SHIFT-IN-CHARGE REPORT
Conducted LEL monitoring at the PE3 plant during the incident happened
HSE Concerns/ Highlights
at OSBL Magellan (Popping of PSV) – No observed VOC/LEL
General activities:
Accomplished High level checklist – Ongoing
Accomplished CPC checklist – Ongoing
Verification insulation list – Ongoing
UTILITIES:
Activities Fractionation
Reactor
Lined up and start blowback of SR4116 and SR4117 – both
functioning
Leak checked and pressure test of 4 reinstated PCVs –
Catalyst Preparation
Testing of P3103A for cat in and cat out to Reactor A
Findings: for cat in at 100% output the triplex pump AC control
loss from cascade control – for rectification
Flash and Purge
Lined up and start blowback of SR5001 – functioning
Alkyl
Continuation of purging, checked moisture of alkyl pumps;
P4005 – 4.96ppm
P4205 – 5.1 ppm
P4260 – 9.4 ppm (TIbal)
WET END:
System
Request No. Description Status Expiry Date
Deactivated
PE3-2022- Fire and Gas
Faulty gas detector Valid 05/Jan/2023
149-3 Detection System
Advanced Permit
Service Vehicle – AJA 3815 – reported with battery issue
Follow up Activities /
Radio – 12