Denah pabrik bakso froz

rik bakso frozen


Perhitungan dan Perencanaan Instalasi Penerangan Listrik
No Nama Ruang Ukuran (m) K hr
p l h t
K=𝐹/(𝑡(𝑃+𝑙)) η𝑟=𝐷_1+(𝐾−𝐾_1
)(𝐷_2−𝐷_(1))
=4/(2(2+2))=0,5𝑚

1 Pos 1 Security 2 2 4 2 0.43


2 ruang tunggu 3 2 4 2 0.6 0.56
3 smoking area 1 2 2 4 2 0.5 0.43
4 wc 1 1.5 2 4 2 0.4285714286 0.43
5 musholla 3 2 4 2 0.6 0.56
6 pos 2 security 2 2 4 2 0.5 0.43
7 smoking area 2 2 2 4 2 0.5 0.43
8 wc 2 1.5 2 4 2 0.4285714286 0.43
9 parkir tamu 4 3 3 2 0.8571428571 0.51
10 parkir staff 10 3 3 2 1.1538461538 0.62
11 taman 15.5 4 2 2 1.5897435897 0.76
12 lobby 4 3 5 3 0.5714285714 0.56
13 ruang direktur 2 2 5 2 0.5 0.43
14 ruang meeting 1 3 2 5 2 0.6 0.56
15 kantor direksi 3 7.5 5 2 1.0714285714 0.62
16 manager administrasi 2 2 5 2 0.5 0.43
17 ruang meeting 2 2 3 5 2 0.6 0.56
18 staff administrasi 4 7.5 5 2 1.3043478261 0.73
19 kantin 5 4 5 2 1.1111111111 0.62
20 wc 3 2 4 4 2 0.6666666667 0.56
21 klinik 2 5 5 2 0.7142857143 0.51
22 staff keuangan 3 5 5 2 0.9375 0.57
23 manager keuangan 2 2 4 2 0.5 0.43
24 ruang meeting 3 2 3 4 2 0.6 0.56
25 manager teknik 2 2 4 2 0.5 0.43
26 staff teknik 3 5 4 2 0.9375 0.57
27 wc 4 1.5 3 4 2 0.5 0.43
28 gudang spare part 1 4.5 5 5 3 0.7894736842 0.51
29 gudang spare part 2 3.5 5 5 3 0.6862745098 0.56
30 staff gudang 4 2 4 2 0.6666666667 0.56
31 gudang barang mentah/baku 10 4 5 3 0.9523809524 0.57
32 loading truk 1 3 4 5 3 0.5714285714 0.43
33 ruang higenis barang baku 4 5 5 3 0.7407407407 0.51
34 ruang bumbu 4 5 5 3 0.7407407407 0.51
35 lorong 4 2 5 3 0.4444444444 0.43
36 ruang sanitasi 4 2 5 3 0.4444444444 0.43
37 ruang pembersihan 4 5 5 3 0.7407407407 0.51
38 ruang pengolahan bahan baku 9 5 5 3 1.0714285714 0.62
39 ruang proses bahan jadi 10 6.5 5 3 1.3131313131 0.73
40 ruang pengemasan 5 8 5 3 1.0256410256 0.62
41 quality control 3 6.5 5 3 0.6842105263 0.56
42 gudang barang jadi 12 5 5 3 1.1764705882 0.62
43 loading truk 2 3 12 5 3 0.8 0.51
44 parkir truk 2 17 4 2 2 1.619047619 0.92
45 genset 3 3 5 3 0.5 0.43
46 workshop teknik 4 6 5 2 1.2 0.73
47 wc 5 1.5 3 4 2 0.5 0.43
48 staff produksi 4 4 4 2 1 0.59
49 pengolahan air 8 4 5 3 0.8888888889 0.51
50 pengolahan limbah 8 4 5 3 0.8888888889 0.51
51 pengolahan sampah 3 7 4 2 1.05 0.59
52 pengolahan sampah/limbah b3 3 3 4 2 0.75 0.51
53
54
55
Jumlah
hlb hb Em Ql Y N Lampu TL (W)
Lampu Pijar (W) S.Kontak (VA)
