Professional Documents
Culture Documents
Field Inspection Report - Intermediate and Finish Painting Inspection Record For Piping
Field Inspection Report - Intermediate and Finish Painting Inspection Record For Piping
0
TECHNIP KT INDIA LTD.
Report No:
PROJECT : DIESEL HYDROTREATER PROJECT
CLIENT :HPCL - VISAKH REFINERY
PMC: TOYO ENGINEERING INDIA LIMITED Date:-
Unit: DIESEL HYDROTREATER UNIT TPKTI Project No : 776
Field Inspection Report -
TECHNIP KT INDIA LTD
INTERMEDIATE AND FINISH PAINTING INSPECTION RECORD FOR
PIPING
Drawing No :
10
11
12
13
14
15
Legend :
DFT 'A2' = Primer Coat 2nd DFT 'B2' = 'B1' + Intermediate Paint Coat 2nd
DFT 'B1' = 'A2' + Intermediate Paint Coat 1st DFT 'C' = 'B2' + Finish Paint Coat
Signature :
Name :
Date :