Update DES Pit 9 Per Jam 11
Update DES Pit 9 Per Jam 11
Unit RFU OWN BD REMARK HM BD DATE BD TIME EST RFU PIT LOC
(2022) Number
Track Lh Low & Boom Low (UNS-P/HYS) Troubleshooting hydraulic system (done) finding spools control valve scratch and
HITACHI ZX370 1 0 DH 1 EX1295 6988,37 18-Sep-22 7:28 16-Dec-22 Mandalika
hyd pump found particles, sent both of components to BSF Balikpapan, inner tube Cyl Boom has been send to BPN
EX1357 Swing Jammed (WA) Warranty SANY 14-Dec-22 20:10 16-Dec-22 Pit Stop
SANY SY215C 4 2 DH 2
EX1356 Track LH Loosen (UNS/UNC) 16-Dec-22 10:30 14:00 Waterfill lama
SANY SY215CLA (LONG ARM) 1 1 DH 0
Total 30 24 6
PMS 300 Hrs (SC/PM) Bracket Torque Rod Stabilizer Broken & Bushing Sperical Suspension Rear RH Missing Waiting
DT2522 27932.5 1-Nov-22 06:57 TBA Workshop
external vendor to repair bracket torque rod RH, Waiting part Drive Shaft swap to DT2327
7 6 DH 1 Radiator contamination & Hose air pressure leaks (UNS/COS) Coolant mix oil, Dissamble oil cooler transmission, Replace
SCANIA P410 DT1108 16818,7 2-Nov-22 8:55 16-Dec-22 Workshop
Oil Cooler done, Radio N/A, Lock steering N/A, Bolt lower shock abshorber N/A
SCANIA P380 1 0 DH 1 DT1096 Steering system linkage worn out & steering gearbox swap to unit ACP (UNS-P/STR) Waiting Part 22970 21-Apr-21 8:39 16-Dec-22 Workshop
Total 23 17 6
DEWATERING
PUMP DND LCCCH-200-610. 2 2 JMI 0
Total 2 2 0
SUPPORT & FACILITY
FT1129
MERCY 2528 3 3 DH 0 FT1153
FT1132
Total 3 3 0
Service truck
VOLVO FM380 1 1 DH 0 ST1093
MAINTENANCE COMPONENT
DESCRIPTION REMARK Description
CODE
CODE
STA Starting System
SC Plan Schedule Service, Replacement major component dari planner CRG Charging System
UNS Unschedule Breakdown, replace part saat breakdown yang tidak direncanakan planner ETC Electronic Control
UNS-P Unschedule Predictive Backlog, breakdown terprediksi sebelumnya (terdapat orderan) EFS Engine Fuel System