25 40 40 60 100 500 1000
+𝑙)) η𝑟=𝐷_1+(𝐾−𝐾_1)/(𝐾_2−𝐾_1 Ql=Em x jenis N=(𝐸𝑚 𝑥 𝐹)/(𝑄𝑙 𝑥 η𝑏 𝑥 𝑌)
)(𝐷_2−𝐷_(1))ηb=ηr x ηlb
2))=0,5𝑚 lampu =(100 𝑥4)/(2500 𝑥 0. 344𝑥
= 0.43x0.8 0.7)=0.6644
=100 x 25
= 0.344
(TL)
0.8 100 0.7 1 2
0.8 0.448 100 2500 0.7 0.765306122449 1
0.8 0.344 100 2500 0.7 0.664451827243 1
0.8 0.344 100 4000 0.7 0.31146179402 1
0.8 0.448 100 4000 0.7 0.478316326531 1 1
0.8 0.344 100 2500 0.7 0.664451827243 1 2
0.8 0.344 100 2500 0.7 0.664451827243 1
0.8 0.344 100 2500 0.7 0.498338870432 1
0.8 0.408 100 4000 0.7 1.050420168067 1
0.8 0.496 100 4000 0.7 2.160138248848 2
0.8 0.608 50 5000 0.7 1.456766917293 2
0.8 0.448 200 8000 0.7 0.956632653061 1 4
0.8 0.344 100 4000 0.7 0.415282392027 1 2
0.8 0.448 200 8000 0.7 0.478316326531 1 3
0.8 0.496 300 12000 0.7 1.620103686636 2 6
0.8 0.344 200 8000 0.7 0.415282392027 1 2
0.8 0.448 200 8000 0.7 0.478316326531 1 3
0.8 0.584 300 12000 0.7 1.834637964775 2 6
0.8 0.496 200 8000 0.7 1.440092165899 2 4
0.8 0.448 100 4000 0.7 0.637755102041 1
0.8 0.408 100 4000 0.7 0.875350140056 1 2
0.8 0.456 300 12000 0.7 1.174812030075 1 6
0.8 0.344 200 8000 0.7 0.415282392027 1 2
0.8 0.448 200 8000 0.7 0.478316326531 1 3
0.8 0.344 200 8000 0.7 0.415282392027 1 1
0.8 0.456 300 12000 0.7 1.174812030075 1 6
0.8 0.344 100 4000 0.7 0.46719269103 1
0.8 0.408 300 12000 0.7 1.969537815126 2 3
0.8 0.448 300 12000 0.7 1.395089285714 2 3
0.8 0.448 200 8000 0.7 0.637755102041 1 6
0.8 0.456 300 12000 0.7 3.132832080201 3 4
0.8 0.344 100 10000 0.7 0.498338870432 1 1
0.8 0.408 500 20000 0.7 1.750700280112 2 4
0.8 0.408 500 20000 0.7 1.750700280112 2 4
0.8 0.344 200 8000 0.7 0.830564784053 1 1
0.8 0.344 300 12000 0.7 0.830564784053 1 1
0.8 0.408 500 20000 0.7 1.750700280112 2 2
0.8 0.496 1000 40000 0.7 3.240207373272 3 4 1
0.8 0.584 1000 40000 0.7 3.975048923679 4 4 1
0.8 0.496 1000 40000 0.7 2.880184331797 3 4 1
0.8 0.448 1000 40000 0.7 1.554528061224 2 6
0.8 0.496 300 12000 0.7 4.320276497696 5 3
0.8 0.408 100 10000 0.7 1.260504201681 1 1
0.8 0.736 50 2000 0.7 3.299689440994 3
0.8 0.344 100 4000 0.7 0.93438538206 1 2
0.8 0.584 300 12000 0.7 1.46771037182 2 2 2
0.8 0.344 100 4000 0.7 0.46719269103 1
0.8 0.472 200 8000 0.7 1.210653753027 1 6
0.8 0.408 300 18000 0.7 1.86741363212 2 2
0.8 0.408 300 18000 0.7 1.86741363212 2 2
0.8 0.472 50 3000 0.7 1.059322033898 1
0.8 0.408 50 3000 0.7 0.525210084034 1

