Small Contract
Small Contract
Small Contract
Project:
and
PREAMBLE
………………………….
REPRESENTATION
Representative of the
Project supervision
Name , WatHab engineer Mob: 09 xxxxxxxxxxx
Contractual follow up
Ines_M Sagarna: Logistic Coordinator
For the Contrator :
OBJECT
XXXXXX
XXXXXX
XXXXXX
Contractor must be implement according to the design drawing
Work output shall be based on the specifications provided to the contractor by the ICRC and
included as an addendum to this document.
The following documents constitute an integral part of the contract and must be
signed:
1.4. The Contractor will start the work within a week of contract signing.
1.5. The works are to be complete within ( ) working days from the starting date.
1.6. Conditions
PRICE
The total value of the works to be performed under this contract is MMK xxxxxx.
(xxxxxxxxxxxxxxxxx Myanmar Kyats)
1.7. Payment
The price of the works is payable according to the Bill of Quantities in Annex C
Payment of the works is according to the schedule below. Each payment is a
percentage of the total contracted amount of MMK xxxxxxxxx. The payment should
be done in cheque or in cash or via bank transfer.
The AMOUNT of the (final) payment will be calculated according to the completion
certificate following the actual executed works.
Refer to General Conditions
The Client will receive certification from the insurer concerning the all-in price and the
delegation of payment.
Not applicable
PENALTIES
Failure by the Contractor to fulfill the contract by the agreed dates will result in the
Contractor being penalized as follow:
- retain from the payment schedule a penalty equivalent to 1% of the total value of
the present Contract per each week of delay, up to a maximum of 5%.
LANGUAGE
If this contract is translated into another language, the English version will prevail in
case of dispute or discepancy.
APPLICABLE LAW
Not applicable
ARBITRATION
Not applicable
Enclosures:
To be signed
- General Conditions – Contracts for work
- Documents mentionned in article 1.2 "Contractual documents"
______________________ ________________________
[…………………………….] [...............................................]
Managing Director
xxxxxxxxxxxxx