PE3 Shift Report December 17, 2022 (PM Shift)

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 5

POLYETHYLENE 3 DEPARTMENT

SHIFT-IN-CHARGE REPORT

DATE: December 17, 2022 DAY M T W Thu F S Su


SHIFT PM Shift (1900H– 0730H)
Eson, Julius, Erwin
SS/ Team Leader

Panel Engineers Agatha, Genessa, Topher

Field Technicians Hannah, Windel, Edward, Onemig, Julius, Jalil

Conducted LEL monitoring at the PE3 plant during the incident happened
HSE Concerns/ Highlights
at OSBL Magellan (Popping of PSV) – No observed VOC/LEL
General activities:
 Accomplished High level checklist – Ongoing
 Accomplished CPC checklist – Ongoing
 Verification insulation list – Ongoing

UTILITIES:

 Draining of condensate along flash line


 Sample coolant system A/B
 Draining of water boots
WET END:

Activities Fractionation

 Stop Hexene pump for preparation of FV20257 pull out.


 Pulled out FV20257for rectification.
Feedstock
 Depressurize Acetylene converter V2011 in preparation for
feeding of C2 up to 5.5 Mpag – completed
 Pressure up acetylene converter V2011- completed
 Pressure up Ethylene Treater V2013B up to 5.5 Mpag – ongoing
 Leak checked, purging, and conducted H20 sample at newly
installed tubing at hexene jumper line. – no leak

 Analyzer lining up;

Revision No.0 Effectivity: November 24, 2018 Page 1 of 1


POLYETHYLENE 3 DEPARTMENT
SHIFT-IN-CHARGE REPORT
TAG # Description Status
AT-20822 V2010 Outlet H2S Isolated due to
icing observed
inside sampling
box
AT-20491 V2011 Inlet Isolated due to
icing observed
inside sampling
box
AT-20412 V2011 BTM No barrier
AT-20940 V2012A/B Inlet Lined up in service
AT-20919 V2012A/B Outlet Lined up in service
AT-20922 V2012A/B BTM Observed with
possible hexene
content – for
purging
AT-20933 V2012A/B Vent Not line up since
the system is not
yet in service
AT-43532 V4116/V4117 LEL Observed with
traces of water –
for purging

Reactor
 Lined up and start blowback of SR4116 and SR4117 – both
functioning
 Leak checked and pressure test of 4 reinstated PCVs –

Revision No.0 Effectivity: November 24, 2018 Page 1 of 1


POLYETHYLENE 3 DEPARTMENT
SHIFT-IN-CHARGE REPORT
completed with findings
- With minimal leak at PCV42629 D/S flange
- PCV42629 – 5.4mapg for 30 mins
- PCV42632 – 0.5 mpag for 30 mins
- PCV41632 – 3.76 mpag for 2 hours
- PCV41629 – 9. 63 mpag for 2 hours

 Monitoring the sequence of sampling system – no encountered


issue

Catalyst Preparation
 Testing of P3103A for cat in and cat out to Reactor A
Findings: for cat in at 100% output the triplex pump AC control
loss from cascade control – for rectification
Flash and Purge
 Lined up and start blowback of SR5001 – functioning

Alkyl
 Continuation of purging, checked moisture of alkyl pumps;
P4005 – 4.96ppm
P4205 – 5.1 ppm
P4260 – 9.4 ppm (TIbal)
WET END:

 Conducted tuning of additive system 1 for irgafos 168 –


completed

Safety System Deactivation


Status
SSD Request Status

System
Request No. Description Status Expiry Date
Deactivated
PE3-2022- Fire and Gas
Faulty gas detector Valid 05/Jan/2023
149-3 Detection System

to able to continue to run


tha pump and not tripping
to the low current SP
PE3-2022- since the MMC SP
S2021 Valid 19/Dec/2022
230 already changed at lower
SP

PE3-2022- to be able to open XV-


S-009 Valid 19/Dec/2022
229 20007 for ethylene train

Revision No.0 Effectivity: November 24, 2018 Page 1 of 1


POLYETHYLENE 3 DEPARTMENT
SHIFT-IN-CHARGE REPORT
pressurization

testing of short stop refill


PE3-2022- valve
C-4301 Valid 20/Dec/2022
228

PE3-2022- Additive System test run


I-6105 Valid 19/Dec/2022
227

Advanced Permit
Service Vehicle – AJA 3815 – reported with battery issue
Follow up Activities /
Radio – 12
Turnover Cellphone – 1

Revision No.0 Effectivity: November 24, 2018 Page 1 of 1


POLYETHYLENE 3 DEPARTMENT
SHIFT-IN-CHARGE REPORT

Revision No.0 Effectivity: November 24, 2018 Page 1 of 1

You might also like