6 62 5 6 2 120 5
Stitik Pf Sdaya
(VA)

3 1 1025
1 1 25
1 1 25
1 0.8 50
2 0.8 550
3 1 1025 1025
1 1 25 1
1 1 25 1
1 1 40 0
2 1 80 0
2 0.8 250 0
5 1 2040 8
3 1 1040 0
4 1 1540 0
8 1 3080 3080
3 1 1040 0
4 1 1540
8 1 3080
6 1 2080
1 0.8 50
3 1 1040
7 1 3040
3 1 1040
4 1 1540
2 1 540
7 1 3040
1 0.8 50
5 1 1580
5 1 1580
7 1 3040
7 1 2120
2 1 540
6 1 2080
6 1 2080
2 1 540
2 1 540
4 1 1080
8 1 3120
9 1 3160
8 1 3120
8 1 3080
8 1 1700
2 1 540
3 1 120
3 1 1040
6 1 3080
1 0.8 50
7 1 3040
4 0.8 1150
4 0.8 1150
1 0.8 75
1 0.8 75
0
0
0
206 68580
Tabel 3.2. Pembagian Grup Beban
Lampu TL (W) Lampu Pijar (W) S.Kontak (VA)
Grup No. Nama Ruang Stitik
25 40 40 60 100 500 1000
Grup 1 1 Pos 1 Security 1 2 3
2 ruang tunggu 1 1
3 smoking area 1 1 1
4 wc 1 1 1
5 musholla 1 1 2
6 pos 2 security 1 2 3
7 smoking area 2 1 1
8 wc 2 1 1
9 parkir tamu 1 1
10 parkir staff 2 2
Grup 2 11 taman 2 2
12 lobby 1 4 5
Grup 3 13 ruang direktur 1 2 3
14 ruang meeting 1 1 3 4
Grup 4 15 kantor direksi 2 6 8
Grup 5 16 manager administrasi 1 2 3
17 ruang meeting 2 1 3 4
Grup 6 18 staff administrasi 2 6 8
Grup 7 19 kantin 2 4 6
20 wc 3 1 1
21 klinik 1 2 3
Grup 8 22 staff keuangan 1 6 7
Grup 9 23 manager keuangan 1 2 3
24 ruang meeting 3 1 3 4
25 manager teknik 1 1 2
Grup 10 26 staff teknik 1 6 7
27 wc 4 1 1
Grup 11 28 gudang spare part 1 2 3 5
29 gudang spare part 2 2 3 5
Grup 12 30 staff gudang 1 6 7
Grup 13 31 gudang barang mentah/baku 3 4 7
32 loading truk 1 1 1 2
Grup 14 33 ruang higenis barang baku 2 4 6
34 lorong 1 1 2
Grup 15 35 ruang bumbu 2 4 6
36 ruang sanitasi 1 1 2
Grup 16 37 ruang pembersihan 2 2 4
Grup 17 38 ruang pengolahan bahan baku 3 4 1 8
Grup 18 39 ruang proses bahan jadi 4 4 1 9
Grup 19 40 ruang pengemasan 3 4 1 8
Grup 20 41 quality control 2 6 8
Grup 21 42 gudang barang jadi 5 3 8
43 loading truk 2 1 1 2
44 parkir truk 2 3 3
45 genset 1 2 3
Grup 22 46 workshop teknik 2 2 2 6
Grup 23 47 wc 5 1 1
48 staff produksi 1 6 7
Grup 24 49 pengolahan air 2 2 4
50 pengolahan limbah 2 2
51 pengolahan sampah 1 2 3
52 pengolahan sampah/limbah b3 1 1
6 62 5 6 2 120 206
ban
Sdaya Stitik Sdaya (VA) R S T
(VA) Grup Grup (VA) (VA) (VA)
1025 16 2870 2870
25
25
50
550
1025
25
25
40
80
250 7 2290 2290
2040
1040 7 2580 2580
1540
3080 8 3080 3080
1040 7 2580 2580
1540
3080 8 3080 3080
2080 10 3170 3170
50
1040
3040 7 3040 3040
1040 9 3120 3120
1540
540
3040 8 3090 3090
50
1580 10 3160 3160
1580
3040 7 3040 3040
2120 9 2660 2660
540
2080 8 2620 2620
540
2080 8 2620 2620
540
1080 4 1080 1080
3120 6 3120 3120
3160 9 3160 3160
3120 10 3120 3120
3080 8 3080 3080
1700 16 3400 3400
540
120
1040
3080 6 3080 3080
50 8 3090 3090
3040 5540 1846.667
1150 10 2450 2450
1150 3
75
75
68580 68580 22150 22980 23450

