Meralco What Is New
Meralco What Is New
SERVICE
CONNECTION:
WHAT’S NEW?
• Single-metered
• Multiple-metered: common meter center, meter
center per floor (optional)
8. Project-Covered Application
(installation of new / or upgrade of distribution facilities)
(Primary Service):
• Three-phase: 13.8 kv, 34.5 kv, 115 kv
-Meter owned by Meralco, transformers customer-owned
-usually applicable to loads beyond serving capacity of
secondary-metered services
Service Standards Team
Power Services
Primary Metering
Legend:
Black Ink
Customer Owned
Blue Ink
LOCATION 1-BANK
Ground Floor
(W) 5 m X (D) 4 m X
2nd Floor
(H) 3 m
1st Basement
NOTE: W = Width
D = Depth
H = Height (Headroom)
EXHAUST
EXHAUST FAN
DUCT
DEADFRONT
1000
000
800
TO
!
DT
T
8
"
" #
#
$
$ #
# !!
!!
2000
27KV
LOUVERED
STEEL
1000
DOOR
SETBACK
ACCESS ROAD
(VARIES)
600
900
SERVICE
CABLES
EXHAUST
FAN
EXHAUST
DUCT
MAIN
BREAKER
3000
DEADFRONT
DT
LOW-VOLTAGE
SERVICE CABLESService Standards Team
Power Services
Vault Requirement for
Padmounted DTs
MINIMUM VAULT DIMENSION
LOCATION 2-BANKS
(W) 8 m X (D) 4 m
Ground Floor
X (H) 3 m
(W) 8 m X (D) 6 m
2nd Floor
X (H) 4 m
(W) 8 m X (D) 6 m
1st Basement
X (H) 3 m
NOTE: W = Width
D = Depth
H = Height (Headroom)
4000
1500
EXHAUST FAN
AND DUCT
CUSTOMER’S
MAIN
SECONDARY
CIRCUIT
BREAKER
" #
" #
$
$ #
# !
!
TRANSFORMER
3000
0
2500
ACCESS DOOR
TRANSFORMER
1000
SIDE VIEW
1100
SECONDARY
PRIMARY
CABLE
CABLE DUCTS
Service Standards Team DUCTS
Power Services
G/F Transformer Vault 8000
(Double Bank)
1600 3300 3100
CUSTOMER’S MAIN
SECONDARY CIRCUIT
BREAKERS METER #2
METER #1
400
2400
TRANSFORMER TRANSFORMER
4000
000
BANK #1 BANK #2
EXHAUST FANS
AND DUCTS
S2
PRIMARY TRANSFORMER
CABLE DUCTS ACCESS DOORS
PLAN
2500
• Single-metered
• Multiple-metered:
-common
common meter center
-meter center per floor (optional)
Legend:
Black Ink
Customer Owned
Blue Ink
Legend:
Black Ink
Customer Owned
Blue Ink
8. Project-Covered Application
(installation of new / or upgrade of distribution facilities)
DISTRIBUTION EXTENSION OF
TRANSFORMER FACILITIES
SERVICE
DROP
8. Project-Covered Application
(installation of new / or upgrade of distribution facilities)
• Roles, Responsibilities
Meralco:
1. Receive application
2 Design proposed facilities
2.
3. Advise service entrance construction / location
4. Secure permits / ROW
5. Present contract to applicant
6. Accept payment / charges / signed contract
7. Commence installation of proposed facilities
8. Energize service
8. Project-Covered Application
(installation of new / or upgrade of distribution facilities)
• Roles, Responsibilities
Applicant:
1. Apply for electric service / submit requirements
2 Construct service entrance according to specs
2.
3. Accept contract / conditions of electric service
4. Advise Meralco to inspect service entrance
5. Secure CEI
6. Pay required charges / deposit