Architectural Online Internship 2022: Realizations and Gratitude

“Temporary setbacks are overshadowed by persistence.” is a quote by Quentin


L. Cook that I encountered just now which immediately resonated within me. I, myself,
am not new to failure. I have been consistently beaten up by the systems and the
standards that I have been wanting to meet ever since I was young, and it had given
quite an impression on me ever since, but nothing compares to when I entered college.
I thought I was equipped with everything that I needed to know but I was wrong. There
are indeed things that I needed to know, and this lecture has been going on for too long
until now that I can still remember every bit of it.

Interior Design is a course that have been challenging me ever since I entered
university. I have experienced things I didn’t even think I would, but I did, and I have
been enjoying it ever since. I have always known that I wanted a career that is related to
construction. I think this is the sole reason why I still enjoyed the internship in
Architecture even when I have already done it a few weeks back. The design and
construction industry are a force to be reckoned with, it’s not easy. But at the end of
every week with the stress of drafting, and brainstorming, and designing, I realize that I
still am enjoying it, nonetheless. Although experiencing all these online, work still felt
fulfilling and enjoyable although I still feel I would have learned more and enjoyed more
if it occurred in an actual office. My knowledge in hotels, condos, and restaurants are
few of the things that I could boast about because I have encountered projects such as
these before and learning quite a few things about office planning was a breath of fresh
air. In addition, work felt nice because I got to work with wonderful people in Simbulan.
They were too kind to me, and I have nothing but great gratitude to them.

VALDEZ, Jhanniedheille Anne F.


2015-05791-MN-0
BS Interior Design 4-1
OJT PORTFOLIO
Jhanniedheille Anne F. Valdez
BS Interior Design 4-1
ARCHITECTURE
A B C D E F G H I J K L M

DRYING AREA
SLOP SINK

12 EE ROOM

MALE TOILET FEMALE TOILET


CONFERENCE ROOM AREA; 13 SQM AREA; 13 SQM
MEETING AREA PANTRY
AREA; 24 SQM
CEO
OPEN BELOW EXECUTIVE OFFICE EXECUTIVE COO OFFICE
OFFICE OFFICE
DN

15 100MM

PRODUCTION TEAM
PAINT BOOTH 1 AREA; 94 SQM
POWDER PAINT BOOTH 2 LIFT
COATING 2000x3000
STORAGE
ROOM LIFT
2000x3000 MATERIAL AND FINISHES
SHOWROOM

ENTRY
ENTRY

22 SUPPLY AND CHAIN


DEPARTMENT

PLANNING & DESIGN


DEPARTMENT

23 LOUNGE AREA

OPERATIONS
DEPARTMENT

UPHOLSTERY

24 OPEN BELOW

PAINT STAGING AREA


PREPARATION

LOUNGE AREA

OPEN BELOW
25

ENGINEERING
DEPARTMENT

26 FINANCE DEPARTMENT

27

SGC OFFICE
1 MASTER KEY PLAN
-- SCALE 1:250 MTS

ARCHITECT/ENGINEER: PROJECT TITLE: OWNER: DRAWN: JAV SHEET CONTENTS: REVISIONS: SHEET NO.
R.G. SIMBULAN THIS DRAWING IS FOR INFORMATION
ONLY TO BE USED BY THE ARCHITECT DATE: 11/09/2022
& PARTNERS --
OR THE GENERAL CONTRACTOR.
IT IS THE SOLE PROPERTY OF
SGC OFFICE --
FINANCE DEPARTMENT
Architects Engineers ARCHITECT R.G. SIMBULAN AND PARTNERS AND
CANNOT BE REPRODUCED WITHOUT
CHECKED: NRL MASTER KEY PLAN LAYOUT
--
Interior Designers PRC : -- ISSUED ON: -- WRITTEN PERMISSION. REP. ACT 545
DATE: 11/09/2022
PTR : 2616717 ISSUED AT: -- LOCATION: SAN RAFAEL, BULACAN ADDRESS: SAN RAFAEL, BULACAN
400 9731 400
2431 200 5800 200 1100