19.4829545
0
Tabel 3.3. Perhitungan Penampang kawat dan Drop Tegangan
Daya E I r L1
Grup Jenis Kabel Vd max
(VA) (Volt) (A) (Ω/km) (m)
1 NYA 2X2 2870 220 13.045454545455 0.0000172 60 4.4
2 NYA 2X2 2290 220 10.409090909091 0.0000172 40 4.4
3 NYA 2X2 2580 220 11.727272727273 0.0000172 27 4.4
4 NYA 2X2 3080 220 14 0.0000172 20 4.4
5 NYA 2X2 2580 220 11.727272727273 0.0000172 18 4.4
6 NYA 2X2 3080 220 14 0.0000172 15 4.4
7 NYA 2X2 3170 220 14.409090909091 0.0000172 26 4.4
8 NYA 2X2 3040 220 13.818181818182 0.0000172 34 4.4
9 NYA 2X2 3120 220 14.181818181818 0.0000172 40 4.4
10 NYA 2X2 3090 220 14.045454545455 0.0000172 41 4.4
11 NYA 2X2 3160 220 14.363636363636 0.0000172 45 4.4
12 NYA 2X2 3040 220 13.818181818182 0.0000172 33 4.4
13 NYA 2X2 2660 220 12.090909090909 0.0000172 36 4.4
14 NYA 2X2 2620 220 11.909090909091 0.0000172 28 4.4
15 NYA 2X2 2620 220 11.909090909091 0.0000172 20 4.4
16 NYA 2X2 1080 220 4.9090909090909 0.0000172 26 4.4
17 NYA 2X2 3120 220 14.181818181818 0.0000172 10 4.4
18 NYA 2X2 3160 220 14.363636363636 0.0000172 15 4.4
19 NYA 2X2 3120 220 14.181818181818 0.0000172 22 4.4
20 NYA 2X2 3080 220 14 0.0000172 15 4.4
21 NYA 2X2 3400 220 15.454545454546 0.0000172 46 4.4
22 NYA 2X2 3080 220 14 0.0000172 44 4.4
23 NYA 2X2 3090 220 14.045454545455 0.0000172 40 4.4
24 NYA 2X2 2450 220 11.136363636364 0.0000172 55 4.4
756

