Professional Documents
Culture Documents
Bill of Supply For Electricity: Area Details Connection Details Supply and Meter Details
Bill of Supply For Electricity: Area Details Connection Details Supply and Meter Details
Last Bill Payment Made Rebate Net Arrear in Current bill Adj/Inst Net Payable Amount
Amount Rs. amount
Before Rbt. Dt.(Rs.) After Rbt. Dt.(Rs.)
2,973.00 2,866.00 -107.46 0.00 2,973.38 -0.00
2,921.00 2,973.00
Current Bill Details
a. Energy Charges 2,724.40 1. Sundry Adjustment
Slab 1 - KWH 50@ 3.00 150.00 Debit 0.00
Slab 2 - KWH 150@ 4.80 720.00 Credit 0.00
Slab 3 - KWH 200@ 5.80 1,160.00 2. Interest on SD(After TDS) 0.00
Slab 4 - KWH 112@ 6.20 694.40 3. Miscellaneous Charge 0.00
b. Incentive on TOD 0.00 4. Total Current Bill(Aft Adj/Inst) 2,973.38
5. Rebate Allowable
c. Demand Charge / MMFC 140.00 Prompt Payment+Rural+Special -51.20
d. Overdrawal penalty 0.00000 6. Net Current payment after Rebate 2,922.00
e. Penalty for Fall in PF 0% 0.00 Digital Payment Rebate -56.26
f. Power Factor Incentive 0.00 7.Net Current payment after Digital 2,865.00
g. Colony KvaH charge 0.00 8. Cross Subsidy Charges 0.00
h.Load Factor Rebate/ Special Discount 0.00 / 0.00 9. Disputed Amount 0.00
i. Electricity Charge 2,864.40 10. Last Rebate Allowed 107.46
(a-b+c+d+e-f+g+h) 11. ASD Claimed 0.00
j. Electricity Duty (4%) 108.98 Message
1. The connection shall be liable for disconnection on non-payment of all dues(including arrears of previous bill(s) by due date, after notice as
k. Delayed Payment Surcharge 0.00 per Section 56(1) of the Electricity Act,2003. 2. Cheque/bank draft is to be issued in favour of TPWODL. 3. Disputed amount is to be finilised
on the outcome of the order of the respected court and the applicable. 4. ECS Opt-in. 5.Date wise last 5 payments detail with component wise
l. Meter Rent 0.00 adjustment are shown in annexure (second page). Payments has been clubbed in case of more than 5 payments from last billing cycle. 6.For
FY 2020-21, final TCS amount will be intimated after reconciliation. From FY 2021-22, TCS shall be levied based on collection.
m. Customer Service Charge 0.00
n. R.I. Surcharge 0.00
o. Tax Collection at Source 0.00
p. Current Total (i+j+k+l+m+n+o) 2,973.38
Division Office Connect at Connect us
EXECUTIVE ENGINEER (ELECT.), TPWODL, ROURKELA ELECTRICAL DIVISION,
ROURKELA, AT-UDIT NAGAR, ROURKELA, DIST-SUNDERGARH, PIN-769015 consumercare@tpwesternodisha.com 1912/ 1800 345 6798
Page: 1/2
For Detail log on to our website www.tpwesternodisha.com. Alternatively you can call at 1912 (24x7 Toll Free).
Head Office: TP WESTERN ODISHA DISTRIBUTION LTD
AT/PO-BURLA, SAMBALPUR, ODISHA- 768017
CIN- U40100OR2020SGC035320 PAN- AAICT3326R TAN- BBNT01931A
CA No. : 811001010776 Invoice Number: 811010101221529
ARREAR UPTO LAST MONTH
EC ED DPS TCS / ISD MISC TOTAL
PY 0.00 0.00 0.00 0.00 0 0.00
CY -0.16 0.00 0.00 0.00 0 -0.16
LM 2,864.40 108.98 0.00 0.00 0 2,973.38
PX 0.00 0.00 0.00 0.00 0 0.00
Total 2,973.22
*Abbrevations: PY- Previous Year CY- Current Year LM- Last Month PX- Deferred Amount
DPS Details
NO DPS CHARGED
Page: 2/2