ELECTRIC

SERVICE
CONNECTION:
WHAT’S NEW?

Service Standards Team


Power Services
OUTLINE
ELECTRIC SERVICE CONNECTION:WHAT’S NEW?

1. Where to apply for electric service?

• Business Centers (for loads < or = 50 kw)


• Sales Offices (for loads >50 kw, underground
Distribution system service, network area service)

2. What service voltages are available?


(Secondary Service):
• Single-phase: 230 volts
• Three-phase: 230 volts, 460 volts, 400 volts

Service Standards Team


Power Services
OUTLINE
ELECTRIC SERVICE CONNECTION:WHAT’S NEW?

2. What service voltages are available?


(Primary Service):
• Three-phase: 13.8 kv, 34.5 kv, 115 kv

3. Transformer types for Secondary service voltage


• Pole-mtd transformers
• Pad-mtd transformers (outdoor)
• Transformer vault room: pad-mtd, Deadfront DT

Service Standards Team


Power Services
OUTLINE
ELECTRIC SERVICE CONNECTION:WHAT’S NEW?

4. Transformer Bank Capacities (secondary service)

• 1000 kva: 230 volts, 400 volts


• 2000 kva: 460 volts

5. Transformer vault room locations


• Ground level
• Second level
• 1st basement level (for multiple basements)

Service Standards Team


Power Services
OUTLINE
ELECTRIC SERVICE CONNECTION:WHAT’S NEW?

6. Secondary metering schemes

• Single-metered
• Multiple-metered: common meter center, meter
center per floor (optional)

7. Initial requirements for electric service


• Application Letter
• Electrical Plans
• Valid ID
• Authority to Occupy

Service Standards Team


Power Services
OUTLINE
ELECTRIC SERVICE CONNECTION:WHAT’S NEW?

8. Project-Covered Application
(installation of new / or upgrade of distribution facilities)

• General Process Flow


• Roles, Responsibilities
• Timelines

Service Standards Team


Power Services
ELECTRIC SERVICE CONNECTION:WHAT’S NEW?

1.Where to apply for electric service?

• Business Centers (for loads < or = 50 kw)

• Sales Offices (for loads >50


50 kw, underground
Distribution system service, network area service)

North Sales – Valenzuela, M.M.


Central Sales – Meralco Center, Pasig City
South Sales – Sta. Rosa, Laguna

Service Standards Team


Power Services
Service Standards Team
Power Services
ELECTRIC SERVICE CONNECTION:WHAT’S NEW?

1.Where to apply for electric service?


Sales Office:
• Connected load per meter must be > 50 kw
• site will be served / sourced from an
underground distribution system
• site is located within the Network Area
(portion of Binondo, Quiapo, Sta. Cruz..)

Service Standards Team


Power Services
ELECTRIC SERVICE CONNECTION:WHAT’S NEW?

2. What service voltages are available?


(Secondary Service):
• Single-phase: 230 volts
-maximum of 75kva only
• Three-phase:
Three phase: 230 volts, 460 volts, 400 volts
-Transformers / meters owned by Meralco

(Primary Service):
• Three-phase: 13.8 kv, 34.5 kv, 115 kv
-Meter owned by Meralco, transformers customer-owned
-usually applicable to loads beyond serving capacity of
secondary-metered services
Service Standards Team
Power Services
Primary Metering

Legend:

Red Ink / Asterisk - Meralco-Owned

Black Ink
Customer Owned
Blue Ink

Service Standards Team


Power Services
Service Standards Team
Power Services
ELECTRIC SERVICE CONNECTION:WHAT’S NEW?

3. Transformer types for Secondary service voltage


• Pole-mtd transformers
-applicable up to 300 kva maximum only

• Transformer vault room: pad


pad-mtd,
mtd, Deadfront DT
-applicable for loads > 300 kva
-used in underground distribution system
-used in Network area

• Pad-mtd transformers (outdoor)

Service Standards Team


Power Services
Overhead Distribution Transformers

Service Standards Team


Power Services
Service Standards Team
Power Services
Secondary Metering

Service Standards Team


Power Services
ELECTRIC SERVICE CONNECTION:WHAT’S NEW?

4. Transformer Bank Capacities (secondary service)

1000 kva: 230 volts, 400 volts


2000 kva: 460 volts

5. Transformer vault room locations


Ground level
Second level
1st basement level (for multiple basements)

Note:also applies to primary-metering vault room

Service Standards Team


Power Services
Vault Requirement for Deadfront
DTs
MINIMUM VAULT DIMENSION

LOCATION 1-BANK

Ground Floor

(W) 5 m X (D) 4 m X
2nd Floor
(H) 3 m

1st Basement

NOTE: W = Width
D = Depth
H = Height (Headroom)

Service Standards Team


Power Services
GROUND FLOOR 4000
TRANSFORMER VAULT 2000 2000
(SIDE ELEVATION)

EXHAUST
EXHAUST FAN
DUCT

DEADFRONT

1000
000
800
TO
!

DT

T
8
"
" #
#
$
$ #
# !!
!!