v
220
Jumlah rms
L1 = Jarak PHB ke beban terjauh dalam 1 grup
rop Tegangan
R kabel
A (mm²) R (Ω) E% (Ω/km)
Vd E% R50° Vd50°
A1 A2 R1 R2 50°C
6.1195 4 0.33728 0.2682 3.4988 1.59036 0.300384 3.91864582 1.781203 4.47
3.25521 2.5 0.42271 0.2856 2.9728 1.351289 0.319872 3.32957673 1.513444 7.14
2.47552 2.5 0.37519 0.19278 2.2608 1.027629 0.215914 2.53207767 1.150944 7.14
2.18909 2.5 0.31429 0.1428 1.9992 0.908727 0.159936 2.239104 1.017775 7.14
1.65035 2.5 0.37519 0.12852 1.5072 0.685086 0.143942 1.68805178 0.767296 7.14
1.64182 2.5 0.31429 0.1071 1.4994 0.681545 0.119952 1.679328 0.763331 7.14
2.92898 2.5 0.30536 0.18564 2.6749 1.215865 0.207917 2.99589207 1.361769 7.14
3.67312 2.5 0.31842 0.24276 3.3545 1.524774 0.271891 3.75704204 1.707746 7.14
4.43504 4 0.31026 0.1788 2.5357 1.152595 0.200256 2.83999418 1.290906 4.47
4.50221 4 0.31327 0.18327 2.5741 1.17005 0.205262 2.88300371 1.310456 4.47
5.05339 4 0.30633 0.20115 2.8892 1.313293 0.225288 3.23595491 1.470889 4.47
3.56509 2.5 0.31842 0.23562 3.2558 1.479927 0.263894 3.6465408 1.657519 7.14
3.40304 2.5 0.36391 0.25704 3.1078 1.412658 0.287885 3.48078895 1.582177 7.14
2.60701 2.5 0.36947 0.19992 2.3809 1.082212 0.22391 2.66656931 1.212077 7.14
1.86215 2.5 0.36947 0.1428 1.7006 0.773008 0.159936 1.90469236 0.865769 7.14
0.99788 2.5 0.8963 0.18564 0.9113 0.414238 0.207917 1.02068247 0.463947 7.14
1.10876 2.5 0.31026 0.0714 1.0126 0.460264 0.079968 1.13409164 0.515496 7.14
1.68446 2.5 0.30633 0.1071 1.5383 0.699248 0.119952 1.72294691 0.783158 7.14
2.43927 2.5 0.31026 0.15708 2.2277 1.012582 0.17593 2.4950016 1.134092 7.14
1.64182 2.5 0.31429 0.1071 1.4994 0.681545 0.119952 1.679328 0.763331 7.14
5.55802 4 0.28471 0.20562 3.1778 1.444438 0.230294 3.55909527 1.617771 4.47
4.816 4 0.31429 0.19668 2.7535 1.2516 0.220282 3.0839424 1.401792 4.47
4.3924 4 0.31327 0.1788 2.5113 1.141512 0.200256 2.81268655 1.278494 4.47
4.78864 4 0.3951 0.24585 2.7379 1.244489 0.275352 3.06642 1.393827 4.47
Tabel 3.4. Perhitungan Arus Nominal dan Arus Asut
V motor Frek N
No Jenis Beban Kegunaan h
(Volt) (Hz) (rpm)
1 motor AC 1ɸ pompa air 220 50 0.8 1200
2 motor AC 3ɸ penggiling bumbu 220/380 50 0.75 1700
3 motor AC 3ɸ penggiling bahan baku 1 220/381 50 0.75 1700
4 motor AC 3ɸ penggiling bahan baku 2 220/382 50 0.75 1700
5 motor AC 3ɸ penggiling adonan 1 220/383 50 0.75 1700
6 motor AC 3ɸ penggiling adonan 2 220/384 50 0.75 1700
7 motor AC 1ɸ vacum kemasan 220 50 0.8 1300
8 pemanas mesin press kemasan 220 50
9 freezer 1 pendingin produk 220 50
10 freezer 2 pendingin produk 220 50
11 Air Conditioning lobby 220 50
12 Air Conditioning musholla 220 50
13 Air Conditioning ruang direktur 220 50
14 Air Conditioning ruang meeting 1 220 50
15 Air Conditioning kantor direksi 220 50
16 Air Conditioning manager administrasi 220 50
17 Air Conditioning klinik 220 50
18 Air Conditioning staff keuangan 220 50
19 Air Conditioning manager keuangan 220 50
20 Air Conditioning ruang meeting 3 220 50
21 Air Conditioning manager teknik 220 50
22 Air Conditioning staff teknik 220 50
23 Air Conditioning staff gudang 220 50
24 Air Conditioning ruang higenis barang baku 220 50
25 Air Conditioning ruang bumbu 220 50
26 Air Conditioning ruang sanitasi 220 50
27 Air Conditioning ruang pembersihan 220 50
28 Air Conditioning ruang pengolahan bahan baku 220 50
29 Air Conditioning ruang proses bahan jadi 220 50
30 Air Conditioning ruang pengemasan 220 50
31 Air Conditioning quality control 220 50
32 Air Conditioning staff produksi 220 50
Jumlah
ominal dan Arus Asut
Ia Pout In (A)
pf Pin (kVA) Asut
(A) (kW) Y Δ
0.75 6.6430034 1.5 3.69055742179299 1.40625 Langsung
0.65 24.56435 6 7.900814 13.64686122 5.2 Δ-Y
0.65 24.56435 6 7.900814 13.64686122 5.2 Δ-Y
0.65 24.56435 6 7.900814 13.64686122 5.2 Δ-Y
0.65 24.56435 6 7.900814 13.64686122 5.2 Δ-Y
0.65 24.56435 6 7.900814 13.64686122 5.2 Δ-Y
0.7 2.3930351 1 1.329464 2.29634684 0.875 Δ-Y
0.75 6.5454545 1 3.63636363636364 0.8 Langsung
0.7 7.3636364 2 4.09090909090909 0.9 Langsung
0.7 7.3636364 2 4.09090909090909 0.9 Langsung
0.75 4.6636364 0.6 2.59090909090909 0.57 Langsung
0.75 4.6636364 0.6 2.59090909090909 0.57 Langsung
0.75 4.6636364 0.84 2.59090909090909 0.57 Langsung
0.75 4.6636364 0.84 2.59090909090909 0.57 Langsung
0.75 7.0363636 0.84 3.90909090909091 0.86 Langsung
0.75 7.0363636 0.84 3.90909090909091 0.86 Langsung
0.75 7.0363636 0.84 3.90909090909091 0.86 Langsung
0.75 7.0363636 0.84 3.90909090909091 0.86 Langsung
0.75 7.0363636 0.84 3.90909090909091 0.86 Langsung
0.75 7.0363636 0.84 3.90909090909091 0.86 Langsung
0.75 7.0363636 0.84 3.90909090909091 0.86 Langsung
0.75 7.0363636 0.84 3.90909090909091 0.86 Langsung
0.75 7.0363636 0.84 3.90909090909091 0.86 Langsung
0.75 7.0363636 0.84 3.90909090909091 0.86 Langsung
0.75 7.0363636 0.84 3.90909090909091 0.86 Langsung
0.75 7.0363636 0.84 3.90909090909091 0.86 Langsung
0.75 7.0363636 0.84 3.90909090909091 0.86 Langsung
0.75 9.8181818 0.84 5.45454545454545 1.2 Langsung
0.75 9.8181818 0.84 5.45454545454545 1.2 Langsung
0.75 9.8181818 0.84 5.45454545454545 1.2 Langsung
0.75 7.0363636 0.84 3.90909090909091 0.86 Langsung
0.75 4.6636364 0.84 2.59090909090909 0.57 Langsung
304.41233 55.5 140.3877 70.53065295
Tabel 3.5. Perhitungan Penampang kawat dan Drop Tegangan Instalasi Day

