You are on page 1of 29

Sensitivity: General #_x000D_

OVER TIME & NIGHT SHIFT ACTIVITY (C

Date: 07 09 2022

MP Shift 1 MP Shift 2
No Area SPV

19.00 - 22.00 22.00 - Ended

1 Production Bimo 41 10
Sensitivity: General #_x000D_

2 Sugar, Can Making Ispendri 40 10


Sensitivity: General #_x000D_

3 RMS Toto 91 15
Sensitivity: General #_x000D_

4 Filling Packing Bimo 90 11


Sensitivity: General #_x000D_

5 Alcove coridor Toto 40 9


Sensitivity: General #_x000D_

Energy - Water and chemical


6 Tomi 68 8
Tank-Microlab-Piperack
Sensitivity: General #_x000D_

7 Main Office (GH,Mosque) Ispendri 85 N/A

8 Infrastructure Ferry 25 11
Sensitivity: General #_x000D_

9 PT TPP Ferdy 42 N/A


Sensitivity: General #_x000D_

10 PT SML Tedy K 18 N/A

11 PT TANDON (Plumbing) Tedy K 21 N/A


Sensitivity: General #_x000D_

12 PT TANDON (Fire Fighter) Tedy K

13 PT ARMINDO Tedy K 4 N/A

Sujarwo/
14 Finishing Production,Alcove coridor 136 16
widjan
Sensitivity: General #_x000D_

15 Finishing Filling Packing Sujarwo 16 N/A

16 Kristalisasi Bimo 20 N/A


Sensitivity: General #_x000D_

17 WWTP + PT Abimanyu Bimo 66 9

18 PT Kharisma Taufan 7 N/A

19 PT
Sensitivity: General #_x000D_

20 PT IKM David A. 10 N/A

PT Ketira/Strauss Pile area pagar


21 Toto
belakang depan pos security 2

22 PT Gaja Tedi K
Sensitivity: General #_x000D_

23 PT. CHC David A. 98 N/A

24 PT.ARGO Widjan

25 Production Widjan

26 PT.GTA David A.

Asep
27 PT. APIK (Filling Packing & RMS
Sunarman

Total Manpower 918 99


Required SHE On site 19 2
% of Overtime 76% 8%
Sensitivity: General #_x000D_

IFT ACTIVITY (C-02,C-010)

Total Morning Shift Worker: 1205 SHE

Approved by
Beca/FFI
Jobdesk Remarks

Yes/No

Lakukan TBM, Blood Pressure


pembesian,cleaning area check, Fatique check, Tools
roof,scaffolding,loadingb and equipment inspection
material,pasang (Life Line, APD check etc),
Yes
relat,concrete colom + Supervisor & SHE standby,
pedestrian dan lantai roof LMRA, Pencahayaan Min 100
180 m3 Lux, Lakukan Housekeeping
15 menit
Sensitivity: General #_x000D_

Lakukan TBM, Blood Pressure


Pembesian slab, check, Fatique check, Tools
pembesian tb pc colom and equipment inspection
wall slab,form work tb tc (Life Line, APD check etc),
Yes
colom wall slab,cleaning tb Supervisor & SHE standby,
tc,perapian LMRA, Pencahayaan Min 100
batako,concrete 7 m3 Lux, Lakukan Housekeeping
15 menit
Sensitivity: General #_x000D_

Pasang bekisting (Batako


+ formwork), pasang
tenda, pasang besi, Supervisor & SHE standby,
pasang relat, gali manual, LMRA, Pencahayaan Min 100
Yes
langsir material, perataan Lux, Lakukan Housekeeping
tanah, pengecoran dinding 15 menit
rc V.10m3,pengecoran
slab V.10m3
Sensitivity: General #_x000D_

Lakukan TBM, Blood Pressure


Install bekesting bawah
check, Fatique check, Tools
lantai & dinding,install
and equipment inspection
rebar lantai &
(Life Line, APD check etc),
didnding,install scaffolding Yes
Supervisor & SHE standby,
& access,dismantling
LMRA, Pencahayaan Min 100
bekesting,concrete colom
Lux, Lakukan Housekeeping
& lantai 110 m3
15 menit
Sensitivity: General #_x000D_