OPERATIONS
DEPARTMENT

5047
5245
9216

2631 1465 2144 3491

9616
400
400
3571

LOUNGE AREA

4172
ENTRY

2431 1700 2109

6240 400 3091

400 9731 400


OPERATIONS DEPARTMENT
1 FLOOR PLAN LAYOUT
-- SCALE 1:50 MTS

ARCHITECT: PROJECT TITLE: OWNER: DRAWN: JAV SHEET CONTENTS: REVISIONS: SHEET NO.
R.G. SIMBULAN THIS DRAWING IS FOR INFORMATION
ONLY TO BE USED BY THE ARCHITECT DATE: 11/08/2022
& PARTNERS CORP. --
OR THE GENERAL CONTRACTOR.
IT IS THE SOLE PROPERTY OF
SGC OFFICE --
OPERATIONS DEPARTMENT
Architects Engineers ARCHITECT R.G. SIMBULAN AND PARTNERS AND
CANNOT BE REPRODUCED WITHOUT
CHECKED: NRL FLOOR PLAN LAYOUT
--
Interior Designers PRC : -- ISSUED ON: -- WRITTEN PERMISSION. REP. ACT 545
DATE: 11/08/2022
PTR : 6007658 ISSUED AT: -- LOCATION: SAN RAFAEL, BULACAN ADDRESS: SAN RAFAEL, BULACAN
7453 150 2021 150 1400
2939 4515

2150

3080
3215

921
9

1650
1485
8831
200

400
3931

FINANCE

3701
DEPARTMENT
400

400
ENTRY
5928 1500 3896 500

11824 400

FINANCE DEPARTMENT
1 FLOOR PLAN LAYOUT
-- SCALE 1:50 MTS

ARCHITECT: PROJECT TITLE: OWNER: DRAWN: JAV SHEET CONTENTS: REVISIONS: SHEET NO.
R.G. SIMBULAN THIS DRAWING IS FOR INFORMATION
ONLY TO BE USED BY THE ARCHITECT DATE: 11/08/2022
& PARTNERS CORP. --
OR THE GENERAL CONTRACTOR.
IT IS THE SOLE PROPERTY OF
SGC OFFICE --
FINANCE DEPARTMENT
Architects Engineers ARCHITECT R.G. SIMBULAN AND PARTNERS AND
CANNOT BE REPRODUCED WITHOUT
CHECKED: NRL FLOOR PLAN LAYOUT
--
Interior Designers PRC : -- ISSUED ON: -- WRITTEN PERMISSION. REP. ACT 545
DATE: 11/08/2022
PTR : 6007658 ISSUED AT: -- LOCATION: SAN RAFAEL, BULACAN ADDRESS: SAN RAFAEL, BULACAN
17847

9669 8178

5243
8585
4054

3977

MEETING AREA

3795
4700

EXECUTIVE OFFICE
6850

6493
267
100MM
723

PRODUCTION TEAM

900
AREA; 94 SQM
LIFT
2000x3000
2000

STORAGE

1531
ROOM

ENTRY

3179 231 1000 269 2102 10991

17922

PRODUCTION TEAM AREA


1 FLOOR PLAN LAYOUT
-- SCALE 1:75 MTS

ARCHITECT: PROJECT TITLE: OWNER: DRAWN: JAV SHEET CONTENTS: REVISIONS: SHEET NO.
R.G. SIMBULAN THIS DRAWING IS FOR INFORMATION
ONLY TO BE USED BY THE ARCHITECT DATE: 10/27/2022
& PARTNERS CORP. --
OR THE GENERAL CONTRACTOR.
IT IS THE SOLE PROPERTY OF
SGC OFFICE --
PRODUCTION TEAM AREA
Architects Engineers ARCHITECT R.G. SIMBULAN AND PARTNERS AND
CANNOT BE REPRODUCED WITHOUT
CHECKED: NRL REFLECTED CEILING PLAN
--
Interior Designers PRC : -- ISSUED ON: -- WRITTEN PERMISSION. REP. ACT 545
DATE: 10/27/2022
PTR : 6007658 ISSUED AT: -- LOCATION: SAN RAFAEL, BULACAN ADDRESS: SAN RAFAEL, BULACAN
LEGENDS:

CEILING FINISH

PT 01 WHITE DUCO PAINT FINISH

LIGHTING
LED DOWNLIGHT
LIGHTING FIXTURE

PIN LIGHT

DROP LIGHTING FIXTURE

50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50
480 480 480 480 480 480 575 575 575 575 575 575 554 554 554 554 554 554 554 554 554 554 554 554 554 554 554 554 554 554
50

50
735

654

565
1449

537

1095
335
820 1588 1734
3345

1530
50

50
882
2199 803 2436 1811 3622 2138
1274

1274
MEETING AREA 2544 760

1339
EXECUTIVE
50 1049 50

50
820 1588 OFFICE
3019 1811 1811 1811 930

1274
574

637

637

637

637
936

50
1075
963 1876 1811 1811 1811 1811 1811 930

1274
50

LIFT
525

750
PRODUCTION

1324
2000X3000

50
AREA
1899

950

750 564 588

1274
STORAGE

687
525

ROOM
50

50
50 50 50 50 176 575 575 425 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50
433 433 433 5050 50 50 50 554 554 554 554 554 554 554 554 554 554 554 554 554 554 554 554 554 554

PRODUCTION TEAM AREA


1 REFLECTED CEILING PLAN
-- SCALE 1:75 MTS

ARCHITECT: PROJECT TITLE: OWNER: DRAWN: JAV SHEET CONTENTS: REVISIONS: SHEET NO.
R.G. SIMBULAN THIS DRAWING IS FOR INFORMATION
ONLY TO BE USED BY THE ARCHITECT DATE: 10/27/2022
& PARTNERS CORP. --
OR THE GENERAL CONTRACTOR.
IT IS THE SOLE PROPERTY OF
SGC OFFICE --
PRODUCTION TEAM AREA
Architects Engineers ARCHITECT R.G. SIMBULAN AND PARTNERS AND
CANNOT BE REPRODUCED WITHOUT
CHECKED: NRL REFLECTED CEILING PLAN
--
Interior Designers PRC : -- ISSUED ON: -- WRITTEN PERMISSION. REP. ACT 545
DATE: 10/27/2022
PTR : 6007658 ISSUED AT: -- LOCATION: SAN RAFAEL, BULACAN ADDRESS: SAN RAFAEL, BULACAN
LEGENDS:

FINISHES

AR 01 CONCRETE WALL FINISH

LM 01 WHITE LAMINATE FINISH


17847
LM 02 WOOD LAMINATE FINISH
5215 4054 3092 1041 2510 1935
+2860 CFL

120
+2760 FFL

1050

1050
AR 01 AR 01 AR 01 AR 01

2740
OPEN OPEN
CONCRETE CONCRETE CONCRETE CONCRETE

840

840
WALL FINISH WALL FINISH WALL FINISH WALL FINISH
OPEN OPEN

850

850
+100 FFL

+0.0 FFL 9669 8178

SGC OFFICE LM 02 LM 02
1 WALL ELEVATION 1 WOOD LAMINATE
FINISH
WOOD LAMINATE
FINISH

-- SCALE 1:60 MTS

6499
1371 2430 273 894 1531
+2860 CFL
120

300
760
+2760 FFL
1050

LM 02
WOOD LAMINATE
FINISH
2740

OPEN

2560
AR 01 TO OFFICE
840

LOUNGE
CONCRETE

2100
OPEN WALL FINISH
850

100
+0.0 FFL

SGC OFFICE
2 WALL ELEVATION 2
-- SCALE 1:60 MTS

ARCHITECT/ENGINEER: PROJECT TITLE: OWNER: DRAWN: JAV SHEET CONTENTS: REVISIONS: SHEET NO.
R.G. SIMBULAN THIS DRAWING IS FOR INFORMATION
ONLY TO BE USED BY THE ARCHITECT DATE: 10/28/2022
& PARTNERS --
OR THE GENERAL CONTRACTOR.
IT IS THE SOLE PROPERTY OF
SGC OFFICE --
SGC OFFICE
Architects Engineers ARCHITECT R.G. SIMBULAN AND PARTNERS AND
CANNOT BE REPRODUCED WITHOUT
CHECKED: NRL WALL ELEVATIONS
--
Interior Designers PRC : -- ISSUED ON: -- WRITTEN PERMISSION. REP. ACT 545
DATE: 10/28/2022
PTR : ISSUED AT: -- LOCATION: SAN RAFAEL, BULACAN ADDRESS: SAN RAFAEL, BULACAN

