura Subdivision) the time of Line clear.
area. feeders no change over can be done
,3 feeders change over can be done
isro F2-Spura F4 , Isro F5-Spura
F6, isro F9 -spura F8
78 CTAZ Guttur Division Harihara 66/11KV Devarabelakere 8/24/2022 8/24/2022 10:00 16:00 6:00 Carryingout 2nd Quarter Maintenance 7/30/2022 Devarabelakere Kadlegundi salakatte, mudahadadi Mittalakatte
Channasamudra,Kappagere,Koratigere,Madhure,Kanguvahalli,Kell
79 CTAZ Chitradurga Hosadurga 66/11 kV MUSS Hosdurga 8/24/2022 8/24/2022 10:00 16:00 6:00 Emergency Quarterly maintenance work 7/30/2022 odu,Hagalagere,Rangavalli,Pilapura,Devigere,Vedavathi,B V NO
Nagara, Mavinakatte palya, Attighatta and the surrounding areas.
HSD
80 CTAZ Chitradurga Hosadurga 66/11 kV MUSS Bagur 8/24/2022 8/24/2022 10:00 16:00 6:00 Emergency Quarterly maintenance work 7/30/2022 Exp,Illapura,Bagur,Hebballi,Sanihalli,Srirangapura,Anival,HSD NO
RURAL and surrounding areas.
NRS Sunkadakatte, Kamakshipalya, Malathahalli, Niligiri thopu, Most of the 11kV load will be changed over to
66/11 kV Srigandhakaval Quarterly maintenance work of 66kV Lines,Bus and 11kV During LC period,10MW of load will be changed over to other
263 BMAZ North NRS North Division,Rajajinagar 8/24/2022 8/24/2022 10:00 16:00 6:00 7/30/2022 Hegganahalli, Annapoorneshwarinagara, Pattegarpalya, 2 neighbouring stations and only 2MW load will
MUSS Bus bar isolator at 66/11kV Srigandhakaval station. Stations by BESCOM
. Kottigepalya, Kengunte. be affected during LC period.
Name of the Name of the KPTCL Name of the BESCOM Name of the BESCOM Date on which last
Sl no
KPTCL Circle Division Circle Division
Sub Division Name of the station/Line Feeder Date Time Reason for availing LC
LC was approved
Areas Affected Load Affected (MW) Wheather alteranate Power Supply Arranged or not Remarks Consent
110/11 Kv S/s
86 CTAZ K.B Cross 8/25/2022 8/25/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
KEREKODI
87 CTAZ K.B Cross 66/11KV S/s, Hebbur 8/25/2022 8/25/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
All 66KV Stations from SRS and 11 kV Peedere Fed from SRS
Nagara ,kelagotte bank colony ,gONURU , belagatta, O R
66/11 kv MUSS SRS & SS
88 CTAZ Chitradurga 8/25/2022 8/25/2022 10:00 16:00 7hrs emergency quarterly maintainance work halli ,vidhyanagara , seebar, CG Halli , JC badavane , chandravally
division chitradurga
, PK HALLY, MILL AREAS
kwssb UNIVERSITY
All 66KV Stations from SRS and 11 KV Feeders Fed from SRS,
NAGARA,KELAGOTE,BANK COLONY,GONURU,BELAGATTA,G R
220/66/11 kv SRS &SS
89 CTAZ Chitradurga Chitradurga Urban 8/25/2022 8/25/2022 10:00 16:00 6:00 Emergency Quarterly maintenance work 7/30/2022 Halli,VIDHYANAGARA,SEEBAR,C G HALLY,JCR NO
Division Chitradurga
BADAVANE,CHANDRAVALLY,P K HALLY,MILL
AREA,KWSSB,UNIVERSITY
Peak load-24MW,
Replacement of old AREVA make 11kV switchgears with load changeover will
66/11kV Electronic City
27-08-2022 New 11kV DAS/SCADA compatible MEI make switchgears Electronic City Ph-1, Hongasandra, Bommanahalli Main Road, be arranged by LC may be availed, Interuption
