CONTRACT FOR WORK

Project:

and

CONTRACTOR’s Name and Address

PREAMBLE

………………………….

REPRESENTATION

Representative of the
Project supervision
 Name , WatHab engineer Mob: 09 xxxxxxxxxxx
Contractual follow up
 Ines_M Sagarna: Logistic Coordinator
For the Contrator :

 Contractor , Managing Director , Mob 09 xxxxxxxxxxx

OBJECT

1.1. Object & Work Description of the contract

The ICRC is intending to construct ……………………………

The works consist of implement the tasks listed below:

 XXXXXX
 XXXXXX
 XXXXXX
 Contractor must be implement according to the design drawing

Work output shall be based on the specifications provided to the contractor by the ICRC and
included as an addendum to this document.

1.2. Contractual documents

The following documents constitute an integral part of the contract and must be
signed:

1.2.1 General Conditions for work contracts

1.2.2 Drawings & Project Layout : Annex A


1.2.3 Detail Specifications Annex B

1.2.4 Bill of quantities : Annex C

1.3. Certification by the Contractor

Refer to General Conditions

START AND END OF WORKS

1.4. The Contractor will start the work within a week of contract signing.

1.5. The works are to be complete within ( ) working days from the starting date.

1.6. Conditions

1.6.1 For contract to come into force

The contract comes into force at the date of the signature.

PRICE

The total value of the works to be performed under this contract is MMK xxxxxx.
(xxxxxxxxxxxxxxxxx Myanmar Kyats)

1.7. Payment

The price of the works is payable according to the Bill of Quantities in Annex C
Payment of the works is according to the schedule below. Each payment is a
percentage of the total contracted amount of MMK xxxxxxxxx. The payment should
be done in cheque or in cash or via bank transfer.

Down Payment: Within 5 working days of


~30% MMK xxxxxxxxx
signing the contract

Second Payment: upon completion of 50% of


~40% MMK xxxxxxxxxxx
works.

Final Payment: upon the completion of all the


~30% MMK xxxxxxxxxxx
works

The AMOUNT of the (final) payment will be calculated according to the completion
certificate following the actual executed works.
Refer to General Conditions

INSURANCE AND LIABILITY

Refer to General Conditions

1.8. Construction works insurance

The Contractor guarantees that it has concluded a construction works insurance


contract and that it will pay the related premiums.

The Client will receive certification from the insurer concerning the all-in price and the
delegation of payment.

1.9. Third party liability

Not applicable

PENALTIES

Failure by the Contractor to fulfill the contract by the agreed dates will result in the
Contractor being penalized as follow:

- retain from the payment schedule a penalty equivalent to 1% of the total value of
the present Contract per each week of delay, up to a maximum of 5%.

Furthermore, the General Conditions apply.

LANGUAGE

If this contract is translated into another language, the English version will prevail in
case of dispute or discepancy.

APPLICABLE LAW

Not applicable

ARBITRATION

This contract is subject to arbitration exclusively, according to the attached General


Conditions.

MODIFICATIONS OF THE CONTRACT / GENERAL CONDITIONS

Not applicable

Enclosures:

To be signed
- General Conditions – Contracts for work
- Documents mentionned in article 1.2 "Contractual documents"

Signed at place on date to be mentioned


For xxxxxxxxxxx Construction Co; Ltd

______________________ ________________________

[…………………………….] [...............................................]
Managing Director

xxxxxxxxxxxxx