2000
27KV
LOUVERED
STEEL
1000

DOOR

SETBACK
ACCESS ROAD
(VARIES)
600

900
SERVICE
CABLES

GROUND 700 700 PRIMARY CABLES


ROD Service Standards Team
25 Power Services
25
GROUND FLOOR
TRANSFORMER VAULT 5000
(FRONT ELEVATION) 1100 1400 1400 1100

EXHAUST
FAN

EXHAUST
DUCT
MAIN
BREAKER
3000

DEADFRONT
DT

LOW-VOLTAGE
SERVICE CABLESService Standards Team
Power Services
Vault Requirement for
Padmounted DTs
MINIMUM VAULT DIMENSION

LOCATION 2-BANKS

(W) 8 m X (D) 4 m
Ground Floor
X (H) 3 m
(W) 8 m X (D) 6 m
2nd Floor
X (H) 4 m
(W) 8 m X (D) 6 m
1st Basement
X (H) 3 m

NOTE: W = Width
D = Depth
H = Height (Headroom)

Service Standards Team


Power Services
G/F Transformer Vault

4000

1500
EXHAUST FAN
AND DUCT
CUSTOMER’S
MAIN
SECONDARY
CIRCUIT
BREAKER
" #
" #
$
$ #
# !
!

TRANSFORMER

3000
0
2500

ACCESS DOOR

TRANSFORMER

1000
SIDE VIEW
1100

SECONDARY
PRIMARY
CABLE
CABLE DUCTS
Service Standards Team DUCTS
Power Services
G/F Transformer Vault 8000
(Double Bank)
1600 3300 3100
CUSTOMER’S MAIN
SECONDARY CIRCUIT
BREAKERS METER #2
METER #1
400
2400

TRANSFORMER TRANSFORMER

4000
000
BANK #1 BANK #2

EXHAUST FANS
AND DUCTS
S2

PRIMARY TRANSFORMER
CABLE DUCTS ACCESS DOORS
PLAN
2500

Service Standards Team


3000 3000 Power Services
ELECTRIC SERVICE CONNECTION:WHAT’S NEW?

6. Secondary metering schemes

• Single-metered
• Multiple-metered:
-common
common meter center
-meter center per floor (optional)

Service Standards Team


Power Services
Single Metering

Legend:

Red Ink / Asterisk - Meralco-Owned

Black Ink
Customer Owned
Blue Ink

Service Standards Team


Power Services
Multi- Metering – Common
Meter Center

Legend:

Red Ink / Asterisk - Meralco-Owned

Black Ink
Customer Owned
Blue Ink

Service Standards Team


Power Services
Multi- Metering per Floor

Service Standards Team


Power Services
ELECTRIC SERVICE CONNECTION:WHAT’S NEW?

7. Initial requirements for electric service


• Application Letter
-to formalize the applicant’s request for electric service
• Electrical Plans
-electrical
electrical load schedules / single
single-line
line diagram / site devt
-transformer vault plans / designs
-customer substation plans / designs
• Valid ID
-Individual / corporation / business
• Authority to Occupy

Service Standards Team


Power Services
ELECTRIC SERVICE CONNECTION:WHAT’S NEW?

8. Project-Covered Application
(installation of new / or upgrade of distribution facilities)

General Process Flow


Roles, Responsibilities
Timelines

Service Standards Team


Power Services
Project-Covered Application:

DISTRIBUTION EXTENSION OF
TRANSFORMER FACILITIES

SERVICE
DROP

METER ADDITIONAL Existing


FACILITY facility

beyond 30m from the nearest pole


Applying
customer
Service Standards Team
Power Services
Service Standards Team
Power Services
Service Standards Team
Power Services
ELECTRIC SERVICE CONNECTION:WHAT’S NEW?

8. Project-Covered Application
(installation of new / or upgrade of distribution facilities)

• Roles, Responsibilities
Meralco:
1. Receive application
2 Design proposed facilities
2.
3. Advise service entrance construction / location
4. Secure permits / ROW
5. Present contract to applicant
6. Accept payment / charges / signed contract
7. Commence installation of proposed facilities
8. Energize service

Service Standards Team


Power Services
ELECTRIC SERVICE CONNECTION:WHAT’S NEW?

8. Project-Covered Application
(installation of new / or upgrade of distribution facilities)

• Roles, Responsibilities
Applicant:
1. Apply for electric service / submit requirements
2 Construct service entrance according to specs
2.
3. Accept contract / conditions of electric service
4. Advise Meralco to inspect service entrance
5. Secure CEI
6. Pay required charges / deposit

Service Standards Team


Power Services
8. Project-Covered Application
(installation of new / or upgrade of distribution facilities)
•Timelines:

Project Execution Time Varies:


M Reckoning Date is Completion of ALL Requirements
(Service Entrance, Civil Works, CFEI, Contract,
Payment, etc)
M Factors that affect execution time:
M Scope of Work
M Required Interruption (Local or Pre-Arranged)
M Work Time Restriction
M Permits and Right of Way
M Others (3rd Party, Typhoon, etc)

Service Standards Team


Power Services
Service Standards Team
Power Services
Thank You