Attachment 5 - Lifting Practices - W28

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

Practice / Lifting Operation

PTSC M&C

Weekly Week 28-2022


Using the web sling for the wrong purpose. Safety factor is not
guaranteed according to NOC requirement.

The two slings were used to attach to 20-


ton forklift on one end and the other end
to pull materials from a container.
The slings were not color coded,
inspected and registered in project lifting
gears master list.
Safety Factor of the slings were 5:1 which
is not accepted by NOC.

HSE Team 2
Touching to control the load
PVC MS yard

HSE Team 3
No barricade during lifting operation
PVC MS yard

HSE Team 4
Improper stored slings
PTSC MC yard

HSE Team 5
Using the wrong type of shackle pin.

HSE Team 6
Improper rigging method while using chain block

Hook stuck on pad-eye

HSE Team 7
No method to remove shackle properly

Observed there is
a rigger standing
on handrail to
unrigging shackle

HSE Team 8