Determining Productivity Rate

Bill Code Trade Scope Description Productivity per Man-


Hour
1.2.1 Permit Application of Power Supply
1.2.2 Approval of Power Supply
1.3.1 Technical SubmiSchematic Drawing
1.3.2 Floor Plan Drawing
1.3.3 Material Submission Approval
1.4.1 Mobilisation Equipment
1.4.2 Manpower
1.5.1 FAT (TX & SG) Transformer
1.5.2 Switchgear
1.6.1.1 Lighting & SSO Existing Building - Trunking & Pipe Installation
1.6.1.2 Existing Building - Cable Laying
1.6.1.3 Existing Building - Lighting Installation
1.6.1.4 Existing Building - Cable Termination
1.6.2.1 Utility Area - Trunking & Pipe Installation
1.6.2.2 Utility Area - Cable Laying
1.6.2.3 Utility Area - Lighting Installation
1.6.2.4 Utility Area - Cable Termination
1.6.3.1 Process Area - Trunking & Pipe Instalation
1.6.3.2 Process Area - Cable Laying
1.6.3.3 Process Area - Lighting Installation
1.6.3.4 Process Area - Cable Termination
1.7.1.1 High Voltage WoTNB Side - Underground Cable Pipe
1.7.1.2 TNB Side - Underground Cable Laying
1.7.1.3 TNB Side - TNB Signboard
1.7.1.4 TNB Side - Mosquito Netting
1.7.1.5.1 TNB Side - Meter Kiosk Panel - Meter Kiosk Panel Delivery
1.7.1.5.2 TNB Side - Meter Kiosk Panel -Meter Kiosk Panel Installation
1.7.1.5.3 TNB Side - Meter Kiosk Panel - Meter Kiosk Panel Wiring
1.7.1.5.4 TNB Side - Meter Kiosk Panel - Cable Tray Installation
1.7.1.6.1 TNB Side - SPN 63A DB Panel - SPN 63A DB Panel Delivery
1.7.1.6.2 TNB Side - SPN 63A DB Panel - SPN 63A DB Panel Installation
1.7.1.6.3 TNB Side - SPN 63A DB Panel - SPN 63A DB Panel Wiring
1.7.2.1.1 Consumer Side - SG & TX Room - VCB 1, VCB 2 & Panel Delivery
1.7.2.1.2 Consumer Side - SG & TX Room - VCB 1, VCB 2 & Panel
1.7.2.1.3 Consumer Side - SG & TX Room - Cable Laying (TNB-CGSR)
1.7.2.1.4 Consumer Side - SG & TX Room - Cable Laying (CGSR-SG&TX)
1.7.2.2 HT Earthing System
1.7.2.3.1 CGSR Room (New Switchgear) - VCB 3 & Panel Delivery
1.7.2.3.2 CGSR Room (New Switchgear) - VCB 3 & Panel Installation
1.7.2.3.3 CGSR Room (New Switchgear) - Transformer Delivery
1.7.2.3.4 CGSR Room (New Switchgear) - Transformer Installation
1.7.2.3.5 CGSR Room (New Switchgear) - Cable Laying (SG&TX-MSB)
1.7.2.4 Termination HT Cable
1.7.2.5 Energization HT System
1.8.1.1 Electrical Board Main Switch Board (MSB) - MSB Delivery & Installation
1.8.1.2 Main Switch Board (MSB) - Sub Switch Board
1.8.2.1 DB-TX - Delivery & Installation
1.8.3.1 DB-Room 1 - Delivery & Installation
1.8.4.1 DB-MR - Delivery & Installation
1.8.5.1 DB-Room 2 - Delivery & Installation
1.8.6.1 DB-MSB - Delivery & Installation
1.8.7.1 DB-Chiller - Delivery & Installation
1.8.8.1 DB-P - Delivery & Installation
1.8.9.1 DB-PH - Delivery & Installation
1.8.10.1 DB-Consumer - Delivery & Installation
1.9.1 CCTV Delivery
1.9.2 Existing GF
1.9.3 Existing FF
1.9.4 Existing SF
1.10.1 Card Access Sys Delivery & Installation
1.10.2 Existing GF
1.10.3 Existing FF
1.10.4 Existing SF
1.11.1 Earthing System Main and Auxiliary Earthing
1.11.2 Earth Chamber
1.12.1.1.1 Motor & Pump Utility Area - Boiler - Ladder, Tray, Trunking & Pipe
1.12.1.1.2 Utility Area - Boiler - Cable Laying
1.12.1.1.3 Utility Area - Boiler - Cable Termination
1.12.1.2.1 Utility Area - Chiller - Ladder, Tray, Trunking & Pipe
1.12.1.2.2 Utility Area - Chiller - Cable Laying
1.12.1.2.3 Utility Area - Chiller - Cable Termination
1.12.1.3.1 Utility Area - Dryer & Compressor - Ladder, Tray, Trunking & Pipe
1.12.1.3.2 Utility Area - Dryer & Compressor - Cable Laying
1.12.1.3.3 Utility Area - Dryer & Compressor - Cable Termination
1.12.1.4.1 Utility Area - Fire Fighting System - Ladder, Tray, Trunking & Pipe
1.12.1.4.2 Utility Area - Fire Fighting System - Cable Laying
1.12.1.4.3 Utility Area - Fire Fighting System - Cable Termination
1.12.1.5.1 Utility Area - City Water Pump - Ladder, Tray, Trunking & Pipe
1.12.1.5.2 Utility Area - City Water Pump - Cable Laying
1.12.1.5.3 Utility Area - City Water Pump - Cable Termination
1.12.2.1.1 Process Area - Ca-St Process - Ladder, Tray, Trunking & Pipe
1.12.2.1.2 Process Area - Ca-St Process - Cable Laying
1.12.2.1.3 Process Area - Ca-St Process - Cable Termination
1.12.2.2.1 Process Area - Zn-St Process - Ladder, Tray, Trunking & Pipe
1.12.2.2.2 Process Area - Zn-St Process - Cable Laying
1.12.2.2.3 Process Area - Zn-St Process - Cable Termination
1.12.2.3.1 Process Area - Air & Twin Screw Packer - Ladder, Tray, Trunking & Pipe
1.12.2.3.2 Process Area - Air & Twin Screw Packer - Cable Laying
1.12.2.3.3 Process Area - Air & Twin Screw Packer - Cable Termination
1.12.2.4.1 Process Area - ACM Mill - Ladder, Tray, Trunking & Pipe
1.12.2.4.2 Process Area - ACM Mill - Cable Laying
1.12.2.4.3 Process Area - ACM Mill - Cable Termination
1.13.1 Street/Compound Trunking & Pipe Instalation
1.13.2 Cable Laying
1.13.3 Lighting Installation
1.13.4 Cable Termination
1.14.1.1 InstrumentationCa-St Process - Auto Valve
1.14.1.2 Ca-St Process - Load Cell
1.14.1.3 Ca-St Process - Temperature Sensor
1.14.1.4 Ca-St Process - Pressure Sensor
1.14.2.1 Zn-St Process - Auto Valve
1.14.2.2 Zn-St Process - Load Cell
1.14.2.3 Zn-St Process - Temperature Sensor
1.14.2.4 Zn-St Process - Pressure Sensor
1.15.1 Lightning SystemRoof & Aluminium Tape
1.15.2 Earth Chamber
1.16.1 Testing & CommiHT Earthing System
1.16.2 EXLV
1.16.3 LV
1.17 Handover
Productivity per No. of Manpower Productivity per day Remarks
manpower per day

el Installation

el Installation

& Panel Delivery

CGSR-SG&TX)

G&TX-MSB)
y, Trunking & Pipe

y, Trunking & Pipe

runking & Pipe

nking & Pipe

nking & Pipe

r, Tray, Trunking & Pipe

Termination
Reference