P (Daya)
No Jenis Beban Kegunaan E (Volt) In
Watt

1 motor AC 1ɸ pompa air 1500 220 6.818182


2 motor AC 3ɸ penggiling bumbu 6000 380 15.78947
3 motor AC 3ɸ penggiling bahan baku 1 6000 380 15.78947
4 motor AC 3ɸ penggiling bahan baku 2 6000 380 15.78947
5 motor AC 3ɸ penggiling adonan 1 6000 380 15.78947
6 motor AC 3ɸ penggiling adonan 2 6000 380 15.78947
7 motor AC 1ɸ vacum kemasan 1000 220 4.545455
8 pemanas mesin press kemasan 800 220 3.636364
9 freezer 1 pendingin produk 2000 220 9.090909
10 freezer 2 pendingin produk 2000 220 9.090909
11 Air Conditioning lobby 400 220 1.818182
12 Air Conditioning musholla 400 220 1.818182
13 Air Conditioning ruang direktur 400 220 1.818182
14 Air Conditioning ruang meeting 1 400 220 1.818182
15 Air Conditioning kantor direksi 600 220 2.727273
16 Air Conditioning manager administrasi 600 220 2.727273
17 Air Conditioning klinik 400 220 1.818182
18 Air Conditioning staff keuangan 600 220 2.727273
19 Air Conditioning manager keuangan 600 220 2.727273
20 Air Conditioning ruang meeting 3 600 220 2.727273
21 Air Conditioning manager teknik 600 220 2.727273
22 Air Conditioning staff teknik 600 220 2.727273
23 Air Conditioning staff gudang 600 220 2.727273
24 Air Conditioning ruang higenis barang baku 840 220 3.818182
25 Air Conditioning ruang bumbu 840 220 3.818182
26 Air Conditioning ruang sanitasi 840 220 3.818182
27 Air Conditioning ruang pembersihan 840 220 3.818182
28 Air Conditioning ruang pengolahan bahan baku 840 220 3.818182
29 Air Conditioning ruang proses bahan jadi 840 220 3.818182
30 Air Conditioning ruang pengemasan 840 220 3.818182
31 Air Conditioning quality control 840 220 3.818182
32 Air Conditioning staff produksi 600 220 2.727273
51420
Drop Tegangan Instalasi Daya

L1 A1 R1 A2 R2 Kabel
Vd yang R Kabel
KHA
diijinkan (ΔV) (Ω/Km)
(m) (mm²) (Ω) (mm²) (Ω)
11 12 0.230047 1.61333 2.5 85.68 7.14 26 NYM
19 20 0.514048 1.20333 6 59.4 2.97 60 NYFGBY
19 11 0.282727 1.20333 6 32.67 2.97 60 NYFGBY
19 11 0.282727 1.20333 6 32.67 2.97 60 NYFGBY
19 16 0.411239 1.20333 6 47.52 2.97 60 NYFGBY
19 16 0.411239 1.20333 6 47.52 2.97 60 NYFGBY
11 8 0.102243 2.42 4 35.76 4.47 26 NYM
11 7 0.07157 3.025 4 31.29 4.47 26 NYM
11 10 0.255608 1.21 4 44.7 4.47 26 NYM
11 11 0.281169 1.21 4 49.17 4.47 26 NYM
11 12 0.061346 6.05 2.5 85.68 7.14 26 NYM
11 15 0.076682 6.05 2.5 107.1 7.14 26 NYM
11 14 0.07157 6.05 2.5 99.96 7.14 26 NYM
11 9 0.046009 6.05 2.5 64.26 7.14 26 NYM
11 11 0.084351 4.03333 2.5 78.54 7.14 26 NYM
11 13 0.099687 4.03333 2.5 92.82 7.14 26 NYM
11 12 0.061346 6.05 2.5 85.68 7.14 26 NYM
11 12 0.092019 4.03333 2.5 85.68 7.14 26 NYM
11 11 0.084351 4.03333 2.5 78.54 7.14 26 NYM
11 11 0.084351 4.03333 2.5 78.54 7.14 26 NYM
11 16 0.122692 4.03333 2.5 114.24 7.14 26 NYM
11 16 0.122692 4.03333 2.5 114.24 7.14 26 NYM
11 20 0.153365 4.03333 2.5 142.8 7.14 26 NYM
11 19 0.203975 2.88095 2.5 135.66 7.14 26 NYM
11 19 0.203975 2.88095 2.5 135.66 7.14 26 NYM
11 21 0.225446 2.88095 2.5 149.94 7.14 26 NYM
11 22 0.236182 2.88095 2.5 157.08 7.14 26 NYM
11 18 0.19324 2.88095 2.5 128.52 7.14 26 NYM
11 18 0.19324 2.88095 2.5 128.52 7.14 26 NYM
11 20 0.214711 2.88095 2.5 142.8 7.14 26 NYM
11 21 0.225446 2.88095 2.5 149.94 7.14 26 NYM
11 25 0.191706 4.03333 2.5 178.5 7.14 26 NYM
403
Ukuran E (Volt) E%

