CAREER OBJECTIVE:
EDUCATIONAL QUALIFICATION:
CAREER PROFILE
1|Page
2) Organization: FMSCO
Experience: FEB 2019–JAN2020
Designation: E&I SUPERVISOR
Project: Ma’aden Cell-3 area Ras Al-Khair. (MA’ADEN)
3) Organization: RS ENGINEERING
Experience: AUG 2016–MAY 2018
Designation: Maintenance Technician
Assign targets for accomplishments and ensure targets are met on daily basis for all
electrical groups at site.
Plans the execution of all electrical related works and coordinates the works to
mechanical and civil groups.
Give clients and customers training on the usage of panel boards, carrying out works
in customer’s premises in accordance with client’s quality standard.
Supports the Asst. Project Manager in accomplishing all the goals and targets for the
electrical groups at site, ensures that all the site works are done according to all
applicable quality standards.
Directly responsible for the safety of all electrical groups’ personnel of the project by
ensuring that the project execution will be done according to all applicable health,
safety, sanitary and environmental standards.
Performs other related duties as may be required by the Asst. Project Manager,
Coordinate with Electrical Supervisors and Engineers to monitor and close punch list
items prior to energization.
Ensure that all quality control document forms and reports are adequate and properly
documented and filed as per ISO 9001:2008 and schedule Q requirements
2|Page
Installation of Cable tray and conduit Installation as per the NEMA, NEC standards and
as per the manufacturer’s instruction
Responsible for Insulation resistance (IR test) of cable before and after installation
and loop checking before termination as per the standards.
Responsible for Instrument Calibrations such as PT, LT, TT, FT, TS, LS, PS, PG,
TG, RTD, Control valves and Thermocouples.
Installation of control panels, Junction boxes, Power Distribution Panels, Testing and
termination, of power and control cables.
Fabrication and Installation of Cable trays/ladders for cable pulling and laying.
Glanding and termination of multi core control cables, power cables, instrument
cables and FF cables.
Installation of grounding cables & all types of cad weld.
Check and confirm that all punch list items have been identified and closed out.
Prepare engineering and construction scope for both man-hours and equipment
estimates and assist in the review of proposed schedules
Cooperating closely with the Safety team to ensure that HSE standards are maintained
and that safety issues are monitored and addressed by the site supervision team
3|Page
Responsible for assisting the implementation of QA/QC inspection test plans (ITP),
check lists and test reports for various projects in aspect of installation, testing and
pre-commissioning and energization
All installation shall be done as per the standards and procedures and IFC
drawings
Follow up to close all the punch list and surveillance report and NCR with the
corresponding team
Responsible for making the loop Folders and Pre-commissioning packages and
attending the loop checking with the client.
Responsible to maintain all the documents for the final hand over as per the
project procedures.
Ensure that the work is being taken in good Engineering Practices and conform
to the standards, NEC, NEMA and other relevant standards, Project
requirements and scope of works
Sex : Male
Religion : Hindu
Marital status : Married
Nationality : Indian
Languages Known : English, Hindi, Tamil and Arabic
I hereby declare that all the information given above is true to the best of my
knowledge.
Ayyanar Mariappan
5|Page
Almas Syed Abdul Kareem
Electrical & Instrumentation Engineer
: +966 592072849, Email: almas@atlasbco.com
almassyedva@gmail.com
6|Page