264 BMAZ South HSR Layout South HSR Layout Ph-2 Sec-1 (Velankani) 8/25/2022 10:00 16:00 6:00 7/30/2022 Load Change Over-24MW GCW Work
( pertaining to Trf-2 i.e. Bank-2, F6, F7, F8, F9, F10, F12, NGR Layout BESCOM as per paper notification to be given
S/s
F13) MOM. No load will be
affected
110/11 Kv S/s
92 CTAZ K.B Cross 8/26/2022 8/26/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
NONAVINAKERE
Name of the Name of the KPTCL Name of the BESCOM Name of the BESCOM Date on which last
Sl no
KPTCL Circle Division Circle Division
Sub Division Name of the station/Line Feeder Date Time Reason for availing LC
LC was approved
Areas Affected Load Affected (MW) Wheather alteranate Power Supply Arranged or not Remarks Consent
f1-ThalikoppaF2-Thonasanahally'F3-EnnekatteF4-Irksandra
FS-Town FeederF6- Jalaguni
F7-H palyaF8-Nimbaekatae
269 CTAZ 66/11KV Cheluru 8/27/2022 8/27/2022 10:00 16:00 8hrs Q2/Half Yearly Maintenance works F9- MadenahallyF10-Idakanahally 10mw
F11-C HarivaesandraF12 Water SupplyF13 NJY NallurF14 NJY
KodiyalaF15-NJY S
HALLI
Ankasandrapanchyat limits
F1-Gangayanapalya, F2-Kuntaramanahalli, F3-Nirantara
Jyothi,F4-Idle, F5-
270 CTAZ 66/11KV Ankasandra 8/27/2022 8/27/2022 10:00 16:00 8hrs a2/Half Yearly Maintenance works 14mw
Kallugudi, F6-Ankasandra, F7-Ranganahally, F8- ByadarahallyF9-
Devarahally, F10-
Sarigepalya,F11- Yarabally
271 CTAZ 66/11KV Hoskere 8/27/2022 8/27/2022 10:00 16:00 8hrs Q1/ 1st Half Year Maintenance F1,F2,F3,F4,F5,F6,F7,F8F9,F10,F11,F12 25mw
273 CTAZ 66/11KV Nandihalli cross 8/27/2022 8/27/2022 10:00 16:00 8hrs Q1/ 1st Quarter Maintenance F1 F2 F3 F4 4mw
110/11 Kv S/s
225 CTAZ K.B Cross 8/29/2022 8/29/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
GUNGURUMALE
19MW of stations
104 CTAZ Davanagere Davanagere Hiriyuru Nagasamudra_66 8/30/2022 8/30/2022 10:00 16:00 6:00 1&2nd quarterly maintenance work. 7/30/2022 All areas pertaining to Nagasamudra and Rampura stations. load and generation NO
of 32MW
110/11 Kv S/s
227 CTAZ K.B Cross 8/30/2022 8/30/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
AMMASANDRA
110/11 Kv s/s
228 CTAZ K.B Cross 8/30/2022 8/30/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
KADEHALLY
105 CTAZ K.B Cross 110/11kv S/s C.N.Hali 9/7/2022 9/7/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
110/11KV S/s
106 CTAZ K.B Cross 9/7/2022 9/7/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
THIMANAHALLY
110/11KV S/s
107 CTAZ K.B Cross 9/7/2022 9/7/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
HANDANAKERE
110/11KV S/s
108 CTAZ K.B Cross 9/7/2022 9/7/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
SHETTIKERE
110/11KV S/s
109 CTAZ K.B Cross 9/7/2022 9/7/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
Kathrikehal
110 CTAZ K.B Cross 110/11 Kv S/s Huliyar 9/7/2022 9/7/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
110/11 kv S/s
111 CTAZ K.B Cross 9/9/2022 9/9/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
HONAVALLI
112 CTAZ K.B Cross 66/11KV S/s Dasudi 9/14/2022 9/14/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance
113 CTAZ K.B Cross 110/11KV S/s Halkurke 9/23/2022 9/23/2022 10:00 16:00 7hrs Q2/ 1st Half Year Maintenance