3 x 2,5 mm² 0.079577 0.036171


4 x 6 mm² 0.265816 0.069952
4 x 6 mm² 0.483302 0.127185
4 x 6 mm² 0.483302 0.127185
4 x 6 mm² 0.33227 0.087439
4 x 6 mm² 0.33227 0.087439
3 x 4 mm² 0.12711 0.057777
3 x 4 mm² 0.116215 0.052825
3 x 4 mm² 0.203376 0.092444
3 x 4 mm² 0.184887 0.08404
3 x 2,5 mm² 0.021221 0.009646
3 x 2,5 mm² 0.016976 0.007717
3 x 2,5 mm² 0.018189 0.008268
3 x 2,5 mm² 0.028294 0.012861
3 x 2,5 mm² 0.034725 0.015784
3 x 2,5 mm² 0.029382 0.013356
3 x 2,5 mm² 0.021221 0.009646
3 x 2,5 mm² 0.031831 0.014469
3 x 2,5 mm² 0.034725 0.015784
3 x 2,5 mm² 0.034725 0.015784
3 x 2,5 mm² 0.023873 0.010851
3 x 2,5 mm² 0.023873 0.010851
3 x 2,5 mm² 0.019099 0.008681
3 x 2,5 mm² 0.028145 0.012793
3 x 2,5 mm² 0.028145 0.012793
3 x 2,5 mm² 0.025465 0.011575
3 x 2,5 mm² 0.024307 0.011049
3 x 2,5 mm² 0.029709 0.013504
3 x 2,5 mm² 0.029709 0.013504
3 x 2,5 mm² 0.026738 0.012154
3 x 2,5 mm² 0.025465 0.011575
3 x 2,5 mm² 0.015279 0.006945
Tabel 3.6. Pembagian PHB dan Sistem Pengaman
L2 V I P
PHB Grup
(m) (Volt) (A) (kVA)
1 12 220 6.643003359227 1500
1 1
20 220/380 24.56435019945 6000
2
11 220/381 24.56435019945 6000
3
2 2
11 220/382 24.56435019945 6000
4
16 220/383 24.56435019945 6000
5
3 3
16 220/384 24.56435019945 6000
6
7 8 220 2.393035128236 1000
8 7 220 6.545454545455 800
9 4 10 220 7.363636363636 2000 4
10 11 220 7.363636363636 2000
11 12 220 4.663636363636 400
12 15 220 4.663636363636 400
13 14 220 4.663636363636 400
14 5 9 220 4.663636363636 400 5
15 11 220 7.036363636364 600
16 13 220 7.036363636364 600
17 12 220 7.036363636364 400
18 12 220 7.036363636364 600
19 6 11 220 7.036363636364 600 6
20 11 220 7.036363636364 600
21 16 220 7.036363636364 600
22 16 220 7.036363636364 600
23 20 220 7.036363636364 600
24 7 19 220 7.036363636364 840 7
25 19 220 7.036363636364 840
26 21 220 7.036363636364 840
27 22 220 7.036363636364 840
28 18 220 9.818181818182 840
29 18 220 9.818181818182 840
8 8
30 20 220 9.818181818182 840
31 21 220 7.036363636364 840
32 25 220 4.663636363636 600
Tabel 3.6. Pembagian PHB dan Sistem Pengaman
Jenis E E Sistem
Jenis Beban
Kabel (Volt) (%) Proteksi
motor AC 1ɸ NYM 0.0795772855 0.036171493391 MCB
PENGAMAN
motor AC 3ɸ NYFGBY 0.2658160553 0.069951593497
THERMAL 3 FASA
PENGAMAN
motor AC 3ɸ NYFGBY 0.4833019187 0.12718471545
THERMAL 3 FASA
PENGAMAN
motor AC 3ɸ NYFGBY 0.4833019187 0.12718471545
THERMAL 3 FASA
PENGAMAN
motor AC 3ɸ NYFGBY 0.3322700691 0.087439491872
THERMAL 3 FASA
PENGAMAN
motor AC 3ɸ NYFGBY 0.3322700691 0.087439491872
THERMAL 3 FASA
motor AC 1ɸ NYM 0.1271100264 0.057777284745 MCB
pemanas NYM 0.1162148813 0.052824946053 MCB
freezer 1 NYM 0.2033760423 0.092443655592 MCB
freezer 2 NYM 0.1848873112 0.084039686902 MCB
Air Conditioning NYM 0.0212206095 0.009645731571 MCB
Air Conditioning NYM 0.0169764876 0.007716585257 MCB
Air Conditioning NYM 0.0181890938 0.008267769918 MCB
Air Conditioning NYM 0.0282941459 0.012860975428 MCB
Air Conditioning NYM 0.0347246337 0.015783924389 MCB
Air Conditioning NYM 0.0293823823 0.013355628329 MCB
Air Conditioning NYM 0.0212206095 0.009645731571 MCB
Air Conditioning NYM 0.0318309142 0.014468597356 MCB
Air Conditioning NYM 0.0347246337 0.015783924389 MCB
Air Conditioning NYM 0.0347246337 0.015783924389 MCB
Air Conditioning NYM 0.0238731856 0.010851448017 MCB
Air Conditioning NYM 0.0238731856 0.010851448017 MCB
Air Conditioning NYM 0.0190985485 0.008681158414 MCB
Air Conditioning NYM 0.0281452294 0.012793286083 MCB
Air Conditioning NYM 0.0281452294 0.012793286083 MCB
Air Conditioning NYM 0.0254647313 0.011574877885 MCB
Air Conditioning NYM 0.0243072436 0.011048747072 MCB
Air Conditioning NYM 0.0297088532 0.013504024199 MCB
Air Conditioning NYM 0.0297088532 0.013504024199 MCB
Air Conditioning NYM 0.0267379679 0.012153621779 MCB
Air Conditioning NYM 0.0254647313 0.011574877885 MCB
Air Conditioning NYM 0.0152788388 0.006944926731 MCB
L2 = Jarak PHB ke beban terjauh dalam satu grup
NYFGbY 4 x 25 mm²
8A
100 A
30 A

