Ovis 1
Ovis 1
Y12@15C/C
A B C D E F
4.70
2.00
2.80
4.70
1.90
PARAPET AS PER ARCH
D HEIGHT WITH COPPING BEAM
SEC
1 ADD Y12@15C/C
2.00
2.00
D
SEC
3
1.00
Y12@150 C/C T&B
D
SEC
D
SEC
SECTION --A-A
0.90 D D
8.85
4
SEC
2.00
SEC Y12@150 C/C T&B
12.70
3.60 400 400
COPPING BEAM
400
400
5 S2
26
S2
26
S2
26
3.40 Y12@150 C/C T&B
PC(PLANTED COLUMN)
B
Y12@150 C/C T&B SEC
1.90
7 3Y16 T&B ALL SIDE OF OPENING
1.55 C
SEC
SLAB AS PER SCHEDULE
SLAB AS PER SCHEDULE
8 A
SEC
COPPING BEAM
BEAM AS PER SCHEDULE
MEP SHAFT ADD Y16 @15 C/C
SECTION --C-C
SECTION --D-D
SEC-1-1
0.20
0.59 0.70
0.93 0.88
ARCHITECT ENG MUHAMMAD EL BAYAD REGISTRATION NO 115940
1.10
0.80 0.40B3 ADD 3Y16 T&B
SHORT SPAN LONG SPAN SHORT SPAN LONG SPAN PLOT :- 6153027
S1 26 CM Y12@15C/C Y12@15C/C Y12@15C/C Y12@15C/C FLAT SLAB DWG. TITLE :
· CB2 0.20 0.70 4Ø16 2Ø16 4+2Ø16 ---- ---- 2Ø16 Ø10 @ 0.10 C/C Ø10 @ 0.15 C/C Ø10 @ 0.10 C/C 2 LEGS
WWW.ALTASEES.AE
HB1 0.60 0.26 6Ø16 6Ø16 6Ø16 6Ø16 ---- ---- Ø10 @ 0.10 C/C Ø10 @ 0.15 C/C Ø10 @ 0.10 C/C 4 LEGS
E-MAIL: TASEES.CONSULTING@GMAIL.COM
B3 0.20 0.80 6Ø16 2Ø16 6Ø16 2Ø16 2Ø16 2Ø16 Ø10 @ 0.10 C/C Ø10 @ 0.15 C/C Ø10 @ 0.10 C/C 2 LEGS
08 FIRST FLOOR SLAB LAYOUT DESIGNED BY: ENG. SHUJAH BABAR QURESHI SCALE: 1:100