A4
LEGENDS:

FINISHES

AR 01 CONCRETE WALL FINISH

LM 01 WHITE LAMINATE FINISH


17835
LM 02 WOOD LAMINATE FINISH
10905 3752 3179
+2860 CFL
300

660
+2760 FFL

1410
AR 01 TO STORAGE AR 01
2460

ROOM

2100
CONCRETE CONCRETE

500
WALL FINISH WALL FINISH

850
+100 FFL
100

+0.0 FFL

SGC OFFICE LM 02
1 WALL ELEVATION 3 WOOD LAMINATE
FINISH

-- SCALE 1:60 MTS

6850
2150 723 3977
+2860 CFL
100
300

OPEN OPEN OPEN OPEN OPEN

+2760 FFL
OPEN OPEN OPEN OPEN OPEN
1410

LM 02 OPEN OPEN OPEN OPEN OPEN

WOOD LAMINATE
FINISH OPEN OPEN OPEN OPEN OPEN

AR 01
2460

OPEN OPEN OPEN OPEN OPEN

CONCRETE
500

WALL FINISH
AR 01
CONCRETE
WALL FINISH

LM 02
850

WOOD LAMINATE
+100 FFL FINISH
100

+0.0 FFL

SGC OFFICE
2 WALL ELEVATION 4
-- SCALE 1:60 MTS

ARCHITECT/ENGINEER: PROJECT TITLE: OWNER: DRAWN: JAV SHEET CONTENTS: REVISIONS: SHEET NO.
R.G. SIMBULAN THIS DRAWING IS FOR INFORMATION
ONLY TO BE USED BY THE ARCHITECT DATE: 10/28/2022
& PARTNERS --
OR THE GENERAL CONTRACTOR.
IT IS THE SOLE PROPERTY OF
SGC OFFICE --
SGC OFFICE
Architects Engineers ARCHITECT R.G. SIMBULAN AND PARTNERS AND
CANNOT BE REPRODUCED WITHOUT
CHECKED: NRL WALL ELEVATIONS
--
Interior Designers PRC : -- ISSUED ON: -- WRITTEN PERMISSION. REP. ACT 545
DATE: 10/28/2022
PTR : ISSUED AT: -- LOCATION: SAN RAFAEL, BULACAN ADDRESS: SAN RAFAEL, BULACAN

A4
LEGENDS:

1600 3234 CEILING FINISH

PT 01 WHITE DUCO PAINT FINISH

LIGHTING
LED DOWNLIGHT
LIGHTING FIXTURE

750
900
TOILET
850
1800

905 1580

250

900
ACCESS TO
TOWER

300
1550 500

3950
600 1200

1426
2000

1000

CCTV ROOM

550
500

2400 2500

SRR GUARDHOUSE
1 REFLECTED CEILING PLAN
SRR.GH.00 SCALE 1:25 MTS

ARCHITECT/ENGINEER: PROJECT TITLE: OWNER: DRAWN: JAV SHEET CONTENTS: REVISIONS: SHEET NO.
R.G. SIMBULAN THIS DRAWING IS FOR INFORMATION
ONLY TO BE USED BY THE ARCHITECT DATE: 11/05/2022
& PARTNERS --
OR THE GENERAL CONTRACTOR.
IT IS THE SOLE PROPERTY OF
SALI RESIDENCE RENOVATION GOV. SALI
SRR GUARDHOUSE
Architects Engineers ARCHITECT R.G. SIMBULAN AND PARTNERS AND
CANNOT BE REPRODUCED WITHOUT
CHECKED: NRL REFLECTED CEILING PLAN
SRR.GH.00
Interior Designers PRC : -- ISSUED ON: -- WRITTEN PERMISSION. REP. ACT 545
DATE: 11/05/2022
PTR : ISSUED AT: -- LOCATION: BLOCK 8, LOT 8, SANTIAGO VILLAGE, COVARRUBIAS DR. DIVISORIA, ZAMBOANGA CITY ADDRESS: BLOCK 8, LOT 8, SANTIAGO VILLAGE, COVARRUBIAS DR. DIVISORIA, ZAMBOANGA CITY

A4
LEGENDS:

LED DOWNLIGHT
LIGHTING FIXTURE

S1 SINGLE GANG SWITCH

S2 TWO GANG SWITCH

J JUNCTION BOX

TOILET

S1
ACCESS TO
TOWER

CCTV ROOM S1

S2

SRR GUARDHOUSE
1 LIGHTING LAYOUT
SRR.GH.00 SCALE 1:25 MTS

ARCHITECT/ENGINEER: PROJECT TITLE: OWNER: DRAWN: JAV SHEET CONTENTS: REVISIONS: SHEET NO.
R.G. SIMBULAN THIS DRAWING IS FOR INFORMATION
ONLY TO BE USED BY THE ARCHITECT DATE: 11/05/2022
& PARTNERS --
OR THE GENERAL CONTRACTOR.
IT IS THE SOLE PROPERTY OF
SALI RESIDENCE RENOVATION GOV. SALI
SRR GUARDHOUSE
Architects Engineers ARCHITECT R.G. SIMBULAN AND PARTNERS AND
CANNOT BE REPRODUCED WITHOUT
CHECKED: NRL LIGHTING LAYOUT
SRR.GH.00
Interior Designers PRC : -- ISSUED ON: -- WRITTEN PERMISSION. REP. ACT 545
DATE: 11/05/2022
PTR : ISSUED AT: -- LOCATION: BLOCK 8, LOT 8, SANTIAGO VILLAGE, COVARRUBIAS DR. DIVISORIA, ZAMBOANGA CITY ADDRESS: BLOCK 8, LOT 8, SANTIAGO VILLAGE, COVARRUBIAS DR. DIVISORIA, ZAMBOANGA CITY

A4
LEGENDS:

CONVENICENCE OUTLET

WEATHERPROOF
CONVENIENCE OUTLET

TELEPHONE OULET

W P O U T L E T
HE IG HT FRO M FLO OR
IS 1200MM AFFL

ACCESS TO
TOWER

300
CONVENIENCE OUTLET
H E I G H T I S
6 5 0 M M A F F L

T E L . O U T L E T

632
H E I G H T I S
6 5 0 M M A F F L

CONVENIENCE OUTLET

632
H E I G H T I S
6 5 0 M M A F F L
T V O U T L E T
H E I G H T I S
1 5 0 0 M M A F F L

300 900 900

631
S2

CONVENIENCE OUTLET
H E I G H T I S
6 5 0 M M A F F L

SRR GUARDHOUSE
1 AUXILIARY/ OUTLET LAYOUT
SRR.GH.00 SCALE 1:25 MTS

ARCHITECT/ENGINEER: PROJECT TITLE: OWNER: DRAWN: JAV SHEET CONTENTS: REVISIONS: SHEET NO.
R.G. SIMBULAN THIS DRAWING IS FOR INFORMATION
ONLY TO BE USED BY THE ARCHITECT DATE: 11/05/2022
& PARTNERS --
OR THE GENERAL CONTRACTOR.
IT IS THE SOLE PROPERTY OF
SALI RESIDENCE RENOVATION GOV. SALI
SRR GUARDHOUSE
Architects Engineers ARCHITECT R.G. SIMBULAN AND PARTNERS AND
CANNOT BE REPRODUCED WITHOUT
CHECKED: NRL AUXILIARY/ OUTLET LAYOUT
SRR.GH.00
Interior Designers PRC : -- ISSUED ON: -- WRITTEN PERMISSION. REP. ACT 545
DATE: 11/05/2022
PTR : ISSUED AT: -- LOCATION: BLOCK 8, LOT 8, SANTIAGO VILLAGE, COVARRUBIAS DR. DIVISORIA, ZAMBOANGA CITY ADDRESS: BLOCK 8, LOT 8, SANTIAGO VILLAGE, COVARRUBIAS DR. DIVISORIA, ZAMBOANGA CITY

A4
LEGENDS:

FINISHES

PT 01 WHITE DUCO PAINT FINISH


1811 400 889 200 125 899 400 2526
+2400 CFL LM 01 WOOD LAMINATE FINISH

250

250

250

250
AR 01 CONCRETE FINISH
OPEN OPEN OPEN

1365
OPEN OPEN OPEN

1650

1650
1250

1250
LM 01
WOOD LAMINATE
FINISH
OPEN OPEN OPEN
2000

2150
LM 01 LM 01
WOOD LAMINATE WOOD LAMINATE
FINISH FINISH

36

36
932

750
PT 01 PT 01 PT 01

900
WHITE DUCO WHITE DUCO WHITE DUCO

714

714
PAINT FINISH PAINT FINISH PAINT FINISH
150

150
100
+0.0 FFL

SRR GUARDHOUSE SRR GUARDHOUSE


1 WALL ELEVATION 1 2 WALL ELEVATION 2
SRR.GH.00 SCALE 1:40 MTS SRR.GH.00 SCALE 1:40 MTS

1600 900 800 1100 900 150 600 800 400


+2400 CFL
250

250

250
AR 01
CONCRETE
FINISH

PT 01
1650
1250

WHITE DUCO
PAINT FINISH
AR 01 AR 01 LM 01
TO CCTV
CONCRETE CONCRETE TO TOILET
ROOM WOOD LAMINATE

2250
FINISH FINISH FINISH
2150

2150
LM 01
WOOD LAMINATE
FINISH
36
750
714
150

150
+0.0 FFL

SRR GUARDHOUSE SRR GUARDHOUSE


3 WALL ELEVATION 3 4 WALL ELEVATION 4
SRR.GH.00 SCALE 1:40 MTS SRR.GH.00 SCALE 1:40 MTS

ARCHITECT/ENGINEER: PROJECT TITLE: OWNER: DRAWN: JAV SHEET CONTENTS: REVISIONS: SHEET NO.
R.G. SIMBULAN THIS DRAWING IS FOR INFORMATION
ONLY TO BE USED BY THE ARCHITECT DATE: 11/04/2022
& PARTNERS --
OR THE GENERAL CONTRACTOR.
IT IS THE SOLE PROPERTY OF
SALI RESIDENCE RENOVATION GOV. SALI
SRR GUARDHOUSE
Architects Engineers ARCHITECT R.G. SIMBULAN AND PARTNERS AND
CANNOT BE REPRODUCED WITHOUT
CHECKED: NRL WALL ELEVATIONS
SRR.GH.00
Interior Designers PRC : -- ISSUED ON: -- WRITTEN PERMISSION. REP. ACT 545
DATE: 11/04/2022
PTR : ISSUED AT: -- LOCATION: BLOCK 8, LOT 8, SANTIAGO VILLAGE, COVARRUBIAS DR. DIVISORIA, ZAMBOANGA CITY ADDRESS: BLOCK 8, LOT 8, SANTIAGO VILLAGE, COVARRUBIAS DR. DIVISORIA, ZAMBOANGA CITY

A4
LEGENDS:

FINISHES

PT 01 WHITE DUCO PAINT FINISH


2000 2400
+2400 CFL LM 01 WOOD LAMINATE FINISH

250
PT 01 PT 01

1650
WHITE DUCO WHITE DUCO
PAINT FINISH PAINT FINISH

2250

2250

2150
LM 01
WOOD LAMINATE
FINISH
36
714

150

150
+0.0 FFL

SRR GUARDHOUSE SRR GUARDHOUSE


1 WALL ELEVATION 1 2 WALL ELEVATION 2
SRR.GH.00 SCALE 1:40 MTS SRR.GH.00 SCALE 1:40 MTS

900 1100 2400


+2400 CFL
250

250
PT 01 PT 01
1650

1650
WHITE DUCO WHITE DUCO
PAINT FINISH PAINT FINISH TV
2250

2250
2150

2150
LM 01 LM 01
WOOD LAMINATE WOOD LAMINATE
FINISH FINISH
36

36
714

714
150

150
+0.0 FFL

SRR GUARDHOUSE SRR GUARDHOUSE


3 WALL ELEVATION 3 4 WALL ELEVATION 4
SRR.GH.00 SCALE 1:40 MTS SRR.GH.00 SCALE 1:40 MTS

ARCHITECT/ENGINEER: PROJECT TITLE: OWNER: DRAWN: JAV SHEET CONTENTS: REVISIONS: SHEET NO.
R.G. SIMBULAN THIS DRAWING IS FOR INFORMATION
ONLY TO BE USED BY THE ARCHITECT DATE: 11/04/2022
& PARTNERS --
OR THE GENERAL CONTRACTOR.
IT IS THE SOLE PROPERTY OF
SALI RESIDENCE RENOVATION GOV. SALI
SRR GUARDHOUSE
Architects Engineers ARCHITECT R.G. SIMBULAN AND PARTNERS AND
CANNOT BE REPRODUCED WITHOUT
CHECKED: NRL WALL ELEVATIONS
SRR.GH.00
Interior Designers PRC : -- ISSUED ON: -- WRITTEN PERMISSION. REP. ACT 545
DATE: 11/04/2022
PTR : ISSUED AT: -- LOCATION: BLOCK 8, LOT 8, SANTIAGO VILLAGE, COVARRUBIAS DR. DIVISORIA, ZAMBOANGA CITY ADDRESS: BLOCK 8, LOT 8, SANTIAGO VILLAGE, COVARRUBIAS DR. DIVISORIA, ZAMBOANGA CITY

A4
LEGENDS:
1025 600 175 1600
+2400 CFL
FINISHES

250

250

250
TL 01 600MMX600MM FLOOR TILES

TL 02 600MMX600MM WALL TILES

450

450
TL 02 TL 02

5 3 600MMX600MM
WALL TILES
600MMX600MM
WALL TILES

SRR.GH.00 SRR.GH.00

2150
1725

1725
1800
1025 600 175
513 800 488

+0.0 FFL

25
-25 FFL
SRR GUARDHOUSE SRR GUARDHOUSE
2 2 SECTION ELEVATION 1 3 SECTION ELEVATION 2
1100

SRR.GH.00 SRR.GH.00 SCALE 1:30 MTS SRR.GH.00 SCALE 1:30 MTS


1600

1600

4
SRR.GH.00
400 800 600 1600
+2400 CFL
500

250

250

250
TL 01
600MMX600MM

450
FLOOR TILES
600 800 400
1800
TL 02 TL 02
600MMX600MM 600MMX600MM
WALL TILES WALL TILES
2150

2150
SRR GUARDHOUSE
1 BLOW UP PLAN

1725
SRR.GH.00 SCALE 1:30 MTS

+0.0 FFL
25

25
-25 FFL
SRR GUARDHOUSE SRR GUARDHOUSE
4 SECTION ELEVATION 3 5 SECTION ELEVATION 4
SRR.GH.00 SCALE 1:30 MTS SRR.GH.00 SCALE 1:30 MTS

ARCHITECT/ENGINEER: PROJECT TITLE: OWNER: DRAWN: JAV SHEET CONTENTS: REVISIONS: SHEET NO.
R.G. SIMBULAN THIS DRAWING IS FOR INFORMATION
ONLY TO BE USED BY THE ARCHITECT DATE: 11/04/2022
& PARTNERS --
OR THE GENERAL CONTRACTOR.
IT IS THE SOLE PROPERTY OF
SALI RESIDENCE RENOVATION GOV. SALI
SRR GUARDHOUSE
Architects Engineers ARCHITECT R.G. SIMBULAN AND PARTNERS AND
CANNOT BE REPRODUCED WITHOUT
CHECKED: NRL BLOW UP PLAN, SECTION ELEVATIONS
SRR.GH.00
Interior Designers PRC : -- ISSUED ON: -- WRITTEN PERMISSION. REP. ACT 545
DATE: 11/04/2022
PTR : ISSUED AT: -- LOCATION: BLOCK 8, LOT 8, SANTIAGO VILLAGE, COVARRUBIAS DR. DIVISORIA, ZAMBOANGA CITY ADDRESS: BLOCK 8, LOT 8, SANTIAGO VILLAGE, COVARRUBIAS DR. DIVISORIA, ZAMBOANGA CITY

A4

You might also like