Lakukan TBM, Blood Pressure


Pasang perkuatan dinding
check, Fatique check, Tools
bebas lt1,pasang
and equipment inspection
scaffolding lt gf,bongkar
(Life Line, APD check etc),
bekesting gutter dan Yes
Supervisor & SHE standby,
pedesdtal lt 2,cleaning
LMRA, Pencahayaan Min 100
chipping lt 1,plan concrete
Lux, Lakukan Housekeeping
lt 1 53m3
15 menit
Sensitivity: General #_x000D_

Install rebar, install


formwork, install hebel,
Supervisor & SHE standby,
plesteran dan acian, gali
LMRA, Pencahayaan Min 100
dan urugan, peralatan Yes
Lux, Lakukan Housekeeping
tanah, pemadatan,
15 menit
concrete 15m3, general
cleaning, pabrikasi besi
Sensitivity: General #_x000D_

Pasang hebel, plaster ACI,


Epoxy, pembesian atap Supervisor & SHE standby,
tangga 1,tb,pc, LMRA, Pencahayaan Min 100
Yes
colom,lantai /install Lux, Lakukan Housekeeping
keramik ,cleaning,kompres 15 menit
or,atap tangga

Supervisor & SHE standby,


Fabrikasi besi dan fabrikasi LMRA, Pencahayaan Min 100
Yes
bekisting,concrete dramix Lux, Lakukan Housekeeping
15 menit
Sensitivity: General #_x000D_

perkuatan + checklist area


pengecoran lt4,pasang
bekesting
Supervisor & SHE standby,
kolom+Verticality,pasang
LMRA, Pencahayaan Min 100
perancah,bongkar kanti Yes
Lux, Lakukan Housekeeping
lever+penariakan
15 menit
material,penurunan
material,pasang bekesting
pondasi lt4 zona 3
Sensitivity: General #_x000D_

Energy area floor 1area


wtp whring cable pouler
Supervisor & SHE standby,
as.e3-eg(ea-ed),reping
LMRA, Pencahayaan Min 100
stop kontak pouler floor gf Yes
Lux, Lakukan Housekeeping
wtp,Main office area
15 menit
whiring cable floor 1 main
office cb-=oe/as9-16

Supervisor & SHE standby,


Galian sisi timur jalur pipa
LMRA, Pencahayaan Min 100
dw 04,supporting area as Yes
Lux, Lakukan Housekeeping
u19s/das u24:1 production
15 menit
Sensitivity: General #_x000D_

enenrgy floor 1 Supervisor & SHE standby,


as-c4-c5/ea-ed LMRA, Pencahayaan Min 100
YES
wtp,whiring fire alarm dan Lux, Lakukan Housekeeping
sound sistem 15 menit

Supervisor & SHE standby,


Clearance str,install LMRA, Pencahayaan Min 100
Yes
hcb,scaffolding,cleaning Lux, Lakukan Housekeeping
15 menit
Sensitivity: General #_x000D_

Clearance str,install hcb Supervisor & SHE standby,


floor 1,plestering,scm LMRA, Pencahayaan Min 100
Yes
colom,scaffolding,cleaning Lux, Lakukan Housekeeping
dan loading 15 menit

install bekesting bawah


lantai,besi bawah dan Supervisor & SHE standby,
lantai,pasang LMRA, Pencahayaan Min 100
Yes
scaffolding,clirent structur Lux, Lakukan Housekeeping
lt 2,pembersihan area 15 menit
kerja
Sensitivity: General #_x000D_

Supervisor & SHE standby,


LMRA, Pencahayaan Min 100
Yes
Lux, Lakukan Housekeeping
15 menit

Area techincal/Chemical =
Install
besi,batako,bekesting,Area
Secondary= bongkar
bekesting wall ,Area super
sep= bongkar bekesting
wall,Area basin= Install
bekesting,scaffolding,besi,
concrete wall
22m3,concrete balok basin
zone 1 10 m3,kebersihan

Supervisor & SHE standby,


LMRA, Pencahayaan Min 100
skim coat,repairing Yes
Lux, Lakukan Housekeeping
15 menit
Sensitivity: General #_x000D_

Supervisor & SHE standby,


Unloading material gutter LMRA, Pencahayaan Min 100
Yes
and flashing Lux, Lakukan Housekeeping
15 menit
Sensitivity: General #_x000D_

Erection bresing,intsall
anchor,install
scaffolding,setting
rafter,verticallity,seting
corbel,bright,tightening
bolt,move material

Supervisor & SHE standby,


LMRA, Pencahayaan Min 100
Yes
Lux, Lakukan Housekeeping
15 menit
Sensitivity: General #_x000D_

25 Required SHE On site

31 Spv 38