REFERENCE DRAWING: NOTES:

RA 265-5-J26-SDD-309-T0 - R0 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS


RA 265-5-J16-SDD-309-T0 - R0 SPECIFIED OTHERWISE.
RA 265-5-J18-SDD-309-T0 - R0
2. DESIGN BASED ON:
-PRECAST CONCRETE
CLASS K415, f'c=35.0MPa (28 DAYS CYLINDER
STRENGTH) MAX. SIZE AGGREGATE = 20mm.
-IN-SITU CONCRETE
CLASS K415, f'c=35.0MPa (28 DAYS CUBE
STRENGTH) MAX. SIZE AGGREGATE = 20mm.
-STEEL REINFORCEMENT
HIGH STRENGTH DEFORMED BARS GRADE 60,
MINIMUM YIELD STRENGTH fy=420 MPa.
3. ALL CHAMFERS TO BE AS PER PROJECT
SPECIFICATION.
15 4. FORMWORK FOR THE PRECAST PARAPET TO BE
PROVIDED BY MAIN CONTRACTOR.
5. CONCRETE BARRIER SHALL NOT BE SUPPORTED
15 T10 - 150 ON THE R.E. WALL PANELS AND SHALL NOT BE
STRUCTURALLY CONNECTED TO THE PANELS
DURING INSTALLATION AND SERVICE.
6. MINIMUM LENGTH OF BASE SLAB FOR STABILITY =
16 T10 - 150 11.98m. BASE SLAB SHELL NOT HAVE ANY
TRANSVERSE JOINTS, EXCEPT CONSTRUCTION
JOINTS. EACH SLAB SUPPORTS MINIMUM 6
PARAPETS STITCHED TO SLAB BY CAST-IN-SITU
16
STITCH BEAM.
7. SINGLE PARAPET UNIT SHALL NOT BE

125 STRUCTURALLY CONNECTED TO TWO ADJACENT


COUNTERBALANCE SLABS; OR CONNECTED TO
APPROACH SLAB AND COUNTER BALANCE SLAB AT
D D THE SAME TIME.
8. ALL LONGITUDINAL BARS ARE DIA.12-300mm WITH:
SECTION D-D - 11.98m LENGTH FOR FULL LENGTH AT

PRECAST FASCIA WITH NIB COUNTERBALANCE SLAB AND STITCH BEAM.


- 1.98m LENGTH AT PARAPETS.
(DIMENSIONAL DETAILS) 9. CONTRACTOR TO PREPARE FINAL BAR BENDING
SECTION A-A SCHEDULE. Final BBS will be submitted seperately
10. FOR BARRIER DESIGN CALCULATIONS, REFER
BARRIER REPORT DOCUMENT NUMBER
"2429-BD-01".
Concrete cover = 50 mm
PROJECT DIRECTOR
A A FOR APPROVAL ACTION SIGNATURE DATE
A
B

150 178 202 222 302 397 391 C


CERTIFIED FOR CO-ORDINATION AND COMPLIANCE WITH
THE CONTRACT DOCUMENTS EXECPT AS NOTED
7 T12 TRADE CONTRACTOR SIGNATURE DATE
ROADS
STRUCTURE
C C
Eng. Ahmed El Awady

UTILITIES
SURVEY
9 T10 - 120 1c T16 - 200 TELEPHONE

10 T10 - 120 1a & 1b T20 - 400 & T16 - 400


Alternately
1 22/09/22 REVISED REINFORCEMENT MM
11 T10 - 120 0 22/06/22 FIRST ISSUE OM
3a & 3b T16 - 400 & T12 - 400 REV. DATE DESCRIPTION BY
12a T10 - 120 Alternately

12b T10 - 120 4 T12 - 200 Check for bar mark (7) STATE OF KUWAIT
B 5 T16 - 200
to be as in IFC ( 10 mm )
12c T10 - 120 6a & 6b T16 - 200 & CLIENT:
8 T12 T12 - 200
13 T10 - 120 Alternately
CONSULTANTS:
1d T12 - 200
DETAIL X
In association with
TYPICAL PLAN 2 T25 - 100 DAR SSH INTERNATIONAL ENGINEERING.
B 3c T12 - 200 CONSULTANTS (SSH) KUWAIT

CONTRACTOR:

SUB CONTRACTOR:
SECTION A-A - REINFORCEMENT DETAILS FREYSSINET KUWAIT (WLL)
PO Box 23755-SAFAT 13098-KUWAIT
Tel:+965 2 2250790 R

Fax:+965 2 2250792
email: fme@freyssinetme.sofr.me

PROJECT NAME:
1 RA / 265
CONSTRUCTION, COMPLETION & MAINTENANCE
OF AL GHOUSE ROAD FROM
7th RING ROAD TO FAHAHEEL ROAD(ROAD 212)
DRAWING STATUS:

SHOP DRAWING

1 SECTION 1-1 DRAWING TITLE:

REINFORCED EARTH® MSE WALLS


TYPICAL BARRIER DETAILS

DETAIL - X SECTION C-C DRAWN BY OM CHECKED BY NHL


DATE 22.06.2022. APPROVED BY GK

SECTION B-B SCALE AS SHOWN REVISION R1

DRAWING No RA-265-MSE-GEN-SD-TYP-003