Professional Documents
Culture Documents
12 - Retrofitting Technologies For The Best Cost-Value-Ratio - Dmitri Donst With Tsuyoshi Hamada
12 - Retrofitting Technologies For The Best Cost-Value-Ratio - Dmitri Donst With Tsuyoshi Hamada
Purpose
Modification of existing cell elements from finite gap to Zero Gap technology
Benefit
• 5+21 clients around the world successfully tested v3/v4-ZG and i-BiTAC
Lifetime
• 3+4 years qualification of retrofitted elements in an industrial scale achieved
• Key statements
• Project execution
2170
technical performance limit
Power consumption
v3
Performance
v6 2130
technical performance limit v4
v5plus 2070
v3/4-ZG v5
v5 2055 2055 2055
v4 v3-ZG v4-ZG v5plus
2020-2035
v3
v6
v3 recoated
v3/v4-ZG
[ kWh/t NaOH 100% ]
end of test
Days on line
Anode halfshell
• Removing of anode distance strips (not needed anymore, zero gap!)
Cathode halfshell
cathode halfshell
Cell element
• Installation of special frame gasket and high performance membrane
Installation/exchange of elastic element and cathode electrode can be done at client’s plant
16th Chlorine Symposium – Dortmund, Germany- 15th – 17th June 2016
6 | 4:40 pm / June 16, 2016 | Retrofitting technologies | D. Donst and T. Hamada
Impressions of v3/v4 retrofitting
No. of Days
Generation elements online Country
BM2.7 gen. v3-ZG 284 700 China, plant A
China, plant B,
4 170 test finished
4 70 India, plant E
4 10 Germany, plant F
• Key statements
• Retrofit of i-BiTAC
• Project execution
Power consumption
Performance
nx-BiTAC BiTAC
technical performance limit n-BiTAC
n-BiTAC i-BiTAC
BiTAC
2010-2025
nx-BiTAC
Days on line
Anode side
• For retrofitting, no adjustments on anode side necessary
• Re-meshing of anode electrode is optional
(only in UCE/DeNora workshop)
Cathode side
cathode
anode
Cell element
• Installation of high performance membrane and standard gasket
• Key statements
• Retrofit of i-BiTAC
• Project execution
Sensitivity for Current Density (CD) Sensitivity for Electricity Cost [in €]
electricity cost: 5 €ct./kWh current density: 5 kA/m² CD
400 T€ 400 T€
300 T€ 300 T€
200 T€ 200 T€
capital value
capital value
100 T€ 100 T€
T€ T€
-100 T€ -100 T€
-200 T€ -200 T€
-300 T€ -300 T€
0 1 2 3 4 0 1 2 3 4
Time [a] Time [a]
Basic conditions:
Elements: 180 BM2.7 v4 / Investment: 1 Mio.€ / Interest rate: 10%
Attractive ROI periods due to customized solutions for the best cost-value-ratio
*excl. costs for accessories & membrane
16th Chlorine Symposium – Dortmund, Germany- 15th – 17th June 2016
16 | 4:40 pm / June 16, 2016 | Retrofitting technologies | D. Donst and T. Hamada
Experienced execution network with focus on client’s demand
Disassembly
of electrolyzer
and elements
Assembly of Shipping of
retrofitted halfshells
electrolyzer to the
workshop
S
S
S customer
Shipping of
halfshells Incoming
to the inspection
customer and repair of
halfshells
Retrofit of
anode and
cathode
halfshells
thyssenkrupp UCE network has a lot of experience to apply necessary steps in a high quality