NYFGbY 4 x 25 mm² 30 A
100 A
30 A

NYFGbY 4 x 25 mm² 30 A
100 A
30 A

PLN 10 A
NYFGbY 4 x 25 mm²
10 A

224 A 100 A 10 A

NYFGBY 4 x 50 mm² 10 A

GENSET 10 A

10 A

25 A
NYFGbY 4 x 25 mm²
100 A 10 A

35 A

10 A

63 A

NYFGbY 4 x 25 mm² 10 A

100 A 10 A

10 A
10 A

10 A

NYFGbY 4 x 25 mm² 10 A

100 A 10 A

10 A

10 A

10 A

10 A

NYFGbY 4 x 25 mm² 25 A
100 A
10 A

35 A

10 A
NYFGBY 3 x 2.5 mm²
M1
NYFGBY 4 x 6 mm²
M2
NYFGBY 4 x 6 mm²
M3
NYFGBY 4 x 6 mm²
M4
NYFGBY 4 x 6 mm²
M5
NYFGBY 4 x 6 mm²
M6
NYM 3 x 2,5 mm²
M7
NYM 3 x 2,5 mm²
HEAT
NYM 3 x 2,5 mm²
FREEZER
NYM 3 x 2,5 mm²
FREEZER
NYM 3 x 2,5 mm²
AC 1
NYM 3 x 2,5 mm²
AC 2
NYM 3 x 2,5 mm²
AC 3
NYM 3 x 2,5 mm²
AC 4
NYM 3 x 2,5 mm²
AC 5
NYM 3 x 2,5 mm²
AC 6

NYM 3 x 2,5 mm²


AC 7
NYM 3 x 2,5 mm²
AC 8
NYM 3 x 2,5 mm²
AC 9
NYM 3 x 2,5 mm²
AC 10
NYM 3 x 2,5 mm²
AC 11
NYM 3 x 2,5 mm²
AC 12
NYM 3 x 2,5 mm²
AC 13
NYM 3 x 2,5 mm²
AC 14
NYM 3 x 2,5 mm²
AC 15
NYM 3 x 2,5 mm²
AC 16
NYM 3 x 2,5 mm²
AC 17
NYM 3 x 2,5 mm²
AC 18
NYM 3 x 2,5 mm²
AC 19
NYM 3 x 2,5 mm²
AC 20
NYM 3 x 2,5 mm²
AC 21
NYM 3 x 2,5